Salem Generating Station, Units 1 and 2 - Final Supplemental Response to Generic Letter 2004-02
ML12129A388
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/27/2012
From: Fricker C J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-04-002, LR-N12-0124
Download: ML12129A388 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC 10 CFR 50.54(f)LR-N12-0124 April 27, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Subject:

References:

Final Supplemental Response to Generic Letter 2004-02 (1) NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, September 13, 2004, ADAMS Accession No. ML042360586 (2) Draft Salem, Units 1 and 2, Updated Supplemental Response to Generic Letter 2004-02, May 27, 2010, ADAMS Accession No.ML101540137 (3) 6/23/2010 Summary of Category 1 Public Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2, ADAMS Accession No. ML101800477 On September 13, 2004, the NRC issued the Reference 1 letter, Generic Letter (GL) 2004-02.GL 2004-02 requested that each plant perform an evaluation of the Emergency Core Cooling System and Containment Spray System recirculation functions in light of the information provided in the Generic Letter, and, if appropriate, take additional actions to ensure system function.PSEG Nuclear LLC (PSEG) provided a number of responses to GL 2004-02, including a draft updated supplemental response on May 27, 2010 (Reference 2). The NRC staff provided feedback to PSEG on the revised draft response during a public meeting on June 23, 2010, summarized in Reference

3. PSEG hereby submits the final supplemental response to Generic Letter 2004-02 as Attachments 1 through 8.There are no new regulatory commitments contained in this submittal.

If you have any questions or require additional information, please do not hesitate to contact Ms.Emily Maguire at (856) 339-1023.95-2168 REV. 7/99 LR-N12-0124 Page 2 10 CFR 50.54(f)I declare under penalty of perjury that the foregoing is true and correct.Executed on (Date)Carl/J. Fricker Site Vice President

-Salem Generating Station Attachments

1. Final Supplemental Response for Salem 2. Updated Response to February 9, 2006 RAIs 3. Updated Response to Draft Audit Open Items 4. Updated Response to Final Audit Open Items 5. Updated Response to December 17, 2008 RAIs 6. References
7. CSS and ECCS P&ID Drawings 8. Response to February 4, 2010 RAIs cc: Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator