L-2010-181, Withdrawal of Extended Power Uprate License Amendment Request
Letter Sequence Withdrawal | |
---|---|
TAC:ME5843, (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML1011601822010-04-16016 April 2010
[Table View]St. Lucie Unit 1 License Amendment Request for Extended Power Uprate Project stage: Request L-2010-181, Withdrawal of Extended Power Uprate License Amendment Request2010-08-13013 August 2010 Withdrawal of Extended Power Uprate License Amendment Request Project stage: Withdrawal ML1035604192010-11-22022 November 2010 St. Lucie, Unit 1 - Transmittal of Affidavits from Westinghouse, Areva and Caldon Ultrasonica Technology Center Re License Amendment Request for Extended Power Uprate Project stage: Request ML1107301162011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate Project stage: Request ML1107302822011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report Project stage: Supplement ML1113200042011-05-12012 May 2011 EPU - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML11153A0482011-05-27027 May 2011 St. Lucie Plant, Unit 1 - Information Regarding Areva LOCA and Non-LOCA Methodologies Provided in Support of the License Amendment Request for Extended Power Uprate Project stage: Request ML11173A1042011-06-23023 June 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-273, Information Regarding Anticipated Transients Without Scram (ATWS) Provided in Support of the Extended Power Uprate License Amendment Request2011-07-22022 July 2011 Information Regarding Anticipated Transients Without Scram (ATWS) Provided in Support of the Extended Power Uprate License Amendment Request Project stage: Request L-2011-314, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-08-12012 August 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request ML11208B6442011-08-26026 August 2011 Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Information Project stage: Other NRC-2011-0190, St. Lucie Nuclear Plant, Units 1 and 2 - Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI2011-08-26026 August 2011 St. Lucie Nuclear Plant, Units 1 and 2 - Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Info Project stage: Approval ML11208B6422011-09-0101 September 2011 Transmittal Letter - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Information Project stage: Other L-2011-360, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-0202 September 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request ML1123602302011-09-0202 September 2011 Request for Concurrence on List of Species with Essential Fish Habitat in the Vicinity of the St. Lucie Plant, Units 1 and 2 Project stage: Other L-2011-389, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-22022 September 2011 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-383, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-22022 September 2011 Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-422, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information and Supplemental Information Regarding Extended Power Uprate License Amendment Request2011-10-10010 October 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information and Supplemental Information Regarding Extended Power Uprate License Amendment Request Project stage: Supplement L-2011-448, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-10-31031 October 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-466, Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality2011-11-0404 November 2011 Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality Project stage: Request L-2011-467, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-11-14014 November 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-493, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-11-23023 November 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-524, Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-12-27027 December 2011 Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request ML11332A0212011-12-28028 December 2011 Federal Register Notice - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request ML11332A0202011-12-28028 December 2011 Transmittal Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other L-2011-533, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-12-29029 December 2011 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-565, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-532, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-566, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-441, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-18018 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-534, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-18018 January 2012 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-012, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-21021 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-009, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-21021 January 2012 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-043, Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate2012-01-30030 January 2012 Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate Project stage: Draft Other ML12044A1272012-02-13013 February 2012 Comment (2) from Edward W. Johnson Opposing Ncr Permit Approval for St. Lucie 1 & 2 Project stage: Request L-2012-059, Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-02-29029 February 2012 Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-075, Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0606 March 2012 Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-100, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0606 March 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-094, Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0808 March 2012 Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-106, Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request2012-03-15015 March 2012 Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request Project stage: Request L-2012-114, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-16016 March 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-113, Response to Request for Additional Information Identified During Audit of the Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request2012-03-17017 March 2012 Response to Request for Additional Information Identified During Audit of the Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request Project stage: Response to RAI L-2012-116, Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment2012-03-25025 March 2012 Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Project stage: Response to RAI L-2012-141, Response to NRC Steam Generator Tube Integrity and Chemical Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-31031 March 2012 Response to NRC Steam Generator Tube Integrity and Chemical Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-121, Information Regarding Fuel Thermal Conductivity Degradation Provided in Support of the Extended Power Uprate License Amendment Request2012-03-31031 March 2012 Information Regarding Fuel Thermal Conductivity Degradation Provided in Support of the Extended Power Uprate License Amendment Request Project stage: Request L-2012-122, Response to NRC Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-04-0505 April 2012 Response to NRC Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-131, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-04-0505 April 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-150, Response to Request for Additional Information Identified During Audit of the Non-Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request2012-04-0606 April 2012 Response to Request for Additional Information Identified During Audit of the Non-Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request Project stage: Response to RAI L-2012-157, Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Request2012-04-10010 April 2012 Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Request Project stage: Response to RAI L-2012-176, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-04-19019 April 2012 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request 2011-09-01 |
ML102290018 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 08/13/2010 |
From: | Richard Anderson Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-2010-181 | |
Download: ML102290018 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Letter type:L
MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024
[Table view]Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-169, Correction to the 2022 Annual Radioactive Effluent Release Report2023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-158, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule 2024-09-09 |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 13, 2010 FIPL L-2010-181 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit No. I Docket No. 50-335 Renewed License No. DPR-67 Withdrawal of Extended Power Uprate License Amendment Request On April 16, 2010, Florida Power and Light Company (FPL) submitted the St. Lucie Unit 1 Extended Power Uprate (EPU) License Amendment Request (LAR) via FPL letter L-2010-078 for a proposed license amendment that would increase the licensed core power level from 2700 megawatts thermal (MWt) to 3020 MWt. On July 23, 2010, the Nuclear Regulatory Commission (NRC) formally requested FPL to provide supplemental information needed for the acceptance review of the LAR. FPL provided responses to the NRC's request for supplemental information via letter L-2010-144 dated July 23, 2010 and letter L-2010-162 dated July 30, 2010.
Based on a conference call with the NRC staff on August 10, 2010, FPL has decided to withdraw the St. Lucie Unit 1 EPU LAR submitted on April 16, 2010. FPL is evaluating the staff's positions and may resubmit a revised application at a future time.
Should you have any questions regarding the information provided in this transmittal please contact Mr. Chris Wasik at 772-467-7138.
Very truly yours, Richard Anderson Site Vice President St. Lucie Plant cc: Mr. William Passetti, Florida Department of Health Pcod an FPL Group company