Annual Post-Uprate Monitoring Report for Uprate Project. Part 12 of 18
ML15364A430
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Ecology & Environment
To:
Office of New Reactors
Shared Package
ML15364A396 List:
References
L-2015-299, +reviewed
Download: ML15364A430 (2)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Groundwater Monitoring Stat i on ' ~.

Canal Note.- 1) NH3.- Total A mmonia (mg/L as N); NOx.- Nitrate I Nitrite as N (m g/L); TN.- Total Nitrogen (m g/L); TP.- Total Phosphorus (mg/L).

2) Pre-Uprate.- Jun 2010 to Dec 2011.
3) J13_- Jun 2013; S13_- Sep 2013; M 14_- Mar 2014.

Section 3 7-2014 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.

3-58

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Biscayne Bay Monitoring Station 4>

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013 ; S-13: Sep 2013; D-13: Dec 2013; M-14: Mar 2014.
3) NA: Not Available.

Section 3 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).

3-59

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Groundwater Monitoring Stat i on ' ~.

Canal Note.- 1) NH3.- Total A mmonia (mg/L as N); NOx.- Nitrate I Nitrite as N (m g/L); TN.- Total Nitrogen (m g/L); TP.- Total Phosphorus (mg/L).

2) Pre-Uprate.- Jun 2010 to Dec 2011.
3) J13_- Jun 2013; S13_- Sep 2013; M 14_- Mar 2014.

Section 3 7-2014 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.

3-58

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Biscayne Bay Monitoring Station 4>

lntercepter Ditch Monitoring Station 0

Surface Water Canal Monitoring Station Cooling Canal Monitoring Station Note: 1) Pre-Uprate: Jun 2010 to Dec 2011.

2) J-13: Jun 2013 ; S-13: Sep 2013; D-13: Dec 2013; M-14: Mar 2014.
3) NA: Not Available.

Section 3 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).

3-59