MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
SOUTH FLORIDA WATER MANAGEM ENT DISTRICT June 3, 2013 Ms . Barbara Linkiewicz Senior Director, Environmental Licensing & Permitting FPL & NextEra Energy Resources 700 Universe Blvd Juno Beach , FL 33408-0420
. . ./ .
Dear Ms. L 1 ~ew1cz :
&/hNTJ----
Subject:
Unit 3 and 4 Post Uprate Monitoring Thank you for meeting with Len Lindahl, Scott Burns and myself on Thursday, May 30 1h to discuss post-uprate monitoring revisions . Attached is a summary of the changes we discussed and agreed to . It will take staff a few weeks to make the written revisions to the original Monitoring Plan incorporating the changes outlined. Recognizing that FPL is commencing the June quarterly sampling run , this letter is being sent to approve the changes as described for the June sampling event and any subsequent sampling events that may take place prior to the completion of the revised Post Uprate Monitoring Plan . District staff in consultation with Florida Department of Environmental Protection and Miami-Dade County , will coordinate with FPL to produce the revised Post Uprate Monitoring Plan over the next several weeks.
Should you have any questions , please contact me at your convenience .
Director, Water Resources Division Attachment c: Phil Coram , FDEP Lee Hefty, M-D County RER Stacy Foster, FPL Lennart Lindahl , SFWMD Scott Burns , SFWMD 3301 Gu n Clu b Road, West Palm Beach, Florida 33406 * (561) 686-8800
- FL WATS 1-800-432-2045 Mailing Address: P.O. Box 24680, West Palm Beach, FL 33416-4680
June 3, 2013 Summary of Approved Post Uprate Revisions to the Turkey Point Monitoring Plan Isotope Sampling and Analysis: Further sampling and analysis of all isotopes except tritium is suspended until written notice to the contrary. The District will be conducting additional evaluation of existing data to determine whether non-tritium isotopes can be used to significantly distinguish CCS derived saline waters from Biscayne Bay derived saline waters. In the event that one or more isotopes, used in conjunction with tritium, are found to improve the reliability of the current chemical mixing models the District will share our analysis with FPL and discuss whether any isotope sampling should be re-instituted at a later date. Existing strontium isotope samples that have not yet to be analyzed are no longer required and may be destroyed.
Trace Metal Analysis: Further sampling and analysis of trace metals is suspended until written notice to the contrary. The District will be conducting additional evaluation of existing data to determine whether trace metals can be used to significantly distinguish CCS derived saline waters from Biscayne Bay derived saline waters. In the event that trace metals in whole or in part are found to improve the reliability of the current chemical mixing models the District will share our analysis with FPL and discuss whether any metals sampling should be re-instituted at a later date.
Cation and Anion Sampling Frequency: Cation and anion sampling frequency is reduced from quarterly to semi-annually with the exception of sodium and chloride ions which will continue to be collected quarterly.
Acoustic Doppler Flow Meters: Acoustic Doppler flow meter data collection from sites 1, 2, and 3 is no longer required.
TPSWCCS-SB: Water quality data collection from surface water site TPSWCCS-SB is no longer required pending review of more recent correlation data.
Ecological Monitoring Reduction: District to meet with FPL to identify specific reductions to the pre-uprate ecological monitoring and porewater sampling program. The revisions shall be finalized prior to the August 2013 ecological sampling run.
Interceptor Ditch Electronic Flow Measurements: FPL may implement an approved accurate alternative flow measurement method as a replacement for the currently deployed electronic flow meters.
Eliminate Automated Water Quality Data Collection at Three Bay and Two CCS stations: Water quality stations to be eliminated within the CCS include TPSWCCS 4B, SB and 6B (water level data to continue at 6T, SB pending data review). Biscayne Bay stations to be eliminated include lB and 2B.
Page 1of2
June 3, 2013 Faunal Monitoring in Biscayne Bay: Faunal monitoring in Biscayne Bay is no longer required Porewater Transect Sampling: District to meet with FPL to identify specific reductions to the porewater sampling transects. The revisions shall be finalized prior to the August 2013 ecological sampling run.
Eliminate Rainfall Stations: Data collection from the rainfall gauging stations is no longer required (rainfall collector stations for tritium evaluations remain unchanged).
Three Additional Monitor Well Sites: District and FPL to meet to identify candidate locations of the new well cluster sites.
Groundwater Upwelling Tests: District to meet with FPL to discuss methods and site locations. Based on results of upwelling testing the need for further porewater sampling will be assessed.
Synoptic CCS Flow Measurements: This item is deferred, to be considered during CCS freshening discussions.
Nutrient Sampling: One time nutrient sampling at monitoring sites TPGW-7, 8 and 9 (outside of CCS delineated plume) to determine if elevated nutrients are naturally occurring in groundwater in the region of organic soils.
Refinements to CCS Evaporation Estimates: This item is deferred, to be considered during CCS freshening discussions.
Page 2 of 2
SOUTH FLORIDA WATER MANAGEM ENT DISTRICT June 3, 2013 Ms . Barbara Linkiewicz Senior Director, Environmental Licensing & Permitting FPL & NextEra Energy Resources 700 Universe Blvd Juno Beach , FL 33408-0420
. . ./ .
Dear Ms. L 1 ~ew1cz :
&/hNTJ----
Subject:
Unit 3 and 4 Post Uprate Monitoring Thank you for meeting with Len Lindahl, Scott Burns and myself on Thursday, May 30 1h to discuss post-uprate monitoring revisions . Attached is a summary of the changes we discussed and agreed to . It will take staff a few weeks to make the written revisions to the original Monitoring Plan incorporating the changes outlined. Recognizing that FPL is commencing the June quarterly sampling run , this letter is being sent to approve the changes as described for the June sampling event and any subsequent sampling events that may take place prior to the completion of the revised Post Uprate Monitoring Plan . District staff in consultation with Florida Department of Environmental Protection and Miami-Dade County , will coordinate with FPL to produce the revised Post Uprate Monitoring Plan over the next several weeks.
Should you have any questions , please contact me at your convenience .
Director, Water Resources Division Attachment c: Phil Coram , FDEP Lee Hefty, M-D County RER Stacy Foster, FPL Lennart Lindahl , SFWMD Scott Burns , SFWMD 3301 Gu n Clu b Road, West Palm Beach, Florida 33406 * (561) 686-8800
- FL WATS 1-800-432-2045 Mailing Address: P.O. Box 24680, West Palm Beach, FL 33416-4680
June 3, 2013 Summary of Approved Post Uprate Revisions to the Turkey Point Monitoring Plan Isotope Sampling and Analysis: Further sampling and analysis of all isotopes except tritium is suspended until written notice to the contrary. The District will be conducting additional evaluation of existing data to determine whether non-tritium isotopes can be used to significantly distinguish CCS derived saline waters from Biscayne Bay derived saline waters. In the event that one or more isotopes, used in conjunction with tritium, are found to improve the reliability of the current chemical mixing models the District will share our analysis with FPL and discuss whether any isotope sampling should be re-instituted at a later date. Existing strontium isotope samples that have not yet to be analyzed are no longer required and may be destroyed.
Trace Metal Analysis: Further sampling and analysis of trace metals is suspended until written notice to the contrary. The District will be conducting additional evaluation of existing data to determine whether trace metals can be used to significantly distinguish CCS derived saline waters from Biscayne Bay derived saline waters. In the event that trace metals in whole or in part are found to improve the reliability of the current chemical mixing models the District will share our analysis with FPL and discuss whether any metals sampling should be re-instituted at a later date.
Cation and Anion Sampling Frequency: Cation and anion sampling frequency is reduced from quarterly to semi-annually with the exception of sodium and chloride ions which will continue to be collected quarterly.
Acoustic Doppler Flow Meters: Acoustic Doppler flow meter data collection from sites 1, 2, and 3 is no longer required.
TPSWCCS-SB: Water quality data collection from surface water site TPSWCCS-SB is no longer required pending review of more recent correlation data.
Ecological Monitoring Reduction: District to meet with FPL to identify specific reductions to the pre-uprate ecological monitoring and porewater sampling program. The revisions shall be finalized prior to the August 2013 ecological sampling run.
Interceptor Ditch Electronic Flow Measurements: FPL may implement an approved accurate alternative flow measurement method as a replacement for the currently deployed electronic flow meters.
Eliminate Automated Water Quality Data Collection at Three Bay and Two CCS stations: Water quality stations to be eliminated within the CCS include TPSWCCS 4B, SB and 6B (water level data to continue at 6T, SB pending data review). Biscayne Bay stations to be eliminated include lB and 2B.
Page 1of2
June 3, 2013 Faunal Monitoring in Biscayne Bay: Faunal monitoring in Biscayne Bay is no longer required Porewater Transect Sampling: District to meet with FPL to identify specific reductions to the porewater sampling transects. The revisions shall be finalized prior to the August 2013 ecological sampling run.
Eliminate Rainfall Stations: Data collection from the rainfall gauging stations is no longer required (rainfall collector stations for tritium evaluations remain unchanged).
Three Additional Monitor Well Sites: District and FPL to meet to identify candidate locations of the new well cluster sites.
Groundwater Upwelling Tests: District to meet with FPL to discuss methods and site locations. Based on results of upwelling testing the need for further porewater sampling will be assessed.
Synoptic CCS Flow Measurements: This item is deferred, to be considered during CCS freshening discussions.
Nutrient Sampling: One time nutrient sampling at monitoring sites TPGW-7, 8 and 9 (outside of CCS delineated plume) to determine if elevated nutrients are naturally occurring in groundwater in the region of organic soils.
Refinements to CCS Evaporation Estimates: This item is deferred, to be considered during CCS freshening discussions.