Acceptance Review Supplemental Information for Emergency Plan Amendment Request
ML21208A194
Person / Time
Site: Beaver Valley
Issue date: 07/27/2021
From: Grabnar J
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPID L-2021-LLA-0127, L-21-201
Download: ML21208A194 (8)


Text

energy f;nergy / larhor X11c/ear Co,p.

harbor Beal'er r*alley Power Stu/ion P.O. lJox .:/

S'hippi11gpor1, PA 150 Jol,n J. Grahnar 2-1-682-5 34 Site J'ice !' resident. Beaver r'alley :\111clear July 27, 2021 L-21-201 10 CFR 50.90 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington , DC 20555-0001

SUBJECT:

Beaver Valley Power Station , Unit Nos. 1 and 2 Docket No. 50-334, License No . DPR-66 Docket No. 50-412 , License No. NPF-73 Acceptance Review Supplemental Information for Emergency Plan Amendment Request (EPID L-2021-LLA-0127)

Energy Harbor Nuclear Corp. (EHNC) submitted an Emergency Plan Amendment Request to the Nuclear Regulatory Commission (NRC) in a letter dated June 14, 2021 (Accession No. ML21167A209) . The proposed changes to the Beaver Valley Power Station , Unit Nos. 1 and 2 (BVPS) Emergency Preparedness Plan (EPP) would reduce the number of on-shift staff positions, extend augmented Emergency Response Organization (ERO) response times , and re-align augmented ERO response positions.

In a phone call and subsequent email on July 15, 2021 , the NRC staff notified EHNC that information was missing from Attachment 4 of the application. EHNC was requested to resubmit Attachment 4.

During the review of the attachment, it was identified that minor corrections were needed. On page 1, two empty blocks in the "Offsite Survey" row were shaded , and the shading was removed from the block "Senior Manager I Site RP Coordinator. " On pages 2 and 5, in the "Plant System Engineering/ Technical Support" row "Engineering Engineer" was changed to "Electrical Engineer." The enclosure to this letter provides the requested information , including the corrections noted. This revised table supersedes submitted in a letter dated June 14, 2021.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required , please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at 330-696-7208 .

Beaver Valley Power Station, Unit Nos. 1 and 2 L-21 -201 Page.2 I declare under penalty of perjury that the foregoing is true and correct. Executed on July 27 , 2021 .

Sincerely, John J. Grabnar

Enclosure:

, Beaver Valley Power Station EPP Table B-1 Comparison Chart cc: NRC Region I Administrator NRC Region Ill Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board West Virginia Emergency Management Division

Attachment 4 Beaver Valley Power Station EPP Table B-1 Comparison Chart (Five pages follow)

Beaver Valley Power Station (BVPS) On-Shift Table Comparison Major Functional Area and Position Title / Expertise 0654 Rev 1 BVPS BVPS Revised BVPS Tasks Table 8-1 Issue 8 Rev 33 Table B-1 Proposed On-shift Rev 1 On-Shift On-Shift On-shift On-Shift Plant Operation and Shift Manager (SRO) 1 1 2 1 2 Assessment of Operation Unit Supervisor (SRO) 1 1 2 Aspects Control Room Operator (RO) 2 2 4 Control Room Operator (AO) 2 2 6 Emergency Direction and Shift Manager (Emergency 1** 1** 1**

Control* Director)

Classification Classification Advisor 1**

Notification/ Communication Licensee/State/local/Federal 1 1 3** 1 1 Radiological Accident Senior Manager/ Site RP Assessment Coordinator

- Dose Assessment Dose Assessor 2** 1 1** 1**

- ln-Plant/Onsite Surveys RP Technician 1 1 and r 2 1 1

- Chemistry/ Chemistry Technician 1 1 1 Radiochemistry

- Protective Actions RP Technician 2** 1 and 2** 2** 1 1

- Offsite Surveys RP Technician 2**

Plant System Engineering / Shift Technical Advisor 1 1 1 1 1 Technical Support Core/Thermal Hydraulics 1**

Engineer Repair and Corrective Actions Radwaste Operator Mechanical Maintenance 1** 1** 1*"

Electrical Maintenance 1** 1** 1**

l&C Maintenance 1**

Firefighting Fire Brigade per Tech Specs Emergency Fire Brigade Squad*"* 5**

Rescue Operations and First- Emergency 2** 2**

Aid Squad**"

Site Access Controland Security personnel per security Security Security 1

Personnel Accountability plan Plan Plan Total On-Shift 10 11 20 5 6

  • Overall direction of facility response to be assumed by EOF director when all centers fully manned.
    • May be provided by shift personnel assigned other functions.
      • Emergency Squad is comprised of five individuals.

1

Beaver Valley Power Station (BVPS) 30 Minute Alert or Greater Augmented ERO Table Comparison Major Functional Area Position Title/ Expertise 0654 Rev 1 BVPS BVPS Revised BVPS Table B-1 Issue 8 Rev 33 Table B-1 Proposed Augment Rev 1 (30 min) (30-min) (30 min)

(30 min) (30 min)

Command and Control Emergency Director Classification Classification Advisor Notification / Commun ication Licensee/State/local/Federal 1 1 1 Radiological Accident Senior Manager / Site RP Assessment Coordinator

- Dose Assessment Dose Assessor 1 1 1

- ln-Plant/Onsite Surveys RP Technician 2 2 2

- Chemistry / Chemistry Technician Radiochem istry

- Protective Actions RP Technician 2 2 2

- Offsite Surveys FMT Lead and Driver 2 2 2 Plant System Engineering/ Core/Thermal Hydraulics 1 1 1 Technical Support Enqineer Electrical Engineer Mechanical Eng ineer Repair and Corrective Actions Radwaste Operator Mechanical Maintenance Electrical Maintenance 1 1 1 l&C Techn ician 1 1 1 OSC Supervisor RP Supervisor Mechanical Maintenance Supervisor Electrical Maintenance Supervisor l&C Supervisor Total Augmented ERO 11 11 11 NIA NIA 2

Beaver Valley Power Station (BVPS) 60 Minute Alert or Greater Augmented ERO Table Comparison Major Functional Area Position Title I Expertise 0654 Rev 1 BVPS BVPS Revised BVPS Table B-1 Issue 8 Rev 33 Table B-1 Proposed Augment Rev 1 (60 min) (60-min) (60 min)

(60 min) (60 min)

Command and Control Emergency Director 1 1 1 2 Classification Classification Advisor 1 Notification/ Communication Licensee/State/local/Federal 2 2 2 2 2 Radiological Accident Senior Manager/ Site RP 1 1 1 Assessment Coordinator

- Dose Assessment Dose Assessor 1 1

- ln-Plant/Onsite Surveys RP Technician 2 2 2 2 1

- Chemistry /

Chemistry Technician 1 1 1 Rad iochemistry

- Protective Actions RP Technician 2 2 2 1 2

- Offsite Surveys FMT Lead and Driver 2 2 2 2 2 Plant System Engineering / Core/Thermal Hydraulics 1 1 Technical Support Enoineer Electrical Engineer 1 1 1 1 1 Mechanical Engineer 1 1 1 1 1 Repair and Corrective Actions Radwaste Operator 1 1 1 Mechanical Maintenance 1 1 1 1 1 Electrical Maintenance 1 1 1 1 l&C Technician Maintenance Coordinator I 1 1 1 OSC Coordinator RP Coordinator 1 Mechanical Maintenance Coordinator Electrical Maintenance Coordinator l&C Coordinator Security Security Liaison 1 Total Augmented ERO 15 15 15 18 18 3

Beaver Valley Power Station (BVPS) 60 Minute SAE or Greater Augmented ERO Table Comparison Major Functional Area Position Title / Expertise 0654 Rev 1 BVPS BVPS Revised BVPS Table B-1 Issue 8 Rev 33 Table B-1 Proposed Augment Rev 1 (60 min) (60-min) (60 min)

(60 min) (60 min)

Command and Control Emergency Director 1 Notification / Communication Licensee/State/local/Federal 1 Radiological Accident Senior Manager I Site RP 1

Assessment Coordinator

- Dose Assessment Dose Assessor 1

- ln-Plant/Onsite Surveys RP Technician

- Chemistry I Chemistry Technician Radiochem istry

- Protective Actions RP Technician

- Offsite Surveys FMT Lead and Driver Plant System Engineering / Core/Thermal Hydraulics Technical Support Enaineer Electrical Engineer Mechanical Engineer Repair and Corrective Actions Radwaste Operator Mechanical Maintenance Electrical Maintenance l&C Techn ician OSC Supervisor RP Coordinator Mechanical Maintenance Coordinator Electrical Maintenance Coordinator l&C Coordinator Security Security Liaison Total Augmented ERO N/A N/A N/A 4 NIA 4

Beaver Valley Power Station (BVPS) 90 Minute Alert or Greater Augmented ERO Table Comparison Major Functional Area Position TitJe / Expertise 0654 Rev 1 BVPS BVPS Revised BVPS Table B-1 Issue 8 Rev 33 Table B-1 Proposed Augment Rev 1 (90 min) (90-min) (90 min)

(90 min) (90 min)

Command and Control Emergency Director Notification / Communication Licensee/State/local/Federal Radiological Accident Senior Manager / Site RP Assessment Coordinator

- Dose Assessment Dose Assessor

- ln-Plant/Onsite Surveys RP Technician 2 1

- Chemistry I Chemistry Technician Rad iochemistry

- Protective Actions RP Techn ician 1 2

- Offsite Surveys FMT Lead and Driver 2 2 Plant System Engineering / Core/Thermal Hydraulics Technical Support EnQ ineer Electrical Engineer Mechanical Eng ineer Repair and Corrective Actions Radwaste Operator Mechanical Maintenance Electrical Maintenance l&C Technician 1 1 OSC Supervisor RP Coordinator 1 Mechanical Maintenance Coordinator 1 1 Electrical Maintenance Coordinator 1 1 l&C Coordinator 1 1 Security Security Liaison Total Augmented ERO N/A NIA NIA 10 9 5