Annual Post-Uprate Monitoring Report for Uprate Project. Part 13 of 18
ML15364A431
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Ecology & Environment
To:
Office of New Reactors
Shared Package
ML15364A396 List:
References
L-2015-299, +reviewed
Download: ML15364A431 (2)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Biscayne Bay Monitoring Station

-0>

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station

~

Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013; 5*13: Sep 2013; D-13: Dec 2013; ~14 : Mar 2014.
3) NA: Not Available.

Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).

3-60 Section 3

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 4'

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013; S-13: Sep 2013; D-13: Dec 2013; M-14: Mar 2014.
3) NA: Not Available.

Section 3 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance

(µSiem).

3-61

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Biscayne Bay Monitoring Station

-0>

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station

~

Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013; 5*13: Sep 2013; D-13: Dec 2013; ~14 : Mar 2014.
3) NA: Not Available.

Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).

3-60 Section 3

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 4'

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013; S-13: Sep 2013; D-13: Dec 2013; M-14: Mar 2014.
3) NA: Not Available.

Section 3 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance

(µSiem).

3-61