- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML1011601822010-04-16016 April 2010 St. Lucie Unit 1 License Amendment Request for Extended Power Uprate Project stage: Request L-2010-181, Withdrawal of Extended Power Uprate License Amendment Request2010-08-13013 August 2010 Withdrawal of Extended Power Uprate License Amendment Request Project stage: Withdrawal ML1035604192010-11-22022 November 2010 St. Lucie, Unit 1 - Transmittal of Affidavits from Westinghouse, Areva and Caldon Ultrasonica Technology Center Re License Amendment Request for Extended Power Uprate Project stage: Request ML1107302992011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Licensing Report Project stage: Request ML1107302822011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report Project stage: Supplement ML1107301162011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate Project stage: Request ML1113200042011-05-12012 May 2011 EPU - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML11153A0482011-05-27027 May 2011 St. Lucie Plant, Unit 1 - Information Regarding Areva LOCA and Non-LOCA Methodologies Provided in Support of the License Amendment Request for Extended Power Uprate Project stage: Request ML11173A1042011-06-23023 June 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-273, Information Regarding Anticipated Transients Without Scram (ATWS) Provided in Support of the Extended Power Uprate License Amendment Request2011-07-22022 July 2011 Information Regarding Anticipated Transients Without Scram (ATWS) Provided in Support of the Extended Power Uprate License Amendment Request Project stage: Request L-2011-314, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-08-12012 August 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request NRC-2011-0190, St. Lucie Nuclear Plant, Units 1 and 2 - Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI2011-08-26026 August 2011 St. Lucie Nuclear Plant, Units 1 and 2 - Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Info Project stage: Approval ML11208B6442011-08-26026 August 2011 Federal Register Notice - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Information Project stage: Other ML11208B6422011-09-0101 September 2011 Transmittal Letter - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI Information Project stage: Other ML1123602302011-09-0202 September 2011 Request for Concurrence on List of Species with Essential Fish Habitat in the Vicinity of the St. Lucie Plant, Units 1 and 2 Project stage: Other L-2011-360, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-0202 September 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-383, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-22022 September 2011 Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-389, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-22022 September 2011 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-404, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-10-0505 October 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-422, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information and Supplemental Information Regarding Extended Power Uprate License Amendment Request2011-10-10010 October 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information and Supplemental Information Regarding Extended Power Uprate License Amendment Request Project stage: Supplement L-2011-448, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-10-31031 October 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-466, Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality2011-11-0404 November 2011 Revision to Extended Power Uprate License Amendment Request Proposed Technical Specification 5.6, Design Features - Fuel Storage - Criticality Project stage: Request L-2011-467, Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-11-14014 November 2011 Response to NRC Accident Dose Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-493, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-11-23023 November 2011 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-524, Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-12-27027 December 2011 Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request ML11332A0212011-12-28028 December 2011 Federal Register Notice - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request ML11332A0202011-12-28028 December 2011 Transmittal Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other L-2011-533, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-12-29029 December 2011 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-566, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-532, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-565, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-534, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-18018 January 2012 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2011-441, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-18018 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-012, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-21021 January 2012 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-009, Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-21021 January 2012 Response to NRC Reactor System Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-043, Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate2012-01-30030 January 2012 Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate Project stage: Draft Other ML12044A1272012-02-13013 February 2012 Comment (2) from Edward W. Johnson Opposing Ncr Permit Approval for St. Lucie 1 & 2 Project stage: Request L-2012-059, Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-02-29029 February 2012 Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-075, Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0606 March 2012 Response to NRC Mechanical and Civil Engineering Branch (Emcb) Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-100, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0606 March 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-094, Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-0808 March 2012 Response to NRC Steam Generator Tube Integrity and Chemistry Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-106, Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request2012-03-15015 March 2012 Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request Project stage: Request L-2012-114, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-16016 March 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-113, Response to Request for Additional Information Identified During Audit of the Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request2012-03-17017 March 2012 Response to Request for Additional Information Identified During Audit of the Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request Project stage: Response to RAI L-2012-116, Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment2012-03-25025 March 2012 Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Project stage: Response to RAI L-2012-141, Response to NRC Steam Generator Tube Integrity and Chemical Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-03-31031 March 2012 Response to NRC Steam Generator Tube Integrity and Chemical Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-131, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-04-0505 April 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-122, Response to NRC Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-04-0505 April 2012 Response to NRC Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-150, Response to Request for Additional Information Identified During Audit of the Non-Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request2012-04-0606 April 2012 Response to Request for Additional Information Identified During Audit of the Non-Loss of Coolant Accident Safety Analyses Calculations for the Extended Power Uprate License Amendment Request Project stage: Response to RAI L-2012-157, Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Request2012-04-10010 April 2012 Response to Request for Additional Information Identified During Audit of the Reactor Systems Branch (Srxb) Fluid System Analyses for the Extended Power Uprate License Amendment Request Project stage: Response to RAI 2011-08-26
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 F:PL October 10, 2011 L-2011-422 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 2 Docket No. 50-389 Renewed Facility Operating License No. NPF-16 Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information and Supplemental Information Regarding Extended Power Uprate License Amendment Request
References:
(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2011-021),
"License Amendment Request for Extended Power Uprate," February 25, 2011, Accession No. ML110730116.
(2) Email from T. Orf (NRC) to C. Wasik (FPL), "St. Lucie 2 EPU - draft RAIs Reactor Systems Branch and Nuclear Performance Branch (SRXB and SNPB),"
September 6, 2011.
By letter L-2011-021 dated February 25, 2011 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. NPF- 16 and revise the St. Lucie Unit 2 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an extended power uprate (EPU).
By email from the NRC Project Manager dated September 6, 2011 [Reference 2],
additional information related to reactor systems and nuclear performance was requested by the NRC staff inthe Reactor Systems Branch (SRXB) and the Nuclear Performance Branch (SNPB) to support their review of the EPU license amendment request (LAR).
an FPL Group company (Z--
St. Lucie Unit 2 L-2011-422 Docket No. 50-389 Page 2 of 2 The request for additional information (RAI) included two questions (TS-5 and TS-6) related to relocating the minimum reactor coolant flow parameter associated with the departure from nucleate boiling (DNB) to the Core Operating Limits Report (COLR).
The attachments to this letter provide the FPL responses to the RAI questions TS-5 and TS-6 by revising the proposed EPU LAR TS changes. Attachment 1 to this submittal provides the description and basis for the revision to the proposed TS changes. provides the marked-up and clean pages for the proposed TS changes.
This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2011-021 [Reference 1].
This submittal contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the designated State of Florida official.
Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-429-7138.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on /" O-_---o 0 I Very truly yours, Site Vice President St. Lucie Plant Attachments (2) cc: Mr. William Passetti, Florida Department of Health
St. Lucie Unit 2 L-2011-422 Docket No. 50-389 Attachment 1 Page 1 of 3 Attachment 1 Technical Specifications Table 2.2-1 and Specification 3/4.2.5 Revision To Proposed Change Submitted By FPL Letter L-2011-021 Regarding Extended Power Uprate License Amendment Request For St. Lucie Unit 2 By letter L-2011-021 dated February 25, 2011, Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lucie Unit 2 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an extended power uprate (EPU). Included in the EPU LAR were changes to TS Table 2.2-1 Reactor Protective Instrumentation Trip Setpoint Limits and TS 3.2.5, Power Distribution Limits
- DNB Parameters. FPL is modifying these proposed TS changes as described below:
Description of the Change EPU LAR Attachment 1, Section 3.1, Renewed Facility Operating License and Technical Specification Changes proposed the following changes to Item 7 - TS 2.2, LIMITING SAFETY SYSTEM SETTINGS - TABLE 2.2 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS and Item 12 - TS 3.2.5, POWER DISTRIBUTION LIMITS - DNB PARAMETERS:
" Item 7. TS 2.2, LIMITING SAFETY SYSTEM SETTINGS - TABLE 2.2 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS - The footnote was proposed to be changed from "* Design reactor coolant flow with four pumps operating is the minimum RCS flow specified in the COLR Table 3.2-2" to "For minimum reactor coolant flow with four pumps operating, refer to COLR Table 3.2-2."
" Item 12. TS 3/4.2.5, POWER DISTRIBUTION LIMITS - DNB PARAMETERS - The Limiting Condition for Operation (LCO) was proposed to be changed from "The following DNB-related parameters shall be maintained within the limits shown on Table 3.2-2" to "The following DNB-related parameters shall be maintained within the limits shown on Table 3.2-2 of the COLR."
By email from the NRC Project Manager dated September 6, 2011, additional information was requested by the NRC staff in the Reactor Systems Branch (SRXB) and Nuclear Performance Branch (SNPB) to support their review of the St. Lucie Unit 2 EPU LAR. The request for additional information (RAI) included two questions related to the relocation to the core operating limits report (COLR) of the departure from nucleate boiling (DNB) parameters. The questions stated that based on NRC staff position delineated in T. H. Essig (NRC) letter to A.
Drake (Westinghouse Owners Group), Acceptance for Referencing of Licensing Topical Report WCAP-14483, "Generic Methodology for Expanded Core Operating Limits Report" TAC NO.
M94338, January 19, 1999 (ML020430092), the minimum reactor coolant flow parameter could not be relocated from the TS.
St. Lucie Unit 2 L-2011-422 Docket No. 50-389 Attachment 1 Page 2 of 3 As such, FPL is modifying the proposed TS as follows:
- TS 2.2, LIMITING SAFETY SYSTEM SETTINGS - TABLE 2.2 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS - The footnote is revised to state:
- TS 3/4.2.5, POWER DISTRIBUTION LIMITS - DNB PARAMETERS - The LCO is revised to state:
3.2.5 The following DNB related parameters shall be maintained within the limits:
- a. Cold Leg Temperature as shown on Table 3.2-2 of the COLR,
- b. Pressurizer Pressure* as shown on Table 3.2-2 of the COLR,
- c. Reactor Coolant System Total Flow Rate - greater than or equal to 375,000 gpm, and
- d. AXIAL SHAPE INDEX as shown on Figure 3.2-4 of the COLR.
Note that the marked up TS pages in Attachment 2 are markups of the pages submitted in the EPU LAR.
The EPU LAR contained marked up and clean pages for the TS Bases and the COLR for information only. The revised TS Bases and COLR pages are not included in this submittal.
Basis for the change:
The limits on the DNB related parameters ensure that each of the parameters is maintained within the normal steady-state envelope of operation assumed in the transient and accident analyses. The limits are consistent with the safety analyses assumptions and have been analytically demonstrated adequate to maintain a minimum departure from nucleate boiling ratio (DNBR) of greater than or equal to the DNBR limit for each DNB limited transient analyzed.
The nuclear steam supply system (NSSS) design parameters provide the reactor coolant system and secondary side system conditions (thermal power, temperatures, and pressures) that are used as the basis for the design transients, systems, structures, components, accidents, and fuel analyses and evaluation. These variables are validated every refueling cycle and are contained in the COLR to provide operating and analysis flexibility. The minimum reactor coolant flow parameter is maintained in the TS, but is relocated to the LCO from TS Table 3.2-2, DNB MARGIN LIMITS, which is being deleted.
The DNB margin limit for cold leg temperature in the COLR is changed from < 549 0 F to < 551°F and reactor coolant flow rate in the TS is changed from > 335,000 gpm to > 375,000 gpm. The reactor coolant flow limit is deleted from the COLR Table 3.2-2.
The DNB parameters are determined for each refueling cycle core in the reload safety analysis.
This change ensures that the DNB parameters are consistent with the values determined in the reload safety analysis.
Maintaining the reactor coolant flow limit in the TS is consistent with the NRC staff position stated in NRC letter from T. H. Essig, dated January 19, 1999.
St. Lucie Unit 2 L-2011-422 Docket No. 50-389 Attachment 1 Page 3 of 3 The revision to the footnote on TS Table 2.2-1, Reactor Protective Instrumentation Trip Setpoint Limits, is a conforming change to ensure that the value for the reactor coolant flow limit is identified correctly.
No Significant Hazards Consideration This change eliminates the relocation of the reactor coolant flow limit from the TS to the COLR.
The reactor coolant flow limit is unchanged from the value in the EPU LAR. The limit will be maintained in TS LCO 3.5.2. In addition, the footnote on TS Table 2.2-1 is being revised to reference the TS and not the COLR for the reactor coolant flow requirement. As such, the conclusions of EPU LAR Attachment 1 Section 5.2, No Significant Hazards Consideration, Item B. Reactor Coolant Flow Rate and Departure From Nucleate Boiling (DNB) Parameters remain valid. Accordingly, the proposed change 1) does not involve a significant increase in the probability or consequences of an accident previously evaluated, 2) does not create the possibility of a new or different kind of accident from any previously evaluated, and 3) does not result in a significant reduction in a margin of safety.
Environmental Evaluation This change does not change any of the technical requirements for the DNB parameters. The change only maintains the reactor coolant flow limit in the TS, as opposed to relocating the limit to the COLR. The environmental considerations evaluation contained in the EPU LAR remain valid. Accordingly, the proposed license amendment is eligible for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 50.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed license amendment.
St. Lucie Unit 2 L-2011-422 Docket No. 50-389 Attachment 2 ATTACHMENT 2 Supplemental Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request St. Lucie Unit 2 Marked-Up and Clean Technical Specification Pages This coversheet plus four pages
TABLE 2.2-1 (Continued)
REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES
- 9. Local Power Density - High(5) Trip setpoint adjusted to Trip setpoint adjusted to Operating not exceed the limit lines not exceed the limit lines of Figures 2.2-1 and 2.2-2 of Figures 2.2-1 and 2.2-2.
- 10. Loss of Component Cooling Water > 636 gpm** > 636 gpm to Reactor Coolant Pumps - Low
- 11. Reactor Protection System Logic Not Applicable Not Applicable
- 12. Reactor Trip Breakers Not Applicable minimum Not Applicable
- 13. Rate of Change of Power - High(4) <2.49 decades per_ ue .49 decades per minute 1
- 14. Reactor Coolant Flow - Low( ) 95.4% of desi Reactor > 94.9% of Reactor Coolant flow with four Coolant flow with four pumps operating* pumps operating*
- 15. Loss of Load (Turbine) > 800 psig > 800 psig Hydraulic Fluid Pressure - Low(5)
[Tec hnical Specification LCO 3.2.5.
- Deig reactor coolant flow with four pumps operating ie-th- minimum RCS flew lpc*ificd in th CQLR1
.. a bI 3.2 2.
- 10-minute time delay after relay actuation.
ST. LUCIE - UNIT 2 2-5 Amendment No. 8, 6&,4,34,4-38
POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB-related parameters shall be maintained within the limits shewnfl -
- a. Cold Leg Temperature
- b. Pressurizer Pressure-.
- c. Reactor Coolant System Total Flow Rate - greater than or equal to
- d. AXIAL SHAPE INDEX APPLICABILITY: MODE 1. as shown on Figure 3.2-4 of the COLR.
ACTION:
With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to < 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANC EQUIREMENTS 4.2.5.1 Each of the parameters of Table 3.2 2- shall be verified to be within their limits by instrument readout at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.2.5.2 The Reactor Coolant System total flow rate shall be determined to be within its limit by mea xmeJ*
- at least once per 18 months.
Not required to be performed until THERMAL POWER is > 0 of RATED THERMAL POWER.
90%
ST. LUCIE - UNIT 2 3/4 2-14 Amendment No. 9-9,445
TABLE 2.2-1 (Continued)
REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES
- 9. Local Power Density - High(5) Trip setpoint adjusted to Trip setpoint adjusted to Operating not exceed the limit lines not exceed the limit lines of Figures 2.2-1 and 2.2-2 of Figures 2.2-1 and 2.2-2.
- 10. Loss of Component Cooling Water > 636 gpm** > 636 gpm to Reactor Coolant Pumps - Low
- 11. Reactor Protection System Logic Not Applicable Not Applicable
- 12. Reactor Trip Breakers Not Applicable Not Applicable
- 13. Rate of Change of Power - High(4) < 2.49 decades per minute < 2.49 decades per minute 1
- 14. Reactor Coolant Flow - Low( ) > 95.4% of minimum Reactor > 94.9% of minimum Reactor Coolant flow with four Coolant flow with four pumps operating* pumps operating*
- 15. Loss of Load (Turbine) > 800 psig > 800 psig Hydraulic Fluid Pressure - Low(5)
- 10-minute time delay after relay actuation.
ST. LUCIE - UNIT 2 2-5 Amendment No. 8, 60, 4-3, 438
POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB-related parameters shall be maintained within the limits:
- a. Cold Leg Temperature as shown on Table 3.2-2 of the COLR,
- b. Pressurizer Pressure* as shown on Table 3.2-2 of the COLR,
- c. Reactor Coolant System Total Flow Rate - greater than or equal to 375,000 gpm, and
- d. AXIAL SHAPE INDEX as shown on Figure 3.2-4 of the COLR.
APPLICABILITY: MODE 1.
ACTION:
With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to < 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.5.1 Each of the DNB-related parameters shall be verified to be within their limits by instrument readout at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.2.5.2 The Reactor Coolant System total flow rate shall be determined to be within its limit by measurement** at least once per 18 months.
Limit not applicable during either a THERMAL POWER ramp increase in excess of 5% per minute of RATED THERMAL POWER or a THERMAL POWER step increase of greater than 10% of RATED THERMAL POWER.
Not required to be performed until THERMAL POWER is > 90% of RATED THERMAL POWER.
ST. LUCIE - UNIT 2 3/4 2-14 Amendment No. 8-9, 44