Category:Letter type:L
MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-169, Correction to the 2022 Annual Radioactive Effluent Release Report2023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-158, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update 2024-09-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies 2024-09-27
[Table view] Category:Technical Specifications
MONTHYEARML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1132023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 L-2022-014, Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements2022-01-13013 January 2022 Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements ML22013A6602021-11-11011 November 2021 Amendment 31 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21265A2952021-09-15015 September 2021 Enclosure 2 - Volume 10 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 0 ML21265A2962021-09-15015 September 2021 Enclosure 2 - Volume 11 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.6 Containment Systems, Revision 0 ML21265A2902021-09-15015 September 2021 Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 ML21265A2912021-09-15015 September 2021 Enclosure 2 - Volume 6 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.1 Reactivity Control Systems, Revision 0 ML21265A2932021-09-15015 September 2021 Enclosure 2 - Volume 8 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.3 Instrumentation, Revision 0 ML21265A2942021-09-15015 September 2021 Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 L-2021-159, Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal2021-09-15015 September 2021 Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal ML21265A3012021-09-15015 September 2021 Enclosure 2 - Volume 16 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 5.0 Administrative Controls, Revision 0 ML21265A2972021-09-15015 September 2021 Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 ML21265A2982021-09-15015 September 2021 Enclosure 2 - Volume 13 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.8 Electrical Systems, Revision 0 ML21265A3002021-09-15015 September 2021 Enclosure 2 - Volume 15 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 4.0 Design Features, Revision 0 ML21265A2992021-09-15015 September 2021 Enclosure 2 - Volume 14 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.9 Refueling Operations, Revision 0 ML21265A2922021-09-15015 September 2021 Enclosure 2 - Volume 7 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.2 Power Distribution Limits, Revision 0 ML21265A2892021-09-15015 September 2021 Enclosure 2 - Volume 4 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits, Revision 0 ML21265A2882021-09-15015 September 2021 Enclosure 2 - Volume 3 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 1.0 Use and Application, Revision 0 ML21265A2862021-09-15015 September 2021 Enclosure 2 - Volume 1 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion Application of Selection Criteria to the St. Lucie Plant Units 1 and 2 Technical Specifications, Revision 0 ML20141L6642020-05-0404 May 2020 Amendment 30 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b ML16341C1752016-12-19019 December 2016 Correction to Amendment No. 237 Regarding the Update to Appendix B to the Renewed Facility Operating Licenses to Incorporate the 2016 Biological Opinion ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) ML16034A0802016-03-0707 March 2016 Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2015-303, Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps2015-12-15015 December 2015 Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML15280A4222015-10-19019 October 2015 Unit 2 Technical Specification Pages 6-15b ML15191A4032015-08-31031 August 2015 Issuance of Amendments to Adopt TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiative 6B and 6C 2023-10-02
[Table view] |
Text
0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 May 21, 2009 IFPL L-2009-127 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Unit 2 Docket No. 50-3 89 Application for Technical Specification Modification Regarding Control Rod Assembly Drop Time Pursuant to 10 CFR 50.90 and 50.91, Florida Power and Light Company (FPL) requests to amend Facility Operating License NPF-16 for St. Lucie Unit 2.
The amendment would revise the Technical Specification (TS) 3.1.3.4, related to requirements for Control Element Assembly (CEA) drop time. This TS change increases the available margin for CEA drop time testing.
Enclosure 1 provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Enclosure 2 provides the existing TS pages marked up to show the proposed change. Enclosure 3 provides revised (clean) TS pages.
Enclosure 4 provides a summary of the regulatory commitments made in this submittal.
FPL requests approval of the proposed amendment by May 31, 2010, with the amendment being implemented within 60 days of NRC approval.
The license amendments proposed by FPL have been reviewed by the St. Lucie Plant Onsite Review Group. In accordance with 10 CFR 50.91(b)(1), a copy of these proposed license amendments is being forwarded to the State Designee for the State of Florida.
Please contact Mr. Ken Frehafer at (772) 467-7748 if there are any questions about this submittal.
ý m)(
Kft'K an FPL Group company
L-2009-127 Page 2 1 declare under penalty of perjury that the foregoing is true and correct.
Executed on i'l4' ,Z/ ,2009.
Sincerely, Gordon L. Johnston Site Vice-President St. Lucie Plant
Enclosures:
- 1. Description and Assessment
- 2. Proposed Technical Specification Changes
- 3. Revised Technical Specification Pages
- 4. Regulatory Commitments
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure I Page 1 of 6 Description and Assessment
1.0 DESCRIPTION
This license amendment request (LAR) modifies the required CEA drop time in Technical Specification (TS) 3.1.3.4 from the current value of 3.1 seconds to a new value of 3.2 seconds for 90% insertion, to accommodate for observed increased CEA drop times.
2.0 ASSESSMENT Control Element Assembly (CEA) drop time is an input to the UFSAR described safety analysis to mitigate the consequences of certain events, such as the loss of flow, locked rotor, full power steam line break, etc. It is used in a combination of CEA reactivity vs. CEA position to determine the reactivity insertion subsequent to the reactor trip. This trip reactivity used in the safety analysis, in general has significant margin to the actual cycle specific reactivity insertion determined for any cycle. For St. Lucie Unit 2, it is verified that the Cycle 18 trip reactivity determined from the Cycle 18 core design, after accounting for the 10% rod worth uncertainty, continues to meet the safety analysis trip reactivity even with the proposed increase in the CEA drop time by 0.1 seconds. Thus, the delay in the CEA insertion due to the proposed increase in the CEA drop time has no adverse impact on the UFSAR described accident analysis. There are no other adverse effects on any reload analysis and no impact on plant operations, other than the increase in the drop time as proposed.
Provided below is a summary of the evaluation performed for the proposed CEA drop time increase:
Fuel Rod & Thermal-Hydraulic Design The change in CEA drop time does not impact the power shapes (assumed for Relaxed Axial Offset Control or the safety analyses) or statepoints, hence there is no impact on the thermal hydraulic or fuel rod design analysis done for Cycle 18.
Mechanical Design There is no impact on the mechanical design due to the slower CEA drop time. The slightly slower drop would produce a smaller impact on the fuel assembly and lower stresses on the CEA. Since there is no adverse impact, current mechanical design analyses remain applicable.
LOCA Analysis For LOCA, the current limits that support Cycle 18 are not impacted by the increase in CEA drop time. Specifically, the normalized scram reactivity worth vs. CEA % insertion remains applicable for the proposed CEA drop time with no change. A detailed evaluation with respect to the LOCA analyses that support Cycle 18 has been performed, which shows additional margin
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 1 Page 2 of 6 beyond the 0.1 second delay offset (shift) to the current CEA rod drop curve. Therefore, the results of the existing LOCA safety analyses are not impacted and remain bounding.
Non-LOCA Transients The Non-LOCA Safety Analyses do not directly utilize the CEA drop time. Instead a combination of the CEA insertion fraction as a function of time and the CEA insertion fraction as a function of normalized reactivity insertion is modeled. An increase in the CEA drop time will decrease the reactivity inserted for a given time point. However, it is verified that offsetting the rod positions by 0.1 seconds (slower) at all positions, does not preclude meeting the trip reactivity limits used in the non-LOCA analyses. This statement means that the required trip reactivity normalized worth (%Ak) at a given CEA insertion fraction has been confirmed to be available at a lesser insertion fraction corresponding to CEA insertion being slower by 0.1 seconds. This relationship is maintained at all CEA insertion fractions. This ensures that the trip reactivity normalized worth (%Ak) is no more adverse than the current values modeled in the Non-LOCA Safety Analyses. Thus, the Non-LOCA transient analyses remains valid.
Operational Considerations The proposed change to the CEA rod drop time has no impact on the plant operation other than the time requirement change for the rod drop time testing. Since the slower CEA rod drop time does not require re-performing any of the safety analyses, there is no impact on the overpressure protection considerations.
Conclusion The reactivity insertion rate continues to be bounded by the curve used for the various safety analyses, despite a 0.1 second delay offset (shift) to the current CEA rod drop curve. Thus, the reactivity insertion for a given revised time point is at least equivalent to the reactivity insertion values utilized in safety analyses. Since the same reactivity insertion is available with the revised CEA drop time curve, the results of the existing safety analyses are not impacted and remain bounding. Since the safety analysis remains bounding, the other areas such as thermal hydraulics, fuel rod design and operations analysis are not impacted. There is no adverse impact on the impact loads on the CEA due to the slower drop times. Therefore, the 0.1 second increase in drop time is acceptable for Cycle 18.
The reactivity insertion with the increased CEA drop time will be verified every cycle as part of
'the cycle specific reload analysis to comply with the proposed CEA drop time increase.
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 1 Page 3 of 6
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination Florida Power & Light is requesting adoption of a change to the St. Lucie Unit 2 specific TSs, related to the CEA drop time.
The standards used to arrive at a determination that a request for amendment involves a No Significant Hazards Consideration are included in the Commission's regulation, 10 CFR 50.92, which states that No Significant Hazards Considerations are involved if the operation of the facility in accordance with the amendment would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; nor (3) Involve a significant reduction in a margin of safety.
As required by 10 CFR 50.91(a), an analysis of the issue of No Significant Hazards Consideration was prepared by Florida Power & Light for this change.
I. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
The proposed change increases the required CEA drop time. This new CEA drop time requirement must be verified prior to Modes 1 or 2 of plant operations. The probability of an accident previously evaluated remains unchanged since the CEAs drop into the core as a result of a core anomaly or undesired condition, and the fact that the CEA drop time was increased does not in itself initiate an accident. Likewise, the consequences of an accident previously evaluated remain unchanged since for both LOCA and non-LOCA analyses, it has been verified that the proposed slower reactivity insertion rate at all rod positions, will not preclude meeting the trip reactivity limits used in the analyses.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed change does not involve a physical alteration of the plant (no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. The proposed change will not introduce new failure modes or effects and will not, in the absence of other unrelated failures, lead to an accident whose consequences exceed the consequences of accidents previously analyzed.
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure I Page 4 of 6 Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
The increase in CEA drop time as proposed in this TS change has been determined to have no adverse impact on the St. Lucie Unit 2 safety analysis described in the UFSAR, and thus, does not have any effect on the existing margins of safety for the fuel, the fuel cladding, the reactor vessel, or the containment building. The change in CEA drop time does not impact the power shapes (assumed for Relaxed Axial Offset Control or the safety analyses) or statepoints, hence there is no impact on the thermal hydraulic or fuel rod design analysis. There is no impact on the mechanical design. The slightly slower drop would produce a smaller impact on the fuel assembly and lower stresses on the CEA. Since there is no adverse impact, current mechanical design analyses remain applicable.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on this analysis, it was determined that the proposed amendment does not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any previously evaluated; nor (3) involve a significant reduction in a margin of safety. Therefore, the amendment does not involve a significant hazards consideration.
3.2 Applicable Regulatory Requirements/Criteria The regulations (10 CFR Part 50) do not deal explicitly with startup testing. However, the CEA drop time (a quantity measured and validated in the startup tests) is in the TSs, and therefore, is subject to regulatory oversight.
According to the Unit 2 UFSAR, the control element assemblies were designed to comply with General Design Criteria (GDC) related to equipment safety functions (GDCs 1, 2, 14, 29),
suppression of reactor power oscillations (GDC 12), instrumentation and control equipment (GDC 13), protection systems (GDCs 20, 23, 25), and reactivity control systems (GDCs 10, 26, 27, 28). As discussed below, the change provided in this TS amendment does not affect the conclusions provided in the UFSAR, and the CEAs and related systems continue to comply with the regulation.
GDCs 1, 2, 14, 29 - Equipment safety functions: These GDCs, as they relate to the CEA system, require that the CEAs be designed to quality standards commensurate with the importance of the safety functions in the event of anticipated operational occurrences (AOOs); be designed to withstand the effects of an earthquake without loss of capability to perform its safety functions;
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure I Page 5 of 6 the reactor coolant pressure boundary (RCPB) portion of the CEA system shall be designed, constructed, and tested for the extremely low probability of leakage or gross rupture; and the CEAs shall be designed to assure an extremely high probability of accomplishing their safety functions, As the only parameter that is being changed in this LAR is the maximum allowable CEA drop time from 3.1 to 3.2 seconds (to 90% insertion), none of the above requirements are being affected.
GDC 12 - Reactor power oscillations: This GDC requires that the reactor core and associated coolant, control, and protection systems shall be designed to assure that power oscillations which can result in conditions exceeding specified acceptable fuel design limits are not possible or can be reliably and readily detected and suppressed. The CEAs will continue to provide fundamental mode stability even after this TS change. Likewise, there is no change to the ability of the CEAs to suppress the axial mode oscillations.
GDC 13 - Instrumentation and control equipment: This GDC requires that instrumentation be provided to monitor variables and systems over their anticipated ranges for normal operation, for AOOs, and for accident conditions to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the RCPB, and the containment and its associated systems. According to the UFSAR, manual and automatic control of reactor power by means of CEAs is provided (among other systems) to monitor and maintain control over the fission process during both transient and steady state periods over the lifetime of the core. The manual and automatic control by means of CEAs is not affected by the increase in maximum allowable CEA drop time from 3.1 to 3.2 seconds (to 90% insertion).
GDCs 20, 23, 25 - Protection systems: These GDCs require that the plant protection system be designed: (1) to initiate automatically the operation of appropriate systems including the reactivity control systems, to assure that specified acceptable fuel design limits are not exceeded as a result of AOOs, (2) to sense accident conditions and to initiate the operation of systems and components important to safety, (3) to fail into a safe state or into a state demonstrated to be acceptable on some other defined basis, and (4) to assure that specified acceptable fuel design limits are not exceeded for any single malfunction of the reactivity control systems, such as accidental withdrawal of control rods. In order to support these GDCs, the UFSAR states that a reactor trip is accomplished by de-energizing the control element drive mechanism (CEDM) bolting latch coils through the interruption of the CEDM power supply.
The CEAs are, thus, released to drop into the core reducing reactor power. Also, a loss of power to the CEDM holding coils results in gravity insertion of the CEAs into the core. The rate of negative reactivity insertion with the propose change remains greater than that used in the safety analysis. Reactor shutdown with CEAs is accomplished completely independent of the control functions since the trip breakers interrupt power to the CEDM regardless of existing control signals. The above functions continue to be available even with the change in TS provided in this LAR.
GDCs 10, 26, 27, 28 - Reactivity control systems: These GDCs require that one of two reactivity control systems shall use control rods, preferably including a positive means for inserting the
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure I Page 6 of 6 rods, and shall be capable of reliably controlling reactivity changes to assure that under conditions of normal operation, including AOOs, and with appropriate margin for malfunctions such as stuck rods, specified acceptable safety fuel design limits (SFDL) are not exceeded. The reactivity control systems shall be designed to have a combined capability, in conjunction with poison addition by the emergency core cooling system, of reliably controlling reactivity changes to assure that under postulated accident conditions and with appropriate margin for stuck rods the capability to shutdown the reactor and cool the core is maintained. The reactivity control systems shall also be designed with appropriate limits on the potential amount and rate of reactivity increase to assure that the effects of postulated reactivity accidents can neither (1) result in damage to the RCPB greater than limited local yielding nor (2) sufficiently disturb the core, its support structures, or other reactor pressure vessel internals to impair significantly the capability to cool the core.
According to the UFSAR and to support the above requirements, the CEAs are inserted into the reactor core by a positive means (gravity) and they are capable of reliably controlling reactivity changes to assure that under conditions of normal operation, including specified AOOs, specified acceptable SFDLs are not exceeded. The CEAs can also be mechanically driven into the core.
The appropriate margin for stuck rods is provided by assuming in the analyses of AOOs that the highest worth CEA does not fall into the core. In addition, the Safety Injection System, in conjunction with the combined capabilities of the reactivity control systems is available to maintain short and long term cooling of the core even in the event a CEA of highest worth is stuck out of the core. None of the above functions of the CEAs are altered or affected by the TS change provided in this LAR.
In conclusion, on the basis of the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
4.0 ENVIRONMENTAL EVALUATION A review has determined that the amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is required in connection with the proposed amendment.
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 2 Page 1 of 2 ENCLOSURE 2 Proposed Technical Specification Changes Page 3/4 1-24
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 2 Page 2 of 2 REACTIVITY CONTROL SYSTEMS 3.2 CEA DROP TIME I I ,,I11
- e lr.l'F i * ,l rcf1. rDA'tMI K.
3.1.3.4 The individual full-length (shutdown and regulating) 9,/EA drop time, from a fully withdrawn position, shall be less than or equal to -34seconds from when the electrical power is interrupted to the CEA drive mechanism until the CEA reaches its 90% insertion position with:
- a. Tavg greater than or equal to 5151F, and
- b. All reactor coolant pumps operating.
APPLICABILITY: MODES 1 and 2.
ACTION:
- a. With the drop time of any full-length CEA determined to exceed the above limit:
- 1. If in MODE 1 or 2, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, or
- 2. If in MODE 3, 4, or 5, restore the CEA drop time to within the above limit prior to proceeding to MODE 1 or 2.
- b. With the CEA drop times within limits but determined at less than full reactor coolant flow, operation may proceed provided THERMAL POWER is restricted to less than or equal to the maximum THERMAL POWER level allowable for the reactor coolant pump combination operating at the time of CEA drop time determination.
SURVEILLANCE REQUIREMENTS 4.1.3.4 The CEA drop time of full-length CEAs shall be demonstrated through measurement prior to reactor criticality:
- a. For all CEAs following each removal and installation of the reactor vessel head,
- b. For specifically affected individuals CEAs following any main-tenance on or modification to the CEA drive system which could affect the drop time of those specific CEAs, and
- c. At least once per 18 months.
ST. LUCIE - UNIT 2 3/4 1-24 Amendment No. 8, -38
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 3 Page 1 of 2 ENCLOSURE 3 Revised Technical Specification Pages Page 3/4 1-24
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 3 Page 2 of 2 REACTIVITY CONTROL SYSTEMS CEA DROP TIME 3.1.3.4 The individual full-length (shutdown and regulating) CEA drop time, from a fully withdrawn position, shall be less than or equal to 3.2 seconds from when the electrical power is interrupted to the CEA drive mechanism until the CEA reaches its 90% insertion position with:
- a. Tavg greater than or equal to 515°F, and
- b. All reactor coolant pumps operating.
APPLICABILITY: MODES 1 and 2.
ACTION:
- a. With the drop time of any full-length CEA determined to exceed the above limit:
- 1. If in MODE 1 or 2, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, or
- 2. If in MODE 3, 4, or 5, restore the CEA drop time to within the above limit prior to proceeding to MODE 1 or 2.
- b. With the CEA drop times within limits but determined at less than full reactor coolant flow, operation may proceed provided THERMAL POWER is restricted to less than or equal to the maximum THERMAL POWER level allowable for the reactor coolant pump combination operating at the time of CEA drop time determination.
SURVEILLANCE REQUIREMENTS 4.1.3.4 The CEA drop time of full-length CEAs shall be demonstrated through measurement prior to reactor criticality:
- a. For all CEAs following each removal and installation of the reactor vessel head,
- b. For specifically affected individuals CEAs following any main-tenance on or modification to the CEA drive system which could affect the drop time of those specific CEAs, and
- c. At least once per 18 months.
ST. LUCIE - UNIT 2 3/4 1-24 Amendment No. 8, ,8
St. Lucie Unit 2 L-2009-127 Docket No. 50-389 Enclosure 4 Page 1 of I ENCLOSURE 4 Regulatory Commitments The following table identifies those actions committed to by Florida Power & Light in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to Mr. Eric Katzman, Licensing Manager, St. Lucie Plant.
REGULATORY COMMITMENTS DUE DATE/EVENT Florida Power & Light will modify Technical Specification To be implemented within 3.1.3.4, consistent with the licensing amendment. 60 days of NRC approval of the amendment.