MONTHYEARJAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation 2024-09-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARJAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21181A0572021-11-0404 November 2021 Issuance of Amendment No. 344 Adoption of TSTF-545 JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule2020-12-11011 December 2020 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.62020-12-11011 December 2020 Application to Revise Surveillance Requirement (SR) 3.5.1.6 JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves2020-06-30030 June 2020 License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.2020-06-30030 June 2020 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2020-02-24024 February 2020 Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...2020-01-23023 January 2020 License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2019-09-0505 September 2019 License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02019-03-0707 March 2019 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. JAFP-18-0106, License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications2018-11-29029 November 2018 License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO JAFP-18-0093, License Amendment Request - Reactivity Anomalies Surveillance2018-10-0202 October 2018 License Amendment Request - Reactivity Anomalies Surveillance ML18292A5282018-09-25025 September 2018 Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement 2024-09-25
[Table view] |
Text
Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 December 28, 2006 JAFP-06-0181 Pete Dietrich Site Vice President
-JAF U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
REFERENCES:
1.Letter, Entergy to USNRC, "James A. FitzPatrick Nuclear Power Plant, Docket No. 50-333, License No. DPR-59, License Renewal Application," JAFP-06-0109, dated July 31, 2006 2. Letter, USNRC to JAFNPP, "Requests for Additional Information Regarding the Review of the License Renewal Application for James A. FitzPatrick Nuclear Power Plant (TAC No. MD2667)," dated November 29, 2006
SUBJECT:
Entergy Nuclear Operations, Inc.James A. FitzPatrick Nuclear Power Plant Docket No. 50-333, License No. DPR-59 License Renewal Application, Amendment 3
Dear Sir or Madam:
On July 31, 2006, Entergy Nuclear Operations, Inc. submitted the License Renewal Application for the James A. FitzPatrick Nuclear Power Plant (JAFNPP) as indicated by Reference
- 1. Attachment 1 provides responses to the requests for additional information as detailed by the NRC in Reference 2 that were the result of the scoping and screening review at JAFNPP for structures, specifically, LRA section 2.4.Should you have any questions concerning this submittal, please contact Mr. Jim Costedio at (315) 349-6358.I declare under penalty of perjury that the foregoing is true and correct. Executed on the day of December, 2006.Sinerely, ,¢-cm =PD/djc ,412L Attachment December 28, 2006 JAFP-06-0181 Page 2 of 2 Cc: Mr. N.B. (Tommy) Le, Senior Project Manager License Renewal Branch B Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11-F1 Washington, DC 20555 Mr. Samuel J. Collins, Administrator Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector U. S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. John P. Boska, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 1 0 th Floor Albany, NY 12223 Mr. Peter R. Smith, President NYSERDA 17 Columbia Circle Albany, NY 12203-6399 JAFP-06-0181 Docket No. 50-333 Attachment 1 James A. FitzPatrick Nuclear Power Plant License Renewal Application Supplement Amendment 3 Scoping and Screening Structures RAI Responses RAI 2.4.1-1 RAI 2.4.1-2 RAI 2.4.1-3 RAI 2.4.1-4 RAI 2.4.1-5 RAI 2.4.1-6 RAI 2.4.2-1 RAI 2.4.2-2 RAI 2.4.2-3 RAI 2.4.3-1 RAI 2.4.3-2 RAI 2.4.3-3 RAI 2.4.3-4 RAI 2.4.4-1 RAI 2.4.4-2 Request for Additional Information James A. Fitzpatrick License Renewal Application (LRA)Section 2.4 Scoping and Screening Results: Structures RAI 2.4.1-1 Section 2.4-1, Reactor Building and Primary Containment of the LRA, under Inner Refueling Bellows and Bulkhead Assembly does not clearly state the makeup of the bulkhead assembly.
The staff requests the applicant to provide a list of bulkhead assembly components that are within the scope of license renewal and a drawing that depicts the bulkhead assembly.RAI 2.4.1-1 Response Bulkhead assembly components are not within the scope of license renewal.They are not safety-related and are not required to demonstrate compliance with regulations identified in 10 CFR 54.4(a)(3).
The Table 3.5.2-1, page 3.5-58 line items "inner refueling bellows" and the corresponding line item in Table 2.4-1, page 2.4-20, were inadvertently included in the LRA and are hereby deleted from the LRA. The referenced NUREG-1801 line item (C-20) involves bellows for vent pipe downcomers that are part of the primary containment pressure boundary.The inner refueling bellows is not a containment pressure boundary component.
Failure of these bellows or the assembly will not prevent satisfactory accomplishment of a safety function.
Leakage, if any, through the bellows is directed to a drain system that is located in the lower drywell.RAI 2.4.1-2 Table 2.4-1, Reactor Building of the LRA, does not include drywell head closure bolts and double-gasketed drywell head. These components have the intended function of the drywell pressure boundary.
The staff requests the applicant to provide justification for not including them in the scope of license renewal.RAI 2.4.1-2 Response Drywell head closure bolts are included in item ASME Class 1, 2, 3, and MC supports bolting in Table 2.4-4. The gasket associated with the drywell head is in the scope of license renewal, but is replaced every time the head is removed.Therefore, the drywell head gasket is replaced on a specified frequency and is not subject to aging management review.Attachment 1 JAFP-06-0181 Page 1 of 7 RAI 2.4.1-3 Table 2.4-1, Reactor Building of the LRA, does not incorporate refueling cavity seal components within the scope of license renewal. The proposed license renewal interim staff guidance LR-ISG-2006-01, "Plant Specific Aging Management Program for inaccessible Areas of Boiling Water Reactor Mark 1 Steel Containment Drywell Shell," which was published in the Federal Register on May 9, 2006 stated that the most likely cause of corrosion of the drywell shell in the sand-pocket areas (near the bottom of the drywell), and in the spherical portion of the drywell at higher elevations, was the water in the gap between the drywell and the concrete shield, and the source of the water was noted as leakage through the seal between the drywell and the refueling cavity and leakage through cracked stainless steel liner of the refueling cavity wall.Therefore, the staff requests the applicant include all the refueling cavity seal components within the scope of license renewal and provide a drawing that depicts the refueling cavity seal components.
RAI 2.4.1-3 Response Proposed license renewal interim staff guidance LR-ISG-2006-01, "Plant Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark 1 Steel Containment Drywell Shell," states, if moisture has been detected or suspected in the inaccessible area on the exterior of the drywell shell, include in the scope of license renewal any components that are identified as a source of moisture, such as the refueling seal, and perform an aging management review.There has been no observed leakage causing moisture in the vicinity of the sand cushion at JAFNPP and no moisture has been detected or is suspected on the inaccessible areas of the drywell shell. Therefore, consistent with the ISG, the refueling seal is not subject to aging management review.The attached drawings depict the JAFNPP refueling cavity seal components.
RAI 2.4.1-4 Table 2.4-1, Reactor Building of the LRA, does not include the metal drywell sump screens that provide functional support for safety-related equipment.
The staff requests the applicant to provide justification for not including them in the scope of license renewal.RAI 2.4.1-4 Response JAF drywell sumps do not have screens.Attachment 1 JAFP-06-0181 Page 2 of 7 RAI 2.4.1-5 Table 2.4-1, Primary Containment of the LRA, does not include the reinforced concrete shield plugs that provide shielding over the top of the drywell. Exclusion of the reinforced concrete shield plugs from the scope Of license renewal may lead to long-term unmanaged degradation of the plugs (e.g., full sectional concrete cracking, rebar corrosion, loss of bond, partial spalling or cracking of concrete due to handling, loss of load carrying capacity of plug attachments, etc.)with a seismic Il/I implication, potentially affecting the structural integrity of the drywell head. The staff requests the applicant to provide justification for not including them in the scope of license renewal.RAI 2.4.1-5 Response The reinforced shield plugs that provide shielding over the top of the drywell are included in LRA Table 2.4-4, "Bulk Commodities" under line item "Manways, hatches and hatch covers".RAI 2.4.1-6 Table 2.4-1, Primary Containment of the LRA, does not incorporate spent fuel racks' neutron absorbing material within the scope of license renewal. Long-term unmanaged degradation of the component may excessively reduce the margin of nuclear subcriticality in the fuel pool. The staff requests the applicant to provide justification for not including them in the scope of license renewal.RAI 2.4.1-6 Response Spent fuel racks neutron absorbing material is in the scope of license renewal, it is discussed in Section 2.3.3.9 and listed in Table 2.3.3-9. Results of the aging management review are provided in Table 3.3.2-9." RAI 2.4.2-1 Section 2.4-2, Water Control Structures of the LRA, under Discharge Tunnel states that "failure of this Class II structure could impact the proper operation of the emergency service water system." The staff needs additional information regarding the potential consequences of the Screenwell-Pumphouse (Class II structure) failure. Specifically, the licensee is requested to confirm that appropriate measures have been taken to preclude the failure of this structure which might have adverse effects on the proper operation of the emergency service water system.Attachment 1 JAFP-06-0181 Page 3 of 7 RAI 2.4.2-1 Response In the aging management review, Entergy identified appropriate measures for managing the effects of aging to preclude the failure of this structure which might have adverse effects on the proper operation of the emergency service water system. Service water discharge flow is routed to the lake via the discharge tunnel. Failure of the discharge tunnel could add some restriction to the normal flow path of the service water discharge to the lake. Aging management of the Screenwell-Pumphouse and the Discharge Tunnel is included in the Structures Monitoring Program as specified in Table 3.5.2-2.RAI 2.4.2-2 Table 2.4-2, Water Control Structures of the LRA, do not include anchors, and post-tensioned tendons for the intake structure that anchor the main structure to.the natural bedrock below the lake bottom. The staff requests the applicant to provide justification for not including them in the scope of license renewal and also provide a summary of operating experience regarding settlement of the intake structure.
RAI 2.4.2-2 Response The anchorage system for the intake structure is provided by post-tensioned rock bolts which are in the scope of license renewal. This component is included under anchorages/embedments in Section 2.4.4. Operating experience review did not identify any settlement of the intake structure or degradation of the rock anchor system (Ref. JAF-RPT-05-LRD05).
RAI 2.4.2-3 Table 2.4-2, Water Control Structures of the LRA, lists "Beams, columns, floor slabs and walls" as a component and "Exterior walls" as another component.
The staff requests the applicant to provide clarifications for the two different components by listing all structural members under each component.
RAI 2.4.2-3 Response"Beams, columns, floor slabs and walls" is defined as: substructure or superstructure concrete that is part of the primary structural support function of a building or structure, such as structural columns, support girders, and beams."Exterior walls" is defined as: walls that form the perimeter base of a structure with their primary surface or both surfaces exposed to an outdoor or soil environment (i.e., exposed to weather).Attachment 1 JAFP-06-0181 Page 4 of 7 RAI 2.4.3-1 Section 12.3.9, Main Stack of the UFSAR, states that "The stack is not specifically designed to resist a tornado." The staff needs additional information regarding the potential interaction between some seismic Class II SSCs and the tornado-induced failure of the main stack. Specifically, the licensee is requested to confirm that appropriate measures have been taken to preclude potential interactions between the main stack and some other nearby seismic Class I and Class II SSCs, whose failure might have adverse effects on seismic Class I SSCs.RAI 2.4.3-1 Response Review of the main stack and possible interaction with structural commodities confirms that should a tornado-induced failure of the main stack occur, it will not interact with nearby seismic Class II SSCs whose failure might result in loss of intended function of seismic Class I SSCs. As stated in Section 2.4.3, Turbine building complex and Yard structures of the LRA under "Main Stack", main stack is a seismic Class I reinforced concrete structure.
It is located sufficiently far from other seismic Class I structures to preclude interaction." This includes interaction with seismic Class I SSCs caused by interaction with nearby seismic Class II SSCs whose failure might have adverse effects on seismic Class I SSCs.RAI 2.4.3-2 Section 2.4-3, Turbine Building Complex and Yard Structures, of the LRA under Turbine Building (TB), including Feedwater Heater Bay (HBAY) states that "The main steam lines to the turbine generator from the reactor are housed in a reinforced concrete tunnel that enters the turbine building after passing under the adjacent administration building." The staff needs additional information regarding the potential interaction between the administration building and the failure of main steam lines. Specifically, the licensee is requested to confirm that appropriate measures have been taken to preclude the failure of the main steam lines that might have adverse affects on the administration building.RAI 2.4.3-2 Response Main steam lines are discussed in section 2.3.4.2 and listed in Table 3.3.2-14-16. Appropriate measures (aging management programs) are in place to manage the effects of aging, and preclude failure of the main steam lines and its potential effect on the administration building.Attachment 1 JAFP-06-0181 Page 5 of 7 RAI 2.4.3-3 Table 2.4-3, Turbine Building Complex and Yard Structures of the LRA, lists"Exterior walls" as a component.
The staff is unable to determine whether this component include main stack, main steam line tunnel, and electric bay tunnel. If not, the staff requests the applicant to include these components in the scope of license renewal.RAI 2.4.3-3 Response Exterior walls are defined as: walls that form the perimeter base of a structure with their primary surface or both surfaces exposed to an outdoor or soil environment (i.e., exposed to weather).
This would include the exterior walls of those structures listed.RAI 2.4.3-4 Table 2.4-3, Turbine Building Complex, and Yard Structures of the LRA, does not include sumps that provide functional support for safety and nonsafety-related equipment.
The staff requests the applicant to provide justification for not including them in the scope of license renewal.RAI 2.4.3-4 Response The in-scope unlined sumps in the east cable tunnel are a part of the concrete floor structure.
There are no other sumps in the turbine building complex and yard structures that provide functional support for safety and nonsafety-related equipment.
Turbine building equipment drain tanks within the scope of license renewal are addressed in LRA Section 2.3.3.12, Radwaste and Plant Drains.RAI 2.4.4-1 Table 2.4-4, Bulk Commodities of the LRA, provides a list of bulk commodities for the Fitzpatrick Nuclear Power Plant. The location of each component is unclear to the staff. The staff requests the applicant to describe all commodities on the list as well as to provide a comprehensive listing of components, component supports and locations for each commodity.
RAI 2.4.4-1 Response As stated in Section 2.4.4, the bulk commodities common to JAF in-scope structures are listed in Table 2.4-4. Commodities unique to a specific structure are included in the review for that structure (Sections 2.4.1 through 2.4.3). The commodities listed in Table 2.4-4 are in scope and subject to aging management review regardless of which in-scope structure they are within. Components classified as bulk Attachment 1 JAFP-06-0181 Page 6 of 7 commodities typically have no unique component identification numbers. Therefore, a comprehensive listing of components and locations is not feasible.RAI 2.4.4-2 Table 2.4-4, Bulk Commodities of the LRA, lists "insulation" with the intended functions.
It is unclear to the staff why "Support for Criterion (a)(1) equipment" is not part of the intended functions when Table 2.0-1 defines the intended function of insulation as "provide insulating characteristics to reduce heat transfer," which is meant to apply to safety.related and non-safety related components.
The staff requests the applicant to provide additional information on insulation and a list of in-scope components that have insulation included with their intended functions.
RAI 2.4.4-2 Response LRA Table 2.4-4 lists two functions for insulation.
The first, "Insulation," is described in Table 2.0-1 as "Provide insulating characteristics to reduce heat transfer." This function does apply to safety-related and non-safety related components.
The second function, "Support for Criterion (a)(2) equipment," is described in Table 2.0-1 as "Provide structural or functional support to non-safety related equipment whose failure could impact safety-related equipment." This means the non-safety related insulation must maintain integrity such that falling insulation does not damage safety-related equipment.
Therefore, "Support for Criterion (a)(1) equipment" need not be listed as a separate intended function for insulation.
Examples of in-scope components that have insulation addressed by this line item in LRA Table 2.4-4 are the recirculation system piping, valves, and pump casings, and main steam safety/relief valves. Insulation was evaluated as a commodity since it was not practical to develop a list of individual components insulated.
Therefore, a list of insulated components is not available.
Attachment 1 JAFP-06-0181 Page 7 of 7 JAFP-06-0181 Docket No. 50-333 Attachment 1 James A. FitzPatrick Nuclear Power Plant License Renewal Application Supplement Amendment 3 Scoping and Screening Structures Drawings for RAI Response 2.4.1-3 THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED: DRAWING NO. 729E729, REV. 0"ARRANGEMENT REACTOR WELL SEAL"'WITHIN THIS PACKAGE...
OR BY SEARCHING USING THE DOCUMENT/REPORT NO.D-O1 THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED: DRAWING NO.920D714"REFUELING BELLOWS".WITHIN THIS PACKAGE...
OR BY SEARCHING USING THE DOCUMENT/REPORT NO.D-02 THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED: "DETAIL-BULKHEAD AND REFUELING BELLOWS".WITHIN THIS PACKAGE...
OR BY SEARCHING USING THE DOCUMENT/REPORT NO.D-03X