Submittal of Cyber Security Plan, Revision 1
ML18064A141
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/27/2018
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-18-014
Download: ML18064A141 (3)


Text

FENOC' 5501 North State Route 2 Oak Harbor. Ohio 43449 FirstEnergy Nuclear Operating Company Mark B. Bezilla 419-321-7676 Vice President, Nuclear February 27, 2018 10 CFR 50.54(p)(2)

L-18-014 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Davis-Besse Nuclear Power Station Cyber Security Plan (Revision 1)

This letter forwards Revision 1 of the Davis-Besse Nuclear Power Station (DBNPS)

Cyber Security Plan (CSP), which was effective on December 11, 2017. The Attachment provides a summary of the Revision 1 CSP changes. These changes were reviewed and determined not to decrease the effectiveness of the DBNPS CSP.

Accordingly, this revision is being submitted in accordance with provisions of 10 CFR 50.54(p)(2).

The Enclosure containing the revision of the DBNPS CSP contains Security Related Information and should be withheld from public disclosure under the provisions of 10 CFR 2.390.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager, Site Protection, at (419) 321-7253.

Sincerely, , // ?if

$Jt61~ '/

Mark B. Bezilla

Attachment:

Summary of DBNPS CSP Revision 1 Changes THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY RELATED INFORMATION. WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED.

Davis-Besse Nuclear Power Station, Unit 1 L,.18-014 Page 2 of 2

Enclosure:

DBNPS Cyber Security Plan, Revision 1 cc: NRC Region Ill Administrator DB-1 NRC Senior Resident Inspector (w/o Enclosure)

DB-1 NRR Project Manager (w/o Enclosure)

Director BRP/DEP (w/o Enclosure)

Site BRP/DEP Representative (w/o Enclosure)

THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY RELATED INFORMATION. WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 Enclosure L-18-014 Davis-Besse Nuclear Power Station (DBNPS)

Cyber Security Plan (CSP) Revision 1 THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY RELATED INFORMATION. WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ENCLOSURE, THIS LETTER IS UNCONTROLLED.