Response to Request for Additional Information Regarding: Request for Exemption
ML100210195
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/19/2010
From: Joseph Pechacek
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-10-0011, TAC ME0727
Download: ML100210195 (4)


Text

Entergy Nuclear Northeast SEn tergy== Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Joseph Pechacek Licensing Manager January 19, 2010 JAFP-10-00 11 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant - Response to Request For Additional Information Regarding: Request For Exemption (TAC No.

ME0727)

Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59

References:

1) Entergy Letter, JAFP-09-0025, James A. FitzPatrick Nuclear Power Plant Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions (TAC No. ME0727), dated February 18, 2009.
2) USNRC Letter, James A. FitzPatrick Nuclear Power Plant - Request For Information Required for Acceptance Review Re: Request For Exemption (TAC No. ME0727), dated March 20, 2009.
3) Entergy Letter, JAFP-09-0038, James A. FitzPatrick Nuclear Power Plant -

Response to Request For Information Required for Acceptance Review Regarding: Request For Exemption (TAC No. ME0727), dated March 30, 2009.

4) USNRC Telephone Request For Additional Information On The Request For Exemption From 10 CFR 50, Appendix R, Section III.G.2 Requirements Based On Manual Actions At James A. Fitzpatrick Nuclear Power Plant (TAC No. ME0727), dated December 2, 2009.
5) Entergy Letter, JAFP-09-0144, James A. FitzPatrick Nuclear Power Plant -

Response to Request For Information Regarding: Request For Exemption (TAC No. ME0727), dated December 11, 2009.

6) USNRC Request For Additional Information On The Request For Exemption From 10 CFR 50, Appendix R, Section III.G.2 Requirements Based On Manual Actions At James A. Fitzpatrick Nuclear Power Plant (TAC No.

ME0727), dated January 13, 2010. 4oI 4 AAocf at

JAFP-1 0-0011 Page 2 of 2

Dear Sir or Madam:

Entergy Nuclear Operations Inc., (ENO) submitted James A. FitzPatrick'Nuclear Power Plant Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions (TAC No. ME0727), dated February 18, 2009 [Reference 1]. Subsequently, ENO received James A. FitzPatrick Nuclear Power Plant - Request For Information Re:

Request For Exemption (TAC No. ME0727), dated March 20, 2009 [Reference 2]. Entergy responded to that request on March 30, 2009 [Reference 3]. On December 2, 2009 Entergy received a second Request for Additional Information (RAI) [Reference 4]. On December 11, 2009 Entergy provided a written response [Reference 5] to the RAI. Subsequent to Entergy's response [Reference 5], the staff provided a further RAI to support their review of the exemption request [Reference 6]. This letter provides the information requested in reference 6 as discussed via telephone with the NRC staff.

There are no new commitments made in this letter.

If you have any questions or require additional information, please contact me, at 315-349-6766.

Si r JosepIPechacek Licensi UgManager : Request For Additional Information On The Request For Exemption From 10 CFR 50, Appendix R, Section III.G.2 Requirements Based On Manual Actions At James A. Fitzpatrick Nuclear Power Plant (TAC No. ME0727)

J P/ed cc:

Mr. Samuel J. Collins, Regional Administrator Mr. Bhalchandra K. Vaidya U.S. Nuclear Regulatory Commission, Region I Project Manager, LPL1-1 475 Allendale Road Division of Operating Reactor Licensing, King of Prussia, PA 19406-1415 Office of Nuclear Reactor Regulations, Mail Stop: 08C2A Office of NRC Resident Inspector Washington DC 20555 James A. Fitzpatrick Nuclear Power Plant P.O. Box 136 Mr. Paul Eddy Lycoming, New York 13093 New York State Department of Public Services Mr. Francis Murray, President 3 Empire State Plaza New York State Energy Research and Albany, New York 12223-1350 Development Authority 17 Columbia Circle Albany, New York 12203-6399

SJAFP-10-0011 Enclosure 1' Request For Additional Information On The Request For Exemption From 10 CFR 50, Appendix R, Section III.G.2 Requirements Based On Manual Actions At James A. Fitzpatrick Nuclear Power Plant (TAC No. ME0727)

JAFP-1 0-0011 Enclosure 1 Request For Additional Information On The Request For Exemption From 10 CFR 50, Appendix R, Section III.G.2 Requirements Based On Manual Actions At James A. Fitzpatrick Nuclear Power Plant (TAC No. ME0727)

RAI Question In the licensee's submission dated March 30, 2009, the licensee stated that the cables in Fire Area 10 are IEEE-383 qualified, or equivalent. Please state whether the cables in. question are thermoplastic or thermoset.

RAI Response The Automatic Depressurization System (ADS) control cables are located in a stack of six cable trays as discussed in earlier submittals. Based on a review of the James A. FitzPatrick Nuclear Power Plant (JAF) cable and raceway database, approximately 600 cables are present in these trays. All of the cable mark numbers were reviewed against the information in the cable and raceway database as well-as the original purchase specifications. This review concluded that all of the cables located in the stack of cable trays discussed in the March 30, 2009 submittal, that contain the ADS control cables, are thermoset.