James a FitzPatrick, Independent Spent Fuel Storage Installation (ISFSI) - Registration Information of Spent Fuel Cask Use
ML092680139
Person / Time
Site: FitzPatrick, Holtec  Constellation icon.png
Issue date: 09/21/2009
From: Joseph Pechacek
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
JAFP-09-0107
Download: ML092680139 (3)


Text

mEntergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Joseph Pechacek Licensing Manager September 21, 2009 JAFP-09-0107 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Registration of Spent Fuel Cask Use James A FitzPatrick Nuclear Power Plant Docket No.s 50-333 and 72-12 License No. DPR-59

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. (ENO), Entergy Nuclear Northeast operates the James A.

FitzPatrick (JAF) Nuclear Power Plant Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 10 CFR 72.210. The conditions of 10 CFR 72.212(b)(1)(ii) include the registration of a spent fuel cask within 30 days of using a cask for storage of spent nuclear fuel. Accordingly, JAF provides the following registration information associated with four (4) HI-STORM 100 spent fuel cask systems that were recently placed into storage in the JAF ISFSI.

Cask Certificate: 72-1014 Cask Model: HI-STORM 100S

-MPC Serial Number: 221 Overpack Serial Number: 307 Number of Fuel Bundles: 68 Placed in Service: 07/14/2009 Cask Certificate: 72-1014 Cask Model: HI-STORM 100S MPC Serial Number: 222 Overpack Serial Number: 309 Number of Fuel Bundles: 68 Placed in Service: 07/27/2009 Cask Certificate: 72-1014 Cask Model: HI-STORM 100S MPC Serial Number: 255 Overpack Serial Number: 308 Number of Fuel Bundles: 68 Placed in Service: 08/23/2009 loe'-o I

'P-50

'ýj JAFP-09-0107 Page 2 of 3 Cask Certificate: 72-1014 Cask Model: HI-STORM 100S MPC Serial Number: 219 Overpack Serial Number: 311 Number of Fuel Bundles: 68 Placed in Service: 09/08/2009 Total Cask Systems stored in the JAF ISFSI: Thirteen (13) HI-STORM 100 Cask Systems As identified by the inservice date, the notification for MPC casks 221 and 222 is not within the required 30 days. This has been addressed within the corrective action program.

This letter contains no new commitments. Should you have any questions or require further information, please contact me, at (315) 349-6766.

/

yo t , ly I Ver Josep Pechacek Licen ing Manager JP/ed cc: see next page

JAFP-09-0107 Page 3 of 3 cc: Director, Spent Fuel Project Office Office of Nuclear Material and Safeguards U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-G14 Washington, DC 20555-0001 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 1 0 th Floor Albany NY 12223 Mr. Francis J. Murray Jr., President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203