MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update 2024-01-08
[Table view] |
Text
0Florida I=PL Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 JUL 0 2 2007 L-2007-111 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Attn: Mr. David B. Matthews Division of New Reactor Licensing Re: Florida Power & Light Company Proposed Voluntary Response to:
NRC Regulatory Issue Summary (RIS) 2007-08 Updated Licensing Submittal Information to Support the Desiqn-Centered Licensing Review Approach Florida Power & Light Company (FPL) provides the following voluntary response to NRC Regulatory Issue Summary (RIS) 2007-08.
Licensinq Submittal Information Question - Will the applicants be organized into DCWGs? If so, what is the membership and who is the single point of contact designated for each DCWG?
Have protocols been developed to provide coordinated responses for RAIs with generic applicability to a design center?
FPL Response FPL is currently evaluating the technologies associated with the facility designs.
FPL is desirous of participating with the Design Centered Working Group (DCWG) formed to implement the design-centered review approach (DCRA).
Once a technology is selected FPL will participate in a DCWG.
Question - Which applicant referencing the design will be designated as the R-COL applicant?
FPL Response FPL will select the R-COL for reference after the specific technology has been selected.
Question - When (month and year) will each of the COL applications be submitted for review? In addition, what is the design, site location, and the numbers of units at each site?
an FPL Group company
L-2007-111 NRC Regulatory Issue Summary (RIS) 2007-08 Page 2 FPL Response FPL is working to submit a COL application in March 2009. The application will be for two units of undetermined technology. The application will be based on two units at its existing Turkey Point site.
Question - What portions of the R-COL application (chapters, sections, subsections) will be relying on the Design Certification (DC)?
FPL Response Since a technology has not as yet been selected, it is too early for FPL to provide with any certainty or specificity those portions of the R-COL applications that will be relying on the DC.
Question - What portions of the R-COL application (chapters, sections, subsections) will be referenced (i.e., replicated verbatim) in S-COL applications and what portions of the application are likely to be site-specific?
FPL Response Since a technology has not as yet been selected, it is too early for FPL to provide with any certainty or specificity those portions of the R-COL applications that can be replicated or will require modification to accommodate site-specific information in an S-COL application.
Question - When (month and year) will applicants complete the detailed design information to be verified under those inspections, tests, analyses, and acceptance criteria that are directed at certification information (design acceptance criteria)? Will this information be completed in a design certification amendment application, in the R-COL application, in S-COL applications, in post-COL Final Safety Analysis Report Updates, or a combination thereof?
FPL Response Since neither a technology nor a COL vendor has been selected, it is too early for FPL to provide a schedule pertaining to verification of design information or how the information will be completed.
Site and Environmental Information Question- Do any applicants intend to apply for an Early Site Permit (ESP) prior to submitting their COL applications. If so, when (month and year) would the proposed ESP be submitted to the NRC for review?
FPL Response FPL does not currently plan to submit an ESP prior to submitting the COL application.
L-2007-111 NRC Regulatory Issue Summary (RIS) 2007-08 Page 3 Question - For ESP applicants, is the applicant going to be seeking approval of either "proposed major features of the emergency plans" per 10 CFR 52.17(b)(2)(i) or "proposed complete and integrated emergency plans" per 10CFR 52.17(b)(2)(ii)?
FPL Response FPL does not currently plan to submit an Early Site Permit (ESP) prior to submitting the COLA, therefore this question is not applicable.
Question - Do the applicants plan to submit an environmental report or limited work authorization request prior to other portions of the COL application, and if so, when (month and year)?
FPL Response FPL has not made a decision on whether or not to submit an environmental report or a limited work authorization request prior to other portions of the COL application.
Question - What scope and schedule do applicants project for site characterization activities, such as core borings and testing of core samples?
FPL Response FPL has not selected a technology or a COL vendor yet, and as such does not have a firm scope or a schedule regarding site characterization activities.
However, in order to support a March 2009 COLA filing target, FPL plans to initiate site characterization activities in January 2008.
Question - What interactions have taken place with local and state authorities and other Federal agencies to support licensing new reactors?
FPL Response FPL has currently filed a Public Hearing Application with Miami Dade County, Florida as part of its consideration of use of the Turkey Point site. FPL is also engaged in preparation of a need petition which will be filed with the Florida Public Service Commission. It is expected that both processes will come to conclusion by the end of 2007. COL application preparation will begin following the completion of these steps.
L-2007-111 NRC Regulatory Issue Summary (RIS) 2007-08 Page 4 Plant Construction Requirements Information Question - Who are the vendors and consultants that are assisting in the preparation of the application? The NRC requests that the potential applicants submit a list of entities that are providing input to and are preparing the COL application under a QA program.
FPL Response FPL has not selected a COL vendor and is not currently active in the preparation of a COL application.
Question - What information do the applicants have regarding the timing of construction, the ordering of long lead time components, and other commitments to construction? Furthermore, what vendors will be designing, manufacturing, fabricating, and testing safety-related components for eventual plant construction?
FPL Response FPL has not selected a technology, COL vendor or construction vendor yet, and as such does not have information regarding construction schedules or activities.
Ifyou have any questions regarding the responses, please contact Martin Gettler at (561) 691-7487.
Sincerely yours, J.A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer