MONTHYEARLIC-16-0046, Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 20262016-06-0808 June 2016 Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 2026 LIC-15-0136, Steam Generator Eddy Current Test Report, 2015 Refueling Outage2015-11-24024 November 2015 Steam Generator Eddy Current Test Report, 2015 Refueling Outage LIC-15-0107, Refueling Outage Inservice Inspection Results2015-09-0808 September 2015 Refueling Outage Inservice Inspection Results LIC-15-0089, Submits Relief Requests Associated with the Fifth Inservice Testing Interval2015-08-27027 August 2015 Submits Relief Requests Associated with the Fifth Inservice Testing Interval LIC-15-0021, Revised 2011 Refueling Outage Lnservice Inspection Results2015-02-27027 February 2015 Revised 2011 Refueling Outage Lnservice Inspection Results LIC-14-0099, Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval2014-11-0303 November 2014 Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval LIC-14-0039, Refueling Outage Inservice Inspection Results2014-03-14014 March 2014 Refueling Outage Inservice Inspection Results ML1007804002010-03-18018 March 2010 Refueling Outage Inservice Inspection Results LIC-08-0102, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2008-09-15015 September 2008 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-07-0019, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2007-03-0202 March 2007 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-05-0118, Generator Eddy Current Test Report - 2005 Refueling Outage2005-09-23023 September 2005 Generator Eddy Current Test Report - 2005 Refueling Outage LIC-05-0100, Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2005-08-29029 August 2005 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-04-0007, 2003 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms2004-01-28028 January 2004 2003 Refueling Outage Inservice Inspection Results and NIS-1 and NIS-2 Forms LIC-03-0158, Re-Submittal of the Fort Calhoun Station (FCS) Inservice Testing (IST) Program Plan for the Fourth 120 Month Interval (2004-2013)2003-12-0505 December 2003 Re-Submittal of the Fort Calhoun Station (FCS) Inservice Testing (IST) Program Plan for the Fourth 120 Month Interval (2004-2013) LIC-03-0083, Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components2003-06-0404 June 2003 Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components LIC-03-0078, Response to Nrc'S Request for Additional Information - Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval2003-05-16016 May 2003 Response to Nrc'S Request for Additional Information - Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval 2016-06-08
[Table view] Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] |
Text
4015MM Omaha Public Power Distrct 444 Souts 16tht Street Mall Omahsa NE 68102-2247 May 16, 2003 LIC-03-0078 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk) dated December 20, 2002, Relief Requests Pertaining to the Fort Calhoun Station Inservice Inspection of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval (1993-2003) (LIC-02-0142) c 3. Letter from NRC (A. B. Wang) to OPPD (R. T. Ridenoure) dated April
- 25, 2003, Request for Additional Information - Relief Requests Pertaining to the Fort Calhoun Station (FCS) Inservice Inspection of the Reactor
- Pressure Vessel for the Third Ten Year ISI Interval (1993-2003) (TAC No. MB6986) (NRC-03-058)
- D: ::
- d
SUBJECT:
Response to NRC's Request for Additional Information - Inservice
--0 ; f:
Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year 0 ::'
ISI Interval
- D
- i:51 This letter responds to the Nuclear Regulatory Commission's (NRC's) Request for Additional C -:: 'I Information (Reference 3) with regard to Omaha Public Power District's (OPPD's) request,
- 1 I
"Relief Requests Pertaining to the Fort Calhoun Station (FCS) Inservice Inspection of the iS A.0i
. Reactor Pressure Vessel for the Third Ten Year ISI Interval (1993-2003)" (Reference 2).
-E 1
- : f >
f
.; This letter also withdraws two OPPD relief requests made in Reference 2; i.e., RR-1, Use of
- f :
Alternative to RPV Nozzle-to-Vessel Welds, and RR-4, Use of Code Case N-663 only for RPV Nozzle-to-Safe End Welds.
.)
I declare under penalty of perjury that the forgoing is true and correct. (Executed on May 16, 2003). No commitments are made to the NRC in this letter.
l A0-Emnployment wvith Equal Opportunity
U. S. Nuclear Regulatory Commission LIC-03-0078 Page 2 If you have any questions or require additional information, please contact Dr. R.L. Jaworski of the FCS Licensing staff at (402) 533-6833.
Sincerely, R. L. Phelps Division Manager Nuclear Engineering RLP/RLJ/rlj Attachment c: E. W. Merschoff, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Winston & Strawn
LIC-03-0078 Attachment Page 1 RESPONSE TO THE NRC REQUEST FOR ADDITIONAL INFORMATION ON THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUESTS FOR RELIEF FOR OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION DOCKET NUMBER 50-285 NRC Request:
2.1(a) Please state the start and end dates for the third 10-year inspection interval at FCS.
FCS Response:
The start and end dates for the third 10-year inspection interval at FCS are September 26, 1993 to October 31, 2003.
NRC Requests:
2.2(a), (b), (c), and (d) pertaining to Request for Relief RR-1, Examination of Category B-D, Item B3.90, Pressure Retaining Nozzle Welds in Vessels, Alternative to Volumetric Weld Coverage Requirements FCS Response:
FCS has elected to withdraw this request for relief and perform the code required volumetric weld coverage requirements.
NRC Request:
2.3(a) On page 16 of the licensee's request (enclosure showing changes between Appendix VIII, Supplement 10 and the proposed PDI alternative), the PDI alternative in Section 2.4 table under the "Number of Flaws" does not agree with the table shown in the basis for relief, page 9. Please clarify.
FCS Response:
The tables are meant to be in exact agreement and identical in all respects. The confusion was caused by use of different printer and font settings in electronic copies. This discrepancy was discussed in a conversation between PDI personnel and the NRC (Dan Naujak) on March 28, 2003. PDI and the NRC agreed that this was not a technical issue.
NRC Request:
2.3(b) On page 24 of the licensee's request (enclosure showing changes between Appendix VIII, Supplement 10 and proposed PDI alternative), Section 4.0, item (d), it is stated that "To qualify new values of essential variables, at least one personnel qualification set is required." It is unclear whether this is intended to
i:- - -
LIC-03-0078 Attachment Page 2 require at least one successful personnel qualification with the new essential variables, or simply to include the number of specimens equal to one qualification set. Please clarify.
FCS Response:
(1) Fort Calhoun Station (FCS) wants to assure that the personnel being qualified are unable to predict the flaws in the test set.
(2) There are many essential variables with a broad range of applicability. For example, a typical piping procedure may address Supplement 2 austenitic welds and include intergranular stress corrosion cracking (IGSCC). In this particular case, a personnel test set would consist of a minimum of 10 austenitic flaws, accompanied by a minimum of 4 additional IGSCC flaws.
If a new essential variable were applicable to both, then all the above flaws would be included. If it were only applicable to IGSCC, a minimum of 4 additional IGSCC flaws would be included. It is intended that the qualification be successful (e.g., all flaws are detected/sized as appropriate),
and that it include the number of flawed/unflawed grading units equal to one qualification set.
NRC Requests:
2.4(a) Please indicate whether the alternative (including the comparison enclosure) provided in the licensee's request is the most current Supplement 14 version of the proposed PDI alternative.
FCS Response:
Supplement 14 RFR 1 (as well as Supplement 10 RFR 1) is not the most current version.
It has been replaced by RFR 2, which incorporates editorial changes made at the last ASME Section XI Code meeting and modifies the allowable tolerances of Supplement 2 and 3 components in paragraph 2.1.b. The RFR 1 versions were current when the relief request was prepared.
NRC Request:
2.4(b) The licensee's proposal is aimed at piping welds that are examined from the inner diameter surface using remote automated techniques. The licensee argues that to impose separate qualifications, as currently required by Supplements 2, 3 and 10, is excessive because the ultrasonic essential variables used for dissimilar metal, austenitic, and ferritic welds (when performed from the inner diameter) will be the same. Therefore, it is expected that the inner diameter applications may not be confronted with the same acoustic limitations, i.e., attenuation and beam redirection effects, as methods applied from the outside surface of these piping welds. However, situations may arise that may result in less than two sided examinations.
LIC-03-0078 Attachment Page 3 (1) It is unclear how the qualification of far-side examinations will be implemented. Provide a discussion on the implementation of far-side examinations for the different supplements.
(2) It is unclear how the coverage of far-side examinations will be determined.
Provide a discussion on coverage of far-side examinations for the different supplements.
FCS Response:
When applying Supplement 14, the following examination coverage criteria requirements and associated qualifications are appropriate and planned:
(1) Piping must be examined in two axial directions, and when examination in the circumferential direction is required, the circumferential examination must be performed in two directions, provided access is available. Dissimilar metal welds must be examined axially and circumferentially.
(2) Where examination from both sides is not possible, full coverage credit may be claimed from a single side for ferritic welds. Where examination from both sides is not possible on austenitic welds or dissimilar metal welds, full coverage credit from a single side may be claimed only after completing a successful single-sided demonstration using flaws on the opposite side (far-side) of the weld. Dissimilar metal weld qualifications must be demonstrated from the austenitic side of the weld and may be used to perform examinations from either side of the weld. To date all qualifications performed from the inside surface have been demonstrated with dual side access with scanning allowed from all 4 directions. This is consistent with how the examinations are performed in the field.
NRC Requests:
2.5(a), (b), (c), (d) pertaining to Request for Relief RR-4, Use of Code Case N-663 only for RPV Nozzle-to-Safe End Welds.
FCS Response:
FCS has elected to withdraw this request for relief. The N-662 code case number in Reference 2 is a typographical error. The correct code case number should be N-663.