MONTHYEARML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-16-0046, Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 20262016-06-0808 June 2016 Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 2026 LIC-15-0136, Steam Generator Eddy Current Test Report, 2015 Refueling Outage2015-11-24024 November 2015 Steam Generator Eddy Current Test Report, 2015 Refueling Outage LIC-15-0107, Refueling Outage Inservice Inspection Results2015-09-0808 September 2015 Refueling Outage Inservice Inspection Results LIC-15-0089, Submits Relief Requests Associated with the Fifth Inservice Testing Interval2015-08-27027 August 2015 Submits Relief Requests Associated with the Fifth Inservice Testing Interval LIC-15-0021, Revised 2011 Refueling Outage Lnservice Inspection Results2015-02-27027 February 2015 Revised 2011 Refueling Outage Lnservice Inspection Results LIC-14-0099, Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval2014-11-0303 November 2014 Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval LIC-14-0039, Refueling Outage Inservice Inspection Results2014-03-14014 March 2014 Refueling Outage Inservice Inspection Results ML1007804002010-03-18018 March 2010 Refueling Outage Inservice Inspection Results LIC-08-0102, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2008-09-15015 September 2008 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-07-0019, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2007-03-0202 March 2007 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-05-0118, Generator Eddy Current Test Report - 2005 Refueling Outage2005-09-23023 September 2005 Generator Eddy Current Test Report - 2005 Refueling Outage LIC-05-0100, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2005-08-29029 August 2005 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-04-0007, 2003 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2004-01-28028 January 2004 2003 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-03-0158, Re-Submittal of the Fort Calhoun Station (FCS) Inservice Testing (IST) Program Plan for the Fourth 120 Month Interval (2004-2013)2003-12-0505 December 2003 Re-Submittal of the Fort Calhoun Station (FCS) Inservice Testing (IST) Program Plan for the Fourth 120 Month Interval (2004-2013) LIC-03-0083, Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components2003-06-0404 June 2003 Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components LIC-03-0078, Response to Nrc'S Request for Additional Information - Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval2003-05-16016 May 2003 Response to Nrc'S Request for Additional Information - Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval 2024-03-10
[Table view] Category:Letter type:LIC
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-06-18
[Table view] |
Text
Omaha Public Power Distict 444 Soutth 16thl Street Mall Omalha NE 68102-2247 June 4, 2003 LIC-03-0083 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1. Docket No. 50-285
- 2. Letter from OPPD (R. L. Phelps) to NRC (Document Control Desk) dated May 1, 2003, Relief Request: Visual Inspection of Inaccessible Piping and Components (LIC-03-0062)
Subject:
Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components This letter replaces Omaha Public Power District's (OPPD's) relief request, "Visual Inspections of Inaccessible Piping and Components", submitted in Reference 2. This revised request proposes inspections and/or provides additional information in response to NRC requests made during a May 12, 2003 phone call.
Pursuant to the provision specified in 10 CFR 50.55a(a)(3)(ii), OPPD requests relief from certain requirements of the ASME Boiler and Pressure Vessel Code. These relief requests pertain to IWA-5240, Visual Examination. During Code required Pressure Testing, a VT-2 visual examination shall be conducted by examining the accessible external exposed surfaces of pressure retaining components for evidence of leakage. The specifics of the revised relief requests are detailed in the attachment to this letter and are intended to be applied to the performance of the inservice inspection (ISI) examination for the Third and Fourth Ten Year ISI Interval.
No commitments are made to the NRC in this letter. If you have any questions or require additional information, please contact Dr. R. L. Jaworski at (402) 533-6833.
Sincerely,
/ ivision Magr/
Nuclear Op'ration RTR/rlj Employnent wit)t Equal Opportuntity
U. S. Nuclear Regulatory Commission LIC-03-0083 Page 2
Attachment:
Fort Calhoun Station Revised Relief Request for Visual Inspection of Inaccessible Piping and Components c: Thomas P. Gwynn, Acting Regional Administrator, NRC Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector
LIC-03-0083 Attachment Page 1 ATTACHMENT Fort Calhoun Station Revised Relief Request for Visual Inspection of Inaccessible Piping and Components
LIC-03-0083 Attachment Page 2 ISI PROGRAM RELIEF REQUEST NUMBER: RR-8 System: Reactor Coolant, Safety Injection and Chemical and Volume Control Class: Class 1, 2 and 3 piping Test Requirements:
IWA-5240, Visual Examination: During Code required Pressure Testing, a VT-2 visual examination shall be conducted by examining the accessible external exposed surfaces of pressure retaining components for evidence of leakage.
Basis for Justification:
This relief request is submitted pursuant to 10 CFR 50.55(a)(3)(ii). Several piping or component sections in these systems at Fort Calhoun Station (FCS) are considered to have inaccessible external surfaces during the time frame and plant conditions required to reach acceptable test pressure. Several factors are considered when evaluation of a piping inspection area results in an inaccessible area determination. These factors may include ALARA or radiological conditions (both dose rate and contamination level), the amount of useful information gained should the visual inspection be conducted, amount of work and effort required to obtain access to the area to be inspected, other testing and/or practices which may contribute to assurances that plant piping systems or components are intact and not leaking.
Areas for which relief is requested:
- 1) Area under the Reactor Vessel Radiological Conditions:
Access to this area is posted as a Restricted High Radiation Area and a Surface Contamination Area. Access is currently prohibited when fuel is loaded in the core. Maintenance and inspection activities are scheduled and performed under the Reactor Vessel during periods when the fuel is off-loaded. Estimated exposure for conduct of a VT-2 visual examination of this area, with insulation in place and fuel in the vessel is R. This is a recurring dose estimate and does not include additional intermittent exposure for decontamination and radiological monitoring of the area for routine entrance and inspection.
Information Gained by Visual Inspection:
Direct visual access of the Reactor Vessel is not available without removal of insulation panels protected by stainless steel sheathing. The best information gained by the VT-2 visual examination would be discoloration on stainless steel sheathed insulation surfaces or evidence of Boric Acid residue on these surfaces.
LIC-03-0083 Attachment Page 3 The area under the FCS reactor vessel is designed as a sump area and used as a water collection point for plant operations and maintenance.
Other Inspections. Practices and or Design Features:
Reactor Vessel welds are inspected both by visual and ultrasonic testing (UT) methods from the interior of the vessel at ASME code required intervals. The most recent UT examination showed no significant indications and no evidence of indication growth. The FCS Reactor Vessel has no penetrations in the lower area (including instrumentation penetrations). Unknown leakage from the Reactor Coolant System is closely monitored on a daily basis by surveillance test. Sump levels and alarms also provide a measure of unexpected leakage.
The lower vessel head is of insignificant risk to cracking for the following reasons:
a) The fluence to the welds and plate material is less than 1017 n/cm2 ,
which is below the Generic Aging Lessons Learned (GALL) Report threshold of evaluation.
b) A Pressurized Thermal Shock (PTS) analysis (Reference CEN-636, Revision 02, 7/19/00 which was reviewed and approved in FCS Technical Specification Amendment 199) concludes that the FCS Reactor Vessel beltline welds have conservative chemistry factors for PTS.
c) The pressure stresses that are governing, in a hemisphere are /2 of that of the cylindrical shell.
d) There are no bottom head penetrations which could create stress concentration factors/leakage sources or bimetallic effects.
Alternative Testing:
FCS proposes to conduct a VT-2 visual examination during each refueling outage.
This inspection would be conducted while the reactor vessel is not pressurized and nuclear fuel is off-loaded. The inspection will check insulation surfaces for signs of leakage or residue. If signs of leakage or residue are found, additional inspection will be conducted to determine the source. Additional inspection may include removal of insulation to gain visual access to the vessel lower head.
Leakage or water on the floor area is not indication of vessel leakage. This area is designed and used as a sump or liquid collection area and water may be expected on the floor of the area.
- 2) Safety Injection Piping in "Sub-hulls" (SI-9 & SI-10)
Other Inspections, Practices and or Design Features:
Sub-hulls are special enclosures for valves HCV-383-3 and HCV-383-4 (Containment Sump Suction Valves). These Containment vessels receive a Type B Leakage Rate Test in accordance with 10CFR50 Appendix J (at 60 psig) each
LIC-03-0083 Attachment Page 4 refueling outage. The access openings are large bolted manway covers. Removal of these covers solely for inspection would result in undue hardship with no corresponding increase in plant safety. Type B testing would have to be performed after closure of the manway. Additionally, Type B leakage rate testing is conducted on the piping from the sump strainer to the associated valve on a schedule determined by the FCS Containment Leakage Rate Test Program.
Periodic Motor Operated Valve (MOV) testing is conducted on the valves in the sub-hulls at routine intervals, currently every five years.
Sub-hulls are opened intermittently for maintenance and test. No evidence of leakage has been noted during these entries. Containment Leakage Rate Testing results and recent code required IWE inspection of the sub-hulls did not find deterioration or other problems.
Alternative Testing:
FCS proposes to inspect piping and components in the sub-hulls during periods when the sub-hulls are open for testing and/or maintenance activities. A VT-2 visual inspection will be conducted when the sub-hull is open concurrent with MOV maintenance and/or testing, currently scheduled every five years. Since this piping is sump suction piping it will not be pressurized during the inspection.
Bolting and carbon steel surfaces in the sub-hull will be inspected for any indication of leakage or deterioration.
Reference P&ID: E23866-210-130 3
- 3) Ion Exchanger Room 62 & Purification Filter Vault Radiological Conditions:
Access to this area is posted as a Restricted High Radiation Area. Estimated exposure for conduct of a VT-2 visual examination of this area is significantly greater than R. General Area dose rate has been estimated at 800R/hr.
Operations (resin sluicing, backwash, etc.) result in intermittent pressurization of piping segments in this area. Several entries would be required to complete the inspection of all piping as required by the ASME Section XI code. Cost to discharge and dispose of resins, specifically to reduce radiation levels in the room, are estimated to exceed $250,000.
Other Inspections. Practices and or Design Features:
The area radiation monitor (RM-082) would detect and trend leakage in this area should it occur. The Reactor Coolant inventory daily monitoring surveillance testing would also lead to quick and positive identification of leakage from this piping.
LIC-03-0083 Attachment Page 5 In 2001 a minor leak was identified at a valve mechanical connection in the Purification Filter Vault. A general area inspection performed during the repair/maintenance of the connection, conducted by Radiation Protection and Maintenance Department personnel, did not find additional evidence of leakage.
Alternative Testing:
FCS proposes to conduct VT-2 visual examination of piping in this area at a frequency of every 10 years (once per interval). The inspection criteria would include evidence of leakage from any piping with additional attention to bolted connections which may have carbon steel fasteners. The VT-2 visual examination would be conducted during convenient outage periods and would not require that piping be pressurized during the inspection.
Reference P&ID: E-23866-210-120 2A
- 4) Entrenched Piping
- Between purification filters and Volume Control Tank (VCT)
- Between Charging Pumps and Regenerative Heat Exchanger
- Between TCV-211-2 and Letdown Strainer
- Betveen Charging Pumps and High Pressure Safety Injection (HPSI) header
- Between ion exchangers and purification filters Other Inspections. Practices and or Design Features:
This piping is contained in a piping trench covered by large concrete plugs that, although removable, require in excess of 48 man-hours to lift and set aside. The plug weight is nominally 4500 pounds for each of the eleven. The blocks interlock such that a specific installation and removal sequence is required. The entrenched piping is approximately sixty feet in length. Block removal creates a significant disruption in the Corridor 26 area inside the Auxiliary Building since open trenches may create both safety and access problems. This creates a hardship with no corresponding increase in plant safety.
Flow through these piping segments is routinely monitored during plant operations. Changes to volume control tank level are monitored and trended, ion exchanger flows are verified by daily coolant sampling and analysis, plant coolant and letdown operations are closely monitored to ensure the expected plant response is obtained. Significant leakage in any of the entrenched piping would be quickly noticeable.
There are no mechanical joints or components contained in the trench. All piping is stainless steel and has welded joints. Recent (2001) inspection of the area revealed no evidence of past or current fluid leakage.
LIC-03-0083 Attachment Page 6 Alternative Testing:
FCS proposes piping in the trench be treated similar to buried piping. FCS proposes the piping in the trench receive a VT-2 visual examination if opened for maintenance or modification and/or have a VT-2 visual examination at a maximum frequency of every 10 years (once per interval). All piping would not be pressurized during the inspection. Indications of flow decrease during operation in piping systems contained in the trench will be promptly investigated.
Reference P&ID: E-23866-210-120 Period for which Relief is requested:
This relief is requested for the remainder of the Third Interval and for the Fourth Interval as described in ASME Section XI Code. Code of reference for 3 rd and 4 tIh Ten Year intervals are ASME XI 1989 Edition and 1998 Edition, 2000 Addenda respectively. Proposed inspection frequencies will commence when relief is granted.