JAFP-06-0057, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power

From kanterella
Jump to navigation Jump to search
Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
ML060940178
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/30/2006
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-06-002, JAFP-06-0057
Download: ML060940178 (30)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP RO. Box 110 Ente(,g1y

_7__.

ULycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan March 30, 2006 Site Vice President - JAF JAFP-06-0057 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 1555 Rockville Pike Rockville, Maryland 20852

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power

References:

1. NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006

Dear Sir or Madam:

The NRC issued Generic Letter 2006-02 (Reference 1) to request information for determining compliance with regulatory requirements governing electric power sources.

Specifically, the NRC is requesting information regarding (1) use of protocols between the nuclear power plant (NPP) and the transmission system operator (TSO),

independent system operator (ISO), or reliability coordinator/authority (RCIRA) including transmission load flow analysis tools (analysis tools) by TSOs to assist NPPs in monitoring grid conditions to determine the operability of offsite power systems under plant Technical Specification (TS); (2) use of NPP/TSO protocols and analysis tools by TSOs to assist NPPs in monitoring grid conditions for consideration in maintenance risk assessments; (3) offsite power restoration procedures in accordance with Section 2 of NRC Regulatory Guide (RG) 1.155, "Station Blackout;" and, (4) losses of offsite power caused by grid failures at a frequency equal to or greater than once in 20 site-years in accordance with RG 1.155. The requested information is being provided under the requirements of 10 CFR 50.54(f.

Attachment 1 to this letter provides the James A. FitzPatrick Nuclear Power Plant (JAFNPP) response to Generic Letter 2006-02. Generic Letter 2006-02 discusses compliance with General Design Criterion (GDC) 17 in several locations. The exact extent of compliance of JAFNPP to the GDC is described in JAFNPP's Updated Final Safety Analysis Report.

Some of the questions in Generic Letter 2006-02 seek information, procedures and activities concerning grid reliability for which JAFNPP does not have first-hand knowledge. JAFNPP has not independently verified all information provided by:

  • National Grid USA

There are no commitments contained in this letter. If you should have any questions, please contact Jim Costedio, Regulatory Compliance Manager, at (315) 349-6358. I declare under penalty of perjury that the foregoing is true and correct.

Executed on Ma 30 , 2006.

Very truly yours, T.

TS:RP:dmr

Attachment:

As stated cc:

Regional Administrator, Region 1 Resident Inspector's Office U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road James A. FitzPatrick Nuclear Power lant King of Prussia, PA 19406-1415 PO Box 136 Lycoming, NY 13093 Mr. John Boska, Project Manager Mr. Paul Eddy Plant Licensing Branch 1-1 New York State Dept. of Public Service Division of Operating Reactor Licensing 3 Empire State Plaza Office of Nuclear Reactor Regulation Albany, NY 12223-1350 U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Mr. Peter R. Smith, President New York State Energy, Research,

& Development Authority 17 Columbia Circle Albany, NY 12203-6399

Attachment I James A. FitzPatrick Nuclear Power Plant Response to NRC Generic Letter 2006-002 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 1 of 27 1.Use of protocols between the NPP licensee and the vTSOISO, or- RCIRA to assist the NPP licenseejin monitoringgrid conditions ';

to determine the orerabilitv of offsite power systems under plant Technicaal Se6cifications. -- nt t . - I. I I ' .' '. - '

1(a) Do you have a formal Yes. Formal communications protocols have been established between JAFNPP and the New York agreement or protocol with Independent System Operator (NYISO) and the Transmission Owners (TO). JAFNPP has a number your TSO? of formal agreements with the NYISO and TOs as follows:

  • Interconnection Agreement with the New York Power Authority (NYPA) for the 345kV power transmission system

. New York State Transmission Tariffs with NYISO

. NYISO Customer & Guest Application Form of Service Agreement for NYISO Market Administration and Control Area Service Tariff

. Operating Coordination Agreement with National Grid (NG) (previously known as Niagara Mohawk Power Corporation), and NYPA

. Electric Service Agreement with National Grid for the 115kV offsite power transmission system

  • Agreement for Contingency Alarm Services with National Grid for the 115kV offsite power transmission system In the New York Reliability Coordinator Area, the NYISO has operational authority over the bulk power system. The TOs have operational authority over the non-bulk power system. The NYISO and TSOs operate the New York electric transmission system in accordance with the North American Electric Reliability Council (NERC), Northeast Power Coordinating Council (NPCC) and New York State Reliability Council (NYSRC) criteria. Established communications protocols exist between the NYISO and the TOs. Communications to the generating resources are through the TOs, which perform the TSO function. The associated TSOs monitor the localized grid conditions and coordinate issues such as off site power operability with JAFNPP.

1(b) Describe any grid The TSOs (NG and NYPA) are required to notify JAFNPP whenever an impairment or potentially conditions that would trigger degraded grid condition is recognized by the TSOs. The TSOs have the following information in a notification from the TSO their notification procedures:

to the NPP licensee and if there is a time period . National Grid should notify the JAFNPP immediately if emergency events or conditions required for the notification. threaten 115 kV or 345 kV grid stability or reliability. JAFNPP requests notification to reduce

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 2 of 27 e,t! . I-S .! -iv.:

the risk of a unit trip. Notification should also be made when conditions no longer exist

  • National Grid should notify the JAFNPP approximately 15 minutes prior to de-energizing, switching, or beginning in-service work on 115kV transmission lines associated with JAFNPP
  • NYPA should notify the JAFNPP prior to de-energizing, switching, or beginning in-service work on 345kV transmission lines associated with JAFNPP
  • National Grid should notify the JAFNPP of potentially damaging inclement weather or solar magnetic disturbances that may impact the security of the Oswego complex (i.e.,

transmission system in the area of JAFNPP). Notification times are specified within NG procedures. However, good utility practice would require a prompt notification, commensurate with the duty burden of the system security operator during the time of the event.

  • NYPA should notify the JAFNPP of ordered power reductions in generation for system security.
  • Notifications for post-LOCA contingency low voltage alarm should be performed in accordance with NG procedures. Notification time is made following a verification of the alarm, via a second contingency load flow analysis, generated by the Energy Management System (EMS) computer system.

These notification guidelines are specified in National Grid and NYPA procedures.

1(c) Describe any arid JAFNPP has procedures that require notification and communication with the ISO and/or TSOs for conditions that would cause changes in the following grid conditions:

the NPP licensee to contact the TSO. . Plant start-up, plant shutdown and plant power changes

. Every shift, prior to turnover, JAF contacts the TSO to verify status of the 115kV and 345kV Describe the procedures transmission lines associated with such a

  • Modifications resulting in changes to generator electrical characteristics, post-trip off-site voltage communication. If you do criteria, or changes in JAFNPP post trip station or accident loading not have procedures, . If 115kV line voltage is outside the 116kV to 122kV normal operating range describe how you assess . If 345kV line voltage is outside the 345kV to 368kV normal operating range grid conditions that may . Method of voltage control, (i.e., automatic or manual) cause the NPP licensee to . Planned maintenance activities such as switchyard work, Emergency Diesel Generator (EDG) contact the TSO. maintenance or relay testing associated with the offsite power sources

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 3 of 27 e, S  !! _g £ -'iEW

  • Emergent work associated with the offsite power systems
  • Entry into an unplanned LCO associated with 115kV offsite power
  • Every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> if an off-site circuit is inoperable
  • Every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> if an EDG subsystem is inoperable
  • Any plant condition that may threaten continued plant operation or possible plant power change
  • Any grid digital transient recorder alarm not due to station relaying on either the 115kV or 345kV system
  • Severe weather conditions, unit trips, unusual grid loading and equipment failures that may affect grid stability
  • Degraded breaker air pressure or high SF6 gas differential pressure for breaker
  • Loss of 13.2 kV supply to the site
  • Loss of offsite power or loss of offsite power is imminent 4.

1(d) Describe how NPP Licensed operators are provided training (classroom and simulator) and are tested on grid operators are trained and conditions. Training topics include but are not limited to:

tested on the use of the . Electrical distribution systems procedures or . Operating Procedures for 11 5kV and 345kV systems assessing grid conditions in

  • Notification of the ISO and/or TSO of changing conditions question 1(c). . Abnormal Operating Procedures (which includes loss of offsite power and major grid disturbances)

. Selected Significant Operating Event Report recommendations, which include SOER 99-01, Loss of Grid

. Emergency conditions Examination criterion for each of the above topics is specified in the applicable program lesson plan.

1(e) Ifyou do not have a Not applicable. Formal agreements exist.

formal agreement or protocol with your TSO, describe why you believe you continue to comply with the provisions of ,

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page4of 27 IGDC 17 as stated above, or I S A -

describe what actions you intend to take to assure compliance with GDC 17. -I 1(f) If you have an existing As previously stated, JAFNPP does have a formal agreement with the TSO that addresses formal interconnection communication and coordination between JAFNPP and the TSO.

agreement or protocol that ensures adequate Notifications for post-LOCA contingency low voltage alarm are performed in accordance with TSO communication and procedures. Notification is made following a verification of the alarm. The verification is determined coordination between the via contingency load flow analyses that are generated by the TSO using the EMS computer system.

NPP licensee and the TSO, describe whether this agreement or protocol requires that you be promptly notified when the conditions of the surrounding grid could result in degraded voltage (i.e., below TS nominal trip setpoint value requirements; including NPP licensees using allowable value in its TSs).

or LOOP after a trip of the _-

reactor unit(s).

1(g) Describe the low JAFNPP switchyard voltage was analyzed for worst case reserve station service transformer loading switchyard voltage conditions, which is the unit trip with LOCA scenario. The minimum required 115 kV switchyard conditions that would initiate voltage is based on maintaining emergency bus voltage above the reset point of the second level operation of plant degraded voltage protection relays (degraded voltage relay reset is approximately 3920 VAC) during the unit voltage protection. trip with LOCA scenario. This requires switchyard voltage to remain at or above 112.0 kV. If switchyard voltage falls below this level, and 4 kV emergency bus voltage reaches the degraded voltage relay dropout setpoint of 3871 +/- 28V for a maximum of 9.5 seconds with LOCA or a

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 5 of 27 SI. S . i i_' -. -t l11 Il~uile sg maximum of 46.6 seconds without LOCA, the emergency switchgear is transferred to the on-site EDGs. As the JAFNPP unit trip with LOCA provides the greatest reserve station service transformer loading, the minimum acceptable switchyard voltage is based on this analyzed scenario.

. , . .. . .- .. I- .

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 6 of 27 we] s.,T- m . -- S.m -----

- '-Use-of criteria and methodologies to assess whether-the-offsite power system-will'become iperable asa'result of a trip o 2(a) Does your NPP's TSO Yes. National Grid (TSO) maintains an Energy Management System (EMS) and associated security use any analysis tools, an model. The EMS is a system of computer-aided tools used by system operators to monitor and online analytical control the performance of the transmission system. The TSO also maintains a security model that transmission system studies includes a State Estimator (SE) and a Contingency Evaluation Program (CEP). The CEP solves program, or other equivalent pre-defined contingencies on the electric system, including a trip of JAFNPP and transfer of station predictive methods to and LOCA loading to the offsite power system. If the JAFNPP 115kV system post-trip low voltage determine the grid conditions contingency limit is exceeded, an alarm is generated and the JAFNPP control room is notified.

that would make the NPP offsite power system The program creates a real-time network model starting with bus/branch connectivity, branch inoperable during various impedances and ratings, and steady state generator models. The program then superimposes real-contingencies? time switch and breaker status to determine network topology. Real-time generation and bus loads If available to you, please are applied to this model.

provide a brief description of the analysis tool that is used by the TSO. +

2(b) Does your NPP's TSO Yes. The TSO notifies the JAFNPP control room operator of a post-trip low voltage contingency use an analysis tool as the alarm determined by the TSO's CEP computer system. The notifications from the TSO are made in basis for notifying the NPP accordance with National Grid procedures.

licensee when such a condition is identified? If not, how does the TSO determine if conditions on the grid warrant NPP licensee notification?

2(c) If your TSO uses an Yes. The CEP solves the pre-defined contingency of a trip of JAFNPP and transfer of station and analysis tool, would the LOCA loading to the offsite power system. The limiting switchyard voltage that would result in analysis tool identify a actuation of plant degraded voltage protection triggers an alarm to provide indication to the TSO.

condition in which a trip of . .. 4- -, - .. - -. -I -

the NPP would result in switchyard voltages (immediate and/or long- .-. .

Attachment 1 Docket No. 50-333 JAFP-06-0057

.. . Page I of 27

.__. EE... . - I term) falling below TS nominal trip setpoint value requirements (including NPP licensees using allowable value in its TSs) and consequent actuation of plant degraded voltage protection?

If not, discuss how such a condition would be identified on the arid.

2(d) If your TSO uses an At present, the analysis tool program updates between 5 minutes and 25 minutes depending on load analysis tool, how frequently and network changes.

does the analysis tool program update?

2(e) Provide details of The CEP would trigger a notification to the JAFNPP control room for a low voltage alarm associated analysis tool-identified with the pre-defined contingency of a trip of JAFNPP and transfer of station and LOCA loading to the contingency conditions that offsite power system.

would trigger an NPP licensee notification from the TSO.

2(f) If an interface Yes. The agreement does specifically require JAFNPP notification of planned and unplanned EMS agreement exists between outages. During this period, the Low Voltage Contingency Alarm will be out of service.

the TSO and the NPP licensee, does it require that Loss of the voltage prediction tool alone has no impact on operability. If-notified by the TSO that the the NPP licensee be notified Low Voltage Contingency Alarm is inoperable, then JAFNPP procedures direct plant operators to of periods when the TSO is perform the following:

unable to determine if offsite power voltage and capacity . Contact the TSO once per shift to verify that imminent/expected degraded voltage conditions could be inadequate? do not exist If so, how does the NPP . If the TSO indicates imminent/expected degraded voltage conditions exist then an operability

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 8 of 27 S6.8IN1 m - T-M -~ E licensee determine that the determination is performed and hourly contact with the TSO is established offsite power would remain 0 Minimize large electrical load changes operable when such a 0 Return inoperable EDGs and ECCS to operable status as soon as possible notification is received? 0 Minimize maintenance and testing of the electrical distribution system Terminate maintenance or testing on critical components of the electrical distribution system as soon as possible 2(g) After an unscheduled No. There is no formal process for comparing the actual post-trip voltages to the post-trip inadvertent trip of the NPP, contingency voltage results calculated by the CEP program. However, analyses have been are the resultant switchyard performed on a case by case basis by the TSO to validate EMS predicted results.

voltages verified by procedure to be bounded by the voltages predicted by the analysis tool? 4-2(h) If an analysis tool is not Not applicable. The TSO has an analysis tool.

available to the NPP licensee's TSO, do you know if there are any plans for the TSO to obtain one?

If so, when?

2(i) If an analysis tool is not Not applicable. The TSO has an analysis tool.

available, does your TSO perform periodic studies to verify that adequate offsite power capability, including adequate NPP post-trip switchyard voltages (immediate and/or long-term), will be available to the NPP licensee over the projected timeframe of the

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 9 of 27 ge study?

11M- I M0MM" -M (a) Are the key assumptions and parameters of these Not applicable.

periodic studies translated into TSO guidance to ensure that the transmission system is operated within the bounds of the analyses?

(b) If the bounds of the analyses are exceeded, . Not applicable.

does this condition trigger the notification provisions discussed in question 1 above? 4.

20) If your TSO does not Not applicable. The TSO uses an analysis tool and the applicable contingency voltage results are use, or you do not have made available to JAFNPP.

access to the results of an analysis tool, or your TSO does not perform and make available to you periodic studies that determine the adequacy of offsite power capability, please describe why you believe you complv with the provisions of GDC 17 as stated above, or describe what compensatory actions you intend to take to ensure that the offsite power system will be sufficiently reliable and remain operable with high probability following a trip of your NPP.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page lOof 27 IS.*T-f SI .1 0S

3. .>:^r".Use'of criteria and methodologies to assess whether-the'NPP's offsite power system and safety-related'components will'.

remain operable when switchyard voltaqes are inadequate.' -' ., - . -

3(a) If the TSO notifies the Yes. If the event described actually occurs and there is an actual degradation or loss of an NPP operator that applicable offsite power source then under those circumstances JAFNPP offsite power sources would be declared inoperable.

. a trip of the NPP, or

  • the loss of the most In addition, site procedures contain guidance for operators to declare offsite power systems critical transmission inoperable and enter Technical Specification actions when notified by the TSO of post-LOCA line or contingency voltage < 112.0 kV (i.e., contingent trip of JAFNPP with LOCA) determined by the
  • the largest supply to TSO's EMS computer system. The notifications from the TSO are made in accordance with TSO the grid procedures.

would result in switchyard Other postulated contingencies on the transmission grid (e.g., loss of the most critical transmission voltages (immediate and/or line or the largest supply to the grid) are not used as a basis for functional determinations of offsite long-term) below TS nominal power.

trip setpoint value requirements (including NPP licensees using allowable value in its TSs) and would actuate plant degraded voltage protection, is the NPP offsite power system declared inoperable under the plant TSs? If not, why not?

3(b) If onsite safety-related Not applicable. Double sequencing is not part of the JAFNPP licensing basis and JAFNPP is not equipment (e.g., emergency designed or analyzed for double sequencing scenarios.

diesel generators or safety-related motors) is lost when As described in the response to Question 2, offsite sources are monitored to ensure that sufficient

Attachment 1 Docket No. 50-333 JAFP-06-0057 Ien t_______i______it_

subjected to a double

-2 !!~

S.

Page 11 of 27 voltage will be available to minimize the potential for separation from offsite power during LOCA sequencing (LOCA with sequencing. If it is determined that post-contingency voltage will not be sufficient for this case, delayed LOOP event) as a offsite power is declared inoperable. Abnormal operating procedures contain compensatory actions result of the anticipated to be implemented by JAFNPP under this condition.

system performance and is incapable of performing its safety functions as a result of responding to an emergency actuation signal during this condition, is the equipment considered inoperable? If not, why not?

3(c) Describe your As noted above, the scenario of a LOCA with delayed LOOP resulting in a double sequencing event evaluation of onsite safety- is not part of the JAFNPP licensing basis. However, in the unlikely event a LOCA should occur related equipment to when switchyard voltage is inadequate, the degraded voltage relays would separate the offsite determine whether it will source from the safety related electrical buses as designed. In the event of a postulated LOCA with operate as designed during delayed LOOP, the degraded voltage relays would sense the LOOP condition whenever it occurred the condition described in and initiate separation from the offsite source. The EDGs would start, loads would be shed from the question 3(b). busses, and safety related loads re-sequenced back on the bus. EDGs and safety related motors would continue to be capable of Derformina their safety functions durina this condition.

3(d) If the NPP licensee is No. Technical Specification action statements are not entered based on identification of grid notified by the TSO of other conditions that potentially impair offsite power. As described in the response to question 3(a),

grid conditions that may applicable TS action statements are only entered under actual grid conditions in which a contingent impair the capability or unit trip with LOCA would result in insufficient offsite voltage.

availability of offsite power, are any plant TS action statements entered? If so, please identify them.

3(e) If you believe your plant Not applicable. As described in response to question 3(a), JAFNPP procedures require plant TSs do not require you to operators to enter applicable Technical Specification action statements under actual grid conditions declare your offsite power in which a contingent unit trip with LOCA, would result in insufficient post-trip voltage. -

system or safety-related equipment inoperable in any of these circumstances,

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 12of 27 9I 28 M explain why you believe you I . -- Se -

comply with the provisions of GDC 17 and your plant TSs, or describe what compensatory actions you intend to take to ensure that the offsite power system and safety-related components will remain operable when switchyard voltages are inadequate.

3(f) Describe if and how Operator prescribed training topics include procedures governing compensatory actions in response NPP operators are trained to notifications from the TSO regarding grid conditions that impair offsite power. This includes loss and tested on the of offsite power and major grid disturbances. The method and standard of evaluation for each compensatory actions training topic is specified in the applicable lesson plan. JAFNPP operators are trained and tested on mentioned in your answers applicable plant procedures as part of operator initial and requalification training programs.

to questions 3(a) through (e).

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 13of 27 i4. _I.., . .S. -.-

- 'Use' of criteria 'and methodologies to assess whether the offsite power system will remain operable'following a'trip your I

'NPP:-P.^4f"'>-9.

'; '^-*-~ . ,f,O'L't.' +'"' v'rEt~ 2~'ronP;ea #49)i L oJ 4(a) Do the NPP operators Yes. JAFNPP operating procedures provide guidance on the impact of plant equipment due to have any guidance or degraded voltage conditions and the required operator actions. Plant procedures also address procedures in plant TS control and monitoring of the main generator output and voltage regulator to support plant and grid bases sections, the final conditions. JAFNPP does not have auto tap changing transformers, capacitors, and static VAR safety analysis report, or compensators. Furthermore, Technical Specification Bases and the UFSAR provide relevant plant procedures regarding information and the operators are trained (classroom and simulator) and tested on applicable situations in which the procedures as part of their initial and requalification training programs. The method and standard of condition of plant-controlled evaluation for each training topic is specified in the applicable lesson plan.

or -monitored equipment (e.g., voltage regulators, auto tap changing transformers, capacitors, static VAR compensators, main generator voltage regulators) can adversely affect the operability of the NPP offsite power system?

If so, describe how the operators are trained and tested on the guidance and procedures.

4(b) If your TS bases Not applicable. Procedures are in use as noted in item 4(a).

sections, the final safety analysis report, and plant procedures do not provide guidance regarding situations in which the condition of plant-controlled -

or -monitored equipment can adversely affect the operability of the NPP offsite

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 14 of 27 E ,.,,;

e l -_

power system, explain why you believe you comply with the provisions of GDC 17 and the plant TSs, or describe what actions you intend to take to provide such guidance or procedures.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 15of 27 gw=! mr2 . -- l l -

Use of NPP licensee/TSO protocols and analysis tool by TSOs to assist NPP licensees in monitoring grid conditions for consideration in maintenance risk assessments The Maintenance Rule (10 CFR 50.65(a)(4)) requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities before performing them.

5. '.-- '-Performance of grid reliability evaluations as part'of the'maintenance risk'assessments required by 10 CFR 50.65(a)(4).'-':-

5(a) Is a quantitative or Yes. JAFNPP performs qualitative risks assessment as required by 10 CFR 50.65 and JAFNPP qualitative grid reliability Plant Technical Specification. The program is implemented by JAFNPP On-Line Risk Assessment evaluation performed at your and Outage Risk Assessment procedures. These procedures require plant risk assessment before NPP as.part of the removing equipment from service for planned maintenance activities, or upon discovery of maintenance risk equipment out of service that is unplanned. The JAFNPP On-Line Risk Assessment procedure assessment required by 10 requires an evaluation of current and anticipated grid conditions before removing risk significant CFR 50.65(a)(4) before equipment from service. The Equipment Out of Service (EOOS) Monitor is a computer based performing grid-risk-sensitive program that is used to calculate Core Damage Frequency and conditional Core Damage Frequency maintenance activities? This for the plant equipment configuration and testing activities for both planned and unplanned includes surveillances, post- configurations. The JAFNPP Work Management procedure requires a risk plan development for maintenance testing, and activities that would increase grid instability in combination with external events.

preventive and corrective maintenance that could increase the probability of a plant trip or LOOP or impact LOOP or SBO coping capability, for example, before taking a risk-significant piece of equipment (such as an EDG, a battery, a steam-driven pump, an alternate AC power source) out-of-service?

5(b) Is grid status monitored Yes. 345kV and 115kV grid status is continuously monitored by the TSOs. Changing conditions are by some means for the communicated to the JAFNPP by the TSOs in accordance with the-existing formal agreements and duration of the grid-risk- protocols. Notification occurs whether or not maintenance is on-going. The TSOs are required to

Attachment 1 Docket No. 50-333 JAFP-06-0057 MMZMM MIPage 16 of 27 sensitive maintenance to notify JAFNPP whenever an impaired or potentially degraded grid condition is recognized by the confirm the continued TSOs.

validity of the risk assessment and is risk Emergent conditions (i.e., significant changes to conditions assumed in the original risk assessment) reassessed when could change the results of a previously performed assessment. Examples include plant warranted? If not, how is the configuration or mode changes, additional structures, systems and components (SSCs) out of risk assessed during grid- service due to failures, or significant changes in external conditions (weather or offsite power risk-sensitive maintenance? availability).

When identified, the risk assessment is re-evaluated to address these changes in plant conditions on a reasonable schedule commensurate with the safety significance of the condition. Based on the results of the assessment, ongoing or planned maintenance activities may need to be suspended or rescheduled, and SSCs may need to be returned to service.

5(c) Is there a significant Yes, the NYISO Reliability Coordinator Area is a summer peaking area. Due to high intra-area and variation in the stress on the inter-area power flows, it would be expected that the grid would be stressed. However, this stress is grid in the vicinity of your managed through facility maintenance coordination. During the summer peak season, transmission NPP site caused by facility maintenance is avoided in June, July and August if possible. Anytime that maintenance is scheduled, the schedules are managed in order to maintain operation of the bulk power system seasonal loads within established operating criteria.

or Yes. Electric Power Research Institute (EPRI) TR-101 1759, dated December 2005, indicates there is a statistically significant seasonal-regional variation in recorded LOOP events from 1997 to 2004.

maintenance activities The data shows a comparatively higher probability of a LOOP occurring in the summer months in the associated with critical NPCC region. This correlates with recent NRC publications (e.g., NUREG/CR-6890 and NRC transmission elements? Information Notice 2006-06).

Is there a seasonal variation Seasonal weighted values of grid-centered events for the JAFNPP region from.Table 4-6 of EPRI (or the potential for a TR-1 011759 are as follows:

seasonal variation) in the LOOP frequency in the local Spring 0.75 transmission region? Summer 4.0 Fall -

If the answer to either Winter 1.25

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 17of 27 N s1111.8gs question is yes, discuss the I . -- S. -

time of year when the variations occur and their magnitude. 4.

5(d) Are known time-related No. Time-related variations in LOOP probability are currently not quantitatively evaluated at variations in the probability JAFNPP. For 10CFR50.65 (a)(4) workweek evaluations for activities which may impact availability of a LOOP at your plant site of the 115kV transmission lines or mitigating systems, JAFNPP uses a single yearly-averaged considered in the grid-risk- initiating event frequency for the LOOP. However, since maintenance is performed throughout the sensitive maintenance year on LOOP-sensitive components (such as EDGs, ESW, etc.), procedural consideration of "high evaluation? If not, what is risk" periods (severe weather, grid disturbances, transmission line maintenance, etc.) is applied as your basis for not described in the answer to question 5(a). Based on this, the averaged initiating event frequency is considering them? currently judged to be adequate and changes to this approach will be considered as further information becomes available.

5(e) Do you have contacts Yes. TSO communication contacts are implemented per procedure for assessment of grid with the TSO to determine conditions before performing grid-risk sensitive maintenance activities.

current and anticipated grid conditions as part of the grid reliability evaluation performed before conducting grid-risk-sensitive maintenance activities?

5(f) Describe any formal Notification occurs whether or not maintenance is on-going. The TSOs are required to notify agreement or protocol that JAFNPP whenever an impaired or potentially degraded grid condition is recognized by the TSOs.

you have with your TSO to Specific examples of known potentially degrading conditions identified in the agreement include:

assure that you are promptly alerted to a worsening grid . De-energizing, switching or in-service work on transmission lines associated with JAFNPP condition that may emerge

  • Potentially damaging inclement weather -

during a maintenance . Solar Magnetic Disturbances activity.

  • Post-contingency voltage alarm for the 115kV offsite power system
  • Special system operating configurations The occurrence of emergency events or conditions that threaten the 115kV or 345kV grid stability or

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 18of 27 aL I W M reliability requires notification to JAFNPP as soon as possible. De-energizing, switching or beginning in-service work on transmission lines associated with JAFNPP requires prior notification to JAFNPP.

5(g) Do you contact your Yes. The TSOs are contacted before the start of grid-risk sensitive maintenance activities and at the TSO periodicallv for the completion of the activity. Changes to grid conditions are communicated to JAFNPP as stated in duration of the arid-risk- question 5(f) above. During ongoing EDG or 115kV transmission line maintenance, JAFNPP sensitive maintenance contacts the TSO every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

activities?

5(h) If you have a formal Training on integrated risk management, on-line work activities and shutdown safety is mandated in agreement or protocol with the operators' initial training program and is periodically addressed in the operator requalification your TSO, describe how program.

NPP operators and maintenance personnel are The method and standard of evaluation for each training topic is specified in the applicable lesson trained and tested on this plan.

formal agreement or protocol.

5(i) If your grid reliability Not applicable. JAFNPP relies on a proceduralized communication protocol and performs the evaluation, performed as required evaluations in accordance with 10CFR 50.65(a)(4).

part of the maintenance risk assessment required by 10 CFR 50.65(a)(4), does not consider or rely on some arrangement for communication with the TSO, explain why you believe you comply with 10 CFR 50.65(a)(4).

5(j) If risk is not assessed Not applicable. Risk is assessed based on continuing communications with the TSO.

(when warranted) based on continuing communication

Attachment 1

- - Docket No. 50-333 JAFP-06-0057 Page 19 of 27 Ei LI M s I0i ;l2II1 1 1 iREl1 _ 1 1I I£ I with the TSO throughout the duration of grid-risk-sensitive maintenance activities, explain why you believe you have effectively implemented the relevant provisions of the endorsed industry guidance associated with the maintenance rule.

5(k) With respect to Not applicable. No alternative actions required.

questions 5(i) and 50), you may, as an alternative, describe what actions you intend to take to ensure that the increase in risk that may result from proposed grid-risk-sensitive activities is assessed before and during grid-risk-sensitive maintenance activities, respectively.

.. . .- : , , -.--Z.. , - - -' -' - '. . . .'

Attachment 1

- - Docket No. 50-333 JAFP-06-0057 Page 20 of 27 rNII 0 . a 1YM -E -- M - -

6;- Use of risk assessment results, including the-results of arid reliability evaluations,' in managing maintenance'nisk,' as re uired by 10 CFR 50.65(a)(4).:'4  :-i - - -- ;  ; -  :

6(a) Does the TSO Yes. The TSOs coordinate with JAFNPP on transmission system maintenance activities that can coordinate transmission have an impact on station operation. Both JAFNPP and TSO procedures have processes to system maintenance address coordinating transmission system maintenance activities. The process requires advanced activities that can have an notice and subsequent mutual agreement for planned outages to ensure grid reliability is impact on the NPP operation maintained. Once equipment is switched out of service, grid status is monitored by the TSOs.

with the NPP operator?

6(b) Doqyou coordinate NPP Yes. Work activities on the 115/345 kV systems that have the potential to affect the operation of maintenance activities that JAFNPP as identified in site procedures are coordinated with the TSO by JAFNPP. Other can have an impact on the maintenance activities that can potentially impact the transmission system (e.g., voltage regulator transmission system with the maintenance), are also coordinated with the TSO. Site procedures require notification to the TSO TSO? for inoperability or maintenance associated with offsite power systems.

6(c) Do you consider and Yes. JAFNPP plans and schedules grid-risk-sensitive maintenance activities taking into implement, if warranted, the consideration grid conditions. Emergent issues with the grid are managed to maintain a high level rescheduling of grid-risk- of plant safety. At times, appropriate management means rescheduling activities. At other times, sensitive maintenance this may involve backing out of the task and restoring the safety-related function of the equipment.

activities (activities that could (i) increase the likelihood of a plant trip, (ii) increase LOOP probability, or (iii) reduce LOOP or SBO coping capability) under existing, imminent, or worsening degraded grid reliability conditions?

6(d) If there is an overriding Yes. The JAFNPP Protected Equipment Program governs the alternate equipment that is need to perform grid-risk- protected when grid-risk-sensitive maintenance is in progress. The risk assessment procedure sensitive maintenance requires minimizing activities that have the potential to result in a plant transient when the risk level activities under existing or is identified that warrants this action.' Additional actions such as preplanning to minimize the time of imminent conditions of impairment, additional staffing and verifying alternate equipment status are included.

degraded grid reliability, or continue grid-risk-sensitive

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 21 of 27

.: s. em - ., I l l0 l II I, maintenance when grid conditions worsen, do you implement appropriate risk management actions? If so, describe the actions that you would take. (These actions could include alternate equipment protection and compensatory measures to limit or minimize risk.)

6(e) Describe the actions JAFNPP has procedures for evaluating the risk for all maintenance, including grid risk-sensitive associated with questions maintenance activities, control of on-line maintenance activities and shutdown safety for offline 6(a) through 6(d) above that activities. Accomplishment of grid reliability evaluations is assured through the use of procedures.

would be taken, state Communication and coordination with the TSO is contained in JAFNPP procedures. Rescheduling whether each action is grid sensitive maintenance under existing, imminent or degraded grid conditions is part of the risk governed by documented assessment process and the coordination protocol.

procedures and identify the procedures, and explain why these actions are effective and will be consistently accomplished.

6(f) Describe how NPP Maintenance personnel are task qualified by their respective training programs to perform operators and maintenance maintenance activities associated with offsite power distribution. The training ranges from basic personnel are trained and electrical safety practices to preventive and corrective maintenance on selected switchyard tested to assure they can components. Applicable supervisors receive initial and, if necessary, continuing training on the use accomplish the actions of the procedures described in 6(e).

described in your answers to question 6(e). Operations personnel receive initial and, if necessary, continuing training on the use of the procedures described in 6(e) above. This is mandated in the operators' initial and requalification training programs.

6(g) If there is no effective Not applicable. JAFNPP has implemented effective coordination with the TSOs regarding coordination between the transmission system maintenance and risk significant plant maintenance.

NPP operator and the TSO regarding transmission

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 22 of 27 1115M-11a.fl M TMI 0SMM TI-system maintenance or NPP maintenance activities, please explain why you believe you comply with the provisions of 10 CFR 50.65(a)(4).

6(h) If you do not consider Not applicable. As discussed in questions 6(a) through 6(d), JAFNPP has established the and effectively implement necessary administrative controls to ensure appropriate risk management actions are effectively appropriate risk implemented.

management actions during the conditions described above, explain why you believe you effectively-addressed the relevant provisions of the associated NRC-endorsed industry guidance.

6(i) You may, as an Not applicable. No alternative actions are required.

alternative to questions 6(g) and 6(h) describe what actions you intend to take to ensure that the increase in risk that may result from grid-risk-sensitive maintenance activities is managed in accordance with 10 CFR 50.65(a)(4).

Attachment 1

' Docket No. 50-333 JAFP-06-0057 Page 23 of 27 S1I-1TI.'s IS *-SI R -

Offsite power restoration procedures in accordance with 10 CFR 50.63 as developed in Section 2 of RG 1.155 Pursuant to 10 CFR 50.63, the NRC requires that each NPP licensed to operate be able to withstand an SBO for a specified duration and recover from the SBO. NRC RG 1.155 gives licensees guidance on developing their approaches for complying with 10 CFR 50.63.

7. Procedures for identifying local power sources1 that'could be made available to resupply your plant following 'a LOOP event.",

v v_ i .a. .

Grid under-voltage Grider and ccolase lapse, 7- . .

Weather-induced pwer loss -<.

'--Preferre'd power distribution system faults'that could result in the loss of normal powertto essential switch ear buses 7(a) Briefly describe any JAFNPP has no agreement with the TSOs to identify local power sources. The NYISO and the agreement made with the TSOs have restoration plans which identify how power will be restored to the NPPs as a priority TSO to identify local power load. The TSOs are responsible for coordinating the restoration of offsite power to the NPP. The sources that could be made NPP is considered a critical facility and restoration of power is a priority. TSO procedures require available to re-supply power that, if a black start situation occurs, the TSOs will prioritize restoration of power to the NPPs.

to your, plant following a LOOP event. Since there is no way to predict the extent and characteristics of a specific blackout, the TSOs will utilize the best sources available for specific events to restore offsite power and to determine the specific power sources and paths. The TSOs have many options available to restore offsite power and would not be limited to identified local power sources.

NYISO operating procedures govern prompt restoration of loads within the NYISO control area.

While specific generation sources are not defined, priority is given to restoring offsite power to I

This includes items such as nearby or onsite gas turbine generators, portable generators, hydro generators, and black-start fossil power plants.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 24 of 27 E I. IS INPPs once the power system is re-energized.

I 7(b) Are your NPP operators Yes. In order to properly respond when offsite power sources are restored as described in the trained and tested on response to question 7(a), operators receive classroom, practical and simulator training in the identifying and using local areas of partial LOOP, complete LOOP, grid instabilities, and station blackout. The method and power sources to resupply standard of evaluation for each training topic is specified in the applicable lesson plan.

your plant following a LOOP event? If so, describe how.

7(c) If you have not Not applicable. The NYISO has agreements with area black start capable units in accordance with established an agreement the NYISO bulk power restoration plan. The NYISO restoration plan identifies restoring power to with your plant's TSO to the NPPs as a priority, and the TSOs are responsible for coordinating the restoration of offsite identify local power sources power to the NPP. The NPP is considered a critical facility and thus restoration of power is a that could be made available priority.

to resupply power to your plant following a LOOP event, explain why you believe you comply with the provisions of 10 CFR 50.63, or describe what actions you intend to take to establish compliance.

.. '. r- -;,-, 1,-

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 25 of 27 Iel y t!! M .pa a; . - - - -.

Losses of offsite power caused by grid failures at a frequency of equal to or greater than once in 20 site-years in accordance with Table 4 of Regulatory Guide 1.155 for complying with 10 CFR 50.63 Pursuant to 10 CFR 50.63, the NRC requires that each NPP licensed to operate be able to withstand an SBO for a specified duration and recover from the SBO. NRC RG 1.155 gives licensees guidance on developing their approaches for complying with 10 CFR 50.63.

8. Maintaining SBO copingcapabilities in accordance with 10 CFR 50.63 -- - - -

8(a) Has your NPP Yes. In 1991, the initial coping duration for the JAFNPP was determined. Since that time, JAFNPP experienced a total LOOP has experienced one grid related LOOP event, which occurred on August 14, 2003 (i.e., Northeast caused by grid failure since Blackout).

the plant's coping duration.

was initially determined under 10 CFR 50.63?

8(b) If so, have you Yes. JAFNPP was reevaluated using the guidance in Table 4 of RG 1.155 and based on this reevaluated the NPP using reevaluation, no changes were warranted.

the guidance in Table 4 of RG 1.155 to determine if your NPP should be assigned to the P3 offsite power design characteristic group?

8(c) If so, what were the The results of the reevaluation concluded that JAFNPP remains assigned to the P2 offsite power results of this reevaluation, characteristic group and the SBO duration capability remains at four (4) hours.

and did the initially determined coping duration for the NPP need to be adjusted?

8(d) If your NPP has Not applicable. The reevaluation has been completed and JAFNPP has determined that it is in experienced a total LOOP compliance with 10 CFR 50.63.

caused by grid failure since the plant's coping duration was initially determined under 10 CFR 50.63 and

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 26 of 27 is I.s. M E .I has not been reevaluated using the guidance in Table 4 of RG 1.155, explain why you believe you comply with the provisions of 10 CFR 50.63 as stated above, or describe what actions you intend to take to ensure that the NPP maintains its SBO coping capabilities in accordance with 10 CFR 50.63.

-' -A' - - ~ , -~

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 27 of 27 KI Is.,,If TI. rz0 - IT Actions to ensure compliance

'9;' If youdetermine that any:action is warranted to'bring your NPP into'compliance',with NRC'regulatory requirements including TSs,

'GDC.7, 10 CFR 50.65(a)(4),10 CFR 50.63, 10 CFR 55.59 or,10 CFR 50.120,'describe the schedule"orimplementihgit.  ;;

Based on applicable NRC SERs, JAFNPP is in compliance with TSs, GDC 17, 10 CFR 50.65(a)(4), 10 CFR 50.63,10 CFR 55.59, and 10 CFR 50.120. Accordingly, no additional actions are warranted

.1

Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP RO. Box 110 Ente(,g1y

_7__.

ULycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan March 30, 2006 Site Vice President - JAF JAFP-06-0057 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 1555 Rockville Pike Rockville, Maryland 20852

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power

References:

1. NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006

Dear Sir or Madam:

The NRC issued Generic Letter 2006-02 (Reference 1) to request information for determining compliance with regulatory requirements governing electric power sources.

Specifically, the NRC is requesting information regarding (1) use of protocols between the nuclear power plant (NPP) and the transmission system operator (TSO),

independent system operator (ISO), or reliability coordinator/authority (RCIRA) including transmission load flow analysis tools (analysis tools) by TSOs to assist NPPs in monitoring grid conditions to determine the operability of offsite power systems under plant Technical Specification (TS); (2) use of NPP/TSO protocols and analysis tools by TSOs to assist NPPs in monitoring grid conditions for consideration in maintenance risk assessments; (3) offsite power restoration procedures in accordance with Section 2 of NRC Regulatory Guide (RG) 1.155, "Station Blackout;" and, (4) losses of offsite power caused by grid failures at a frequency equal to or greater than once in 20 site-years in accordance with RG 1.155. The requested information is being provided under the requirements of 10 CFR 50.54(f.

Attachment 1 to this letter provides the James A. FitzPatrick Nuclear Power Plant (JAFNPP) response to Generic Letter 2006-02. Generic Letter 2006-02 discusses compliance with General Design Criterion (GDC) 17 in several locations. The exact extent of compliance of JAFNPP to the GDC is described in JAFNPP's Updated Final Safety Analysis Report.

Some of the questions in Generic Letter 2006-02 seek information, procedures and activities concerning grid reliability for which JAFNPP does not have first-hand knowledge. JAFNPP has not independently verified all information provided by:

  • National Grid USA

There are no commitments contained in this letter. If you should have any questions, please contact Jim Costedio, Regulatory Compliance Manager, at (315) 349-6358. I declare under penalty of perjury that the foregoing is true and correct.

Executed on Ma 30 , 2006.

Very truly yours, T.

TS:RP:dmr

Attachment:

As stated cc:

Regional Administrator, Region 1 Resident Inspector's Office U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road James A. FitzPatrick Nuclear Power lant King of Prussia, PA 19406-1415 PO Box 136 Lycoming, NY 13093 Mr. John Boska, Project Manager Mr. Paul Eddy Plant Licensing Branch 1-1 New York State Dept. of Public Service Division of Operating Reactor Licensing 3 Empire State Plaza Office of Nuclear Reactor Regulation Albany, NY 12223-1350 U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Mr. Peter R. Smith, President New York State Energy, Research,

& Development Authority 17 Columbia Circle Albany, NY 12203-6399

Attachment I James A. FitzPatrick Nuclear Power Plant Response to NRC Generic Letter 2006-002 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 1 of 27 1.Use of protocols between the NPP licensee and the vTSOISO, or- RCIRA to assist the NPP licenseejin monitoringgrid conditions ';

to determine the orerabilitv of offsite power systems under plant Technicaal Se6cifications. -- nt t . - I. I I ' .' '. - '

1(a) Do you have a formal Yes. Formal communications protocols have been established between JAFNPP and the New York agreement or protocol with Independent System Operator (NYISO) and the Transmission Owners (TO). JAFNPP has a number your TSO? of formal agreements with the NYISO and TOs as follows:

  • Interconnection Agreement with the New York Power Authority (NYPA) for the 345kV power transmission system

. New York State Transmission Tariffs with NYISO

. NYISO Customer & Guest Application Form of Service Agreement for NYISO Market Administration and Control Area Service Tariff

. Operating Coordination Agreement with National Grid (NG) (previously known as Niagara Mohawk Power Corporation), and NYPA

. Electric Service Agreement with National Grid for the 115kV offsite power transmission system

  • Agreement for Contingency Alarm Services with National Grid for the 115kV offsite power transmission system In the New York Reliability Coordinator Area, the NYISO has operational authority over the bulk power system. The TOs have operational authority over the non-bulk power system. The NYISO and TSOs operate the New York electric transmission system in accordance with the North American Electric Reliability Council (NERC), Northeast Power Coordinating Council (NPCC) and New York State Reliability Council (NYSRC) criteria. Established communications protocols exist between the NYISO and the TOs. Communications to the generating resources are through the TOs, which perform the TSO function. The associated TSOs monitor the localized grid conditions and coordinate issues such as off site power operability with JAFNPP.

1(b) Describe any grid The TSOs (NG and NYPA) are required to notify JAFNPP whenever an impairment or potentially conditions that would trigger degraded grid condition is recognized by the TSOs. The TSOs have the following information in a notification from the TSO their notification procedures:

to the NPP licensee and if there is a time period . National Grid should notify the JAFNPP immediately if emergency events or conditions required for the notification. threaten 115 kV or 345 kV grid stability or reliability. JAFNPP requests notification to reduce

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 2 of 27 e,t! . I-S .! -iv.:

the risk of a unit trip. Notification should also be made when conditions no longer exist

  • National Grid should notify the JAFNPP approximately 15 minutes prior to de-energizing, switching, or beginning in-service work on 115kV transmission lines associated with JAFNPP
  • NYPA should notify the JAFNPP prior to de-energizing, switching, or beginning in-service work on 345kV transmission lines associated with JAFNPP
  • National Grid should notify the JAFNPP of potentially damaging inclement weather or solar magnetic disturbances that may impact the security of the Oswego complex (i.e.,

transmission system in the area of JAFNPP). Notification times are specified within NG procedures. However, good utility practice would require a prompt notification, commensurate with the duty burden of the system security operator during the time of the event.

  • NYPA should notify the JAFNPP of ordered power reductions in generation for system security.
  • Notifications for post-LOCA contingency low voltage alarm should be performed in accordance with NG procedures. Notification time is made following a verification of the alarm, via a second contingency load flow analysis, generated by the Energy Management System (EMS) computer system.

These notification guidelines are specified in National Grid and NYPA procedures.

1(c) Describe any arid JAFNPP has procedures that require notification and communication with the ISO and/or TSOs for conditions that would cause changes in the following grid conditions:

the NPP licensee to contact the TSO. . Plant start-up, plant shutdown and plant power changes

. Every shift, prior to turnover, JAF contacts the TSO to verify status of the 115kV and 345kV Describe the procedures transmission lines associated with such a

  • Modifications resulting in changes to generator electrical characteristics, post-trip off-site voltage communication. If you do criteria, or changes in JAFNPP post trip station or accident loading not have procedures, . If 115kV line voltage is outside the 116kV to 122kV normal operating range describe how you assess . If 345kV line voltage is outside the 345kV to 368kV normal operating range grid conditions that may . Method of voltage control, (i.e., automatic or manual) cause the NPP licensee to . Planned maintenance activities such as switchyard work, Emergency Diesel Generator (EDG) contact the TSO. maintenance or relay testing associated with the offsite power sources

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 3 of 27 e, S  !! _g £ -'iEW

  • Emergent work associated with the offsite power systems
  • Entry into an unplanned LCO associated with 115kV offsite power
  • Every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> if an off-site circuit is inoperable
  • Every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> if an EDG subsystem is inoperable
  • Any plant condition that may threaten continued plant operation or possible plant power change
  • Any grid digital transient recorder alarm not due to station relaying on either the 115kV or 345kV system
  • Severe weather conditions, unit trips, unusual grid loading and equipment failures that may affect grid stability
  • Degraded breaker air pressure or high SF6 gas differential pressure for breaker
  • Loss of 13.2 kV supply to the site
  • Loss of offsite power or loss of offsite power is imminent 4.

1(d) Describe how NPP Licensed operators are provided training (classroom and simulator) and are tested on grid operators are trained and conditions. Training topics include but are not limited to:

tested on the use of the . Electrical distribution systems procedures or . Operating Procedures for 11 5kV and 345kV systems assessing grid conditions in

  • Notification of the ISO and/or TSO of changing conditions question 1(c). . Abnormal Operating Procedures (which includes loss of offsite power and major grid disturbances)

. Selected Significant Operating Event Report recommendations, which include SOER 99-01, Loss of Grid

. Emergency conditions Examination criterion for each of the above topics is specified in the applicable program lesson plan.

1(e) Ifyou do not have a Not applicable. Formal agreements exist.

formal agreement or protocol with your TSO, describe why you believe you continue to comply with the provisions of ,

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page4of 27 IGDC 17 as stated above, or I S A -

describe what actions you intend to take to assure compliance with GDC 17. -I 1(f) If you have an existing As previously stated, JAFNPP does have a formal agreement with the TSO that addresses formal interconnection communication and coordination between JAFNPP and the TSO.

agreement or protocol that ensures adequate Notifications for post-LOCA contingency low voltage alarm are performed in accordance with TSO communication and procedures. Notification is made following a verification of the alarm. The verification is determined coordination between the via contingency load flow analyses that are generated by the TSO using the EMS computer system.

NPP licensee and the TSO, describe whether this agreement or protocol requires that you be promptly notified when the conditions of the surrounding grid could result in degraded voltage (i.e., below TS nominal trip setpoint value requirements; including NPP licensees using allowable value in its TSs).

or LOOP after a trip of the _-

reactor unit(s).

1(g) Describe the low JAFNPP switchyard voltage was analyzed for worst case reserve station service transformer loading switchyard voltage conditions, which is the unit trip with LOCA scenario. The minimum required 115 kV switchyard conditions that would initiate voltage is based on maintaining emergency bus voltage above the reset point of the second level operation of plant degraded voltage protection relays (degraded voltage relay reset is approximately 3920 VAC) during the unit voltage protection. trip with LOCA scenario. This requires switchyard voltage to remain at or above 112.0 kV. If switchyard voltage falls below this level, and 4 kV emergency bus voltage reaches the degraded voltage relay dropout setpoint of 3871 +/- 28V for a maximum of 9.5 seconds with LOCA or a

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 5 of 27 SI. S . i i_' -. -t l11 Il~uile sg maximum of 46.6 seconds without LOCA, the emergency switchgear is transferred to the on-site EDGs. As the JAFNPP unit trip with LOCA provides the greatest reserve station service transformer loading, the minimum acceptable switchyard voltage is based on this analyzed scenario.

. , . .. . .- .. I- .

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 6 of 27 we] s.,T- m . -- S.m -----

- '-Use-of criteria and methodologies to assess whether-the-offsite power system-will'become iperable asa'result of a trip o 2(a) Does your NPP's TSO Yes. National Grid (TSO) maintains an Energy Management System (EMS) and associated security use any analysis tools, an model. The EMS is a system of computer-aided tools used by system operators to monitor and online analytical control the performance of the transmission system. The TSO also maintains a security model that transmission system studies includes a State Estimator (SE) and a Contingency Evaluation Program (CEP). The CEP solves program, or other equivalent pre-defined contingencies on the electric system, including a trip of JAFNPP and transfer of station predictive methods to and LOCA loading to the offsite power system. If the JAFNPP 115kV system post-trip low voltage determine the grid conditions contingency limit is exceeded, an alarm is generated and the JAFNPP control room is notified.

that would make the NPP offsite power system The program creates a real-time network model starting with bus/branch connectivity, branch inoperable during various impedances and ratings, and steady state generator models. The program then superimposes real-contingencies? time switch and breaker status to determine network topology. Real-time generation and bus loads If available to you, please are applied to this model.

provide a brief description of the analysis tool that is used by the TSO. +

2(b) Does your NPP's TSO Yes. The TSO notifies the JAFNPP control room operator of a post-trip low voltage contingency use an analysis tool as the alarm determined by the TSO's CEP computer system. The notifications from the TSO are made in basis for notifying the NPP accordance with National Grid procedures.

licensee when such a condition is identified? If not, how does the TSO determine if conditions on the grid warrant NPP licensee notification?

2(c) If your TSO uses an Yes. The CEP solves the pre-defined contingency of a trip of JAFNPP and transfer of station and analysis tool, would the LOCA loading to the offsite power system. The limiting switchyard voltage that would result in analysis tool identify a actuation of plant degraded voltage protection triggers an alarm to provide indication to the TSO.

condition in which a trip of . .. 4- -, - .. - -. -I -

the NPP would result in switchyard voltages (immediate and/or long- .-. .

Attachment 1 Docket No. 50-333 JAFP-06-0057

.. . Page I of 27

.__. EE... . - I term) falling below TS nominal trip setpoint value requirements (including NPP licensees using allowable value in its TSs) and consequent actuation of plant degraded voltage protection?

If not, discuss how such a condition would be identified on the arid.

2(d) If your TSO uses an At present, the analysis tool program updates between 5 minutes and 25 minutes depending on load analysis tool, how frequently and network changes.

does the analysis tool program update?

2(e) Provide details of The CEP would trigger a notification to the JAFNPP control room for a low voltage alarm associated analysis tool-identified with the pre-defined contingency of a trip of JAFNPP and transfer of station and LOCA loading to the contingency conditions that offsite power system.

would trigger an NPP licensee notification from the TSO.

2(f) If an interface Yes. The agreement does specifically require JAFNPP notification of planned and unplanned EMS agreement exists between outages. During this period, the Low Voltage Contingency Alarm will be out of service.

the TSO and the NPP licensee, does it require that Loss of the voltage prediction tool alone has no impact on operability. If-notified by the TSO that the the NPP licensee be notified Low Voltage Contingency Alarm is inoperable, then JAFNPP procedures direct plant operators to of periods when the TSO is perform the following:

unable to determine if offsite power voltage and capacity . Contact the TSO once per shift to verify that imminent/expected degraded voltage conditions could be inadequate? do not exist If so, how does the NPP . If the TSO indicates imminent/expected degraded voltage conditions exist then an operability

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 8 of 27 S6.8IN1 m - T-M -~ E licensee determine that the determination is performed and hourly contact with the TSO is established offsite power would remain 0 Minimize large electrical load changes operable when such a 0 Return inoperable EDGs and ECCS to operable status as soon as possible notification is received? 0 Minimize maintenance and testing of the electrical distribution system Terminate maintenance or testing on critical components of the electrical distribution system as soon as possible 2(g) After an unscheduled No. There is no formal process for comparing the actual post-trip voltages to the post-trip inadvertent trip of the NPP, contingency voltage results calculated by the CEP program. However, analyses have been are the resultant switchyard performed on a case by case basis by the TSO to validate EMS predicted results.

voltages verified by procedure to be bounded by the voltages predicted by the analysis tool? 4-2(h) If an analysis tool is not Not applicable. The TSO has an analysis tool.

available to the NPP licensee's TSO, do you know if there are any plans for the TSO to obtain one?

If so, when?

2(i) If an analysis tool is not Not applicable. The TSO has an analysis tool.

available, does your TSO perform periodic studies to verify that adequate offsite power capability, including adequate NPP post-trip switchyard voltages (immediate and/or long-term), will be available to the NPP licensee over the projected timeframe of the

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 9 of 27 ge study?

11M- I M0MM" -M (a) Are the key assumptions and parameters of these Not applicable.

periodic studies translated into TSO guidance to ensure that the transmission system is operated within the bounds of the analyses?

(b) If the bounds of the analyses are exceeded, . Not applicable.

does this condition trigger the notification provisions discussed in question 1 above? 4.

20) If your TSO does not Not applicable. The TSO uses an analysis tool and the applicable contingency voltage results are use, or you do not have made available to JAFNPP.

access to the results of an analysis tool, or your TSO does not perform and make available to you periodic studies that determine the adequacy of offsite power capability, please describe why you believe you complv with the provisions of GDC 17 as stated above, or describe what compensatory actions you intend to take to ensure that the offsite power system will be sufficiently reliable and remain operable with high probability following a trip of your NPP.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page lOof 27 IS.*T-f SI .1 0S

3. .>:^r".Use'of criteria and methodologies to assess whether-the'NPP's offsite power system and safety-related'components will'.

remain operable when switchyard voltaqes are inadequate.' -' ., - . -

3(a) If the TSO notifies the Yes. If the event described actually occurs and there is an actual degradation or loss of an NPP operator that applicable offsite power source then under those circumstances JAFNPP offsite power sources would be declared inoperable.

. a trip of the NPP, or

  • the loss of the most In addition, site procedures contain guidance for operators to declare offsite power systems critical transmission inoperable and enter Technical Specification actions when notified by the TSO of post-LOCA line or contingency voltage < 112.0 kV (i.e., contingent trip of JAFNPP with LOCA) determined by the
  • the largest supply to TSO's EMS computer system. The notifications from the TSO are made in accordance with TSO the grid procedures.

would result in switchyard Other postulated contingencies on the transmission grid (e.g., loss of the most critical transmission voltages (immediate and/or line or the largest supply to the grid) are not used as a basis for functional determinations of offsite long-term) below TS nominal power.

trip setpoint value requirements (including NPP licensees using allowable value in its TSs) and would actuate plant degraded voltage protection, is the NPP offsite power system declared inoperable under the plant TSs? If not, why not?

3(b) If onsite safety-related Not applicable. Double sequencing is not part of the JAFNPP licensing basis and JAFNPP is not equipment (e.g., emergency designed or analyzed for double sequencing scenarios.

diesel generators or safety-related motors) is lost when As described in the response to Question 2, offsite sources are monitored to ensure that sufficient

Attachment 1 Docket No. 50-333 JAFP-06-0057 Ien t_______i______it_

subjected to a double

-2 !!~

S.

Page 11 of 27 voltage will be available to minimize the potential for separation from offsite power during LOCA sequencing (LOCA with sequencing. If it is determined that post-contingency voltage will not be sufficient for this case, delayed LOOP event) as a offsite power is declared inoperable. Abnormal operating procedures contain compensatory actions result of the anticipated to be implemented by JAFNPP under this condition.

system performance and is incapable of performing its safety functions as a result of responding to an emergency actuation signal during this condition, is the equipment considered inoperable? If not, why not?

3(c) Describe your As noted above, the scenario of a LOCA with delayed LOOP resulting in a double sequencing event evaluation of onsite safety- is not part of the JAFNPP licensing basis. However, in the unlikely event a LOCA should occur related equipment to when switchyard voltage is inadequate, the degraded voltage relays would separate the offsite determine whether it will source from the safety related electrical buses as designed. In the event of a postulated LOCA with operate as designed during delayed LOOP, the degraded voltage relays would sense the LOOP condition whenever it occurred the condition described in and initiate separation from the offsite source. The EDGs would start, loads would be shed from the question 3(b). busses, and safety related loads re-sequenced back on the bus. EDGs and safety related motors would continue to be capable of Derformina their safety functions durina this condition.

3(d) If the NPP licensee is No. Technical Specification action statements are not entered based on identification of grid notified by the TSO of other conditions that potentially impair offsite power. As described in the response to question 3(a),

grid conditions that may applicable TS action statements are only entered under actual grid conditions in which a contingent impair the capability or unit trip with LOCA would result in insufficient offsite voltage.

availability of offsite power, are any plant TS action statements entered? If so, please identify them.

3(e) If you believe your plant Not applicable. As described in response to question 3(a), JAFNPP procedures require plant TSs do not require you to operators to enter applicable Technical Specification action statements under actual grid conditions declare your offsite power in which a contingent unit trip with LOCA, would result in insufficient post-trip voltage. -

system or safety-related equipment inoperable in any of these circumstances,

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 12of 27 9I 28 M explain why you believe you I . -- Se -

comply with the provisions of GDC 17 and your plant TSs, or describe what compensatory actions you intend to take to ensure that the offsite power system and safety-related components will remain operable when switchyard voltages are inadequate.

3(f) Describe if and how Operator prescribed training topics include procedures governing compensatory actions in response NPP operators are trained to notifications from the TSO regarding grid conditions that impair offsite power. This includes loss and tested on the of offsite power and major grid disturbances. The method and standard of evaluation for each compensatory actions training topic is specified in the applicable lesson plan. JAFNPP operators are trained and tested on mentioned in your answers applicable plant procedures as part of operator initial and requalification training programs.

to questions 3(a) through (e).

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 13of 27 i4. _I.., . .S. -.-

- 'Use' of criteria 'and methodologies to assess whether the offsite power system will remain operable'following a'trip your I

'NPP:-P.^4f"'>-9.

'; '^-*-~ . ,f,O'L't.' +'"' v'rEt~ 2~'ronP;ea #49)i L oJ 4(a) Do the NPP operators Yes. JAFNPP operating procedures provide guidance on the impact of plant equipment due to have any guidance or degraded voltage conditions and the required operator actions. Plant procedures also address procedures in plant TS control and monitoring of the main generator output and voltage regulator to support plant and grid bases sections, the final conditions. JAFNPP does not have auto tap changing transformers, capacitors, and static VAR safety analysis report, or compensators. Furthermore, Technical Specification Bases and the UFSAR provide relevant plant procedures regarding information and the operators are trained (classroom and simulator) and tested on applicable situations in which the procedures as part of their initial and requalification training programs. The method and standard of condition of plant-controlled evaluation for each training topic is specified in the applicable lesson plan.

or -monitored equipment (e.g., voltage regulators, auto tap changing transformers, capacitors, static VAR compensators, main generator voltage regulators) can adversely affect the operability of the NPP offsite power system?

If so, describe how the operators are trained and tested on the guidance and procedures.

4(b) If your TS bases Not applicable. Procedures are in use as noted in item 4(a).

sections, the final safety analysis report, and plant procedures do not provide guidance regarding situations in which the condition of plant-controlled -

or -monitored equipment can adversely affect the operability of the NPP offsite

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 14 of 27 E ,.,,;

e l -_

power system, explain why you believe you comply with the provisions of GDC 17 and the plant TSs, or describe what actions you intend to take to provide such guidance or procedures.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 15of 27 gw=! mr2 . -- l l -

Use of NPP licensee/TSO protocols and analysis tool by TSOs to assist NPP licensees in monitoring grid conditions for consideration in maintenance risk assessments The Maintenance Rule (10 CFR 50.65(a)(4)) requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities before performing them.

5. '.-- '-Performance of grid reliability evaluations as part'of the'maintenance risk'assessments required by 10 CFR 50.65(a)(4).'-':-

5(a) Is a quantitative or Yes. JAFNPP performs qualitative risks assessment as required by 10 CFR 50.65 and JAFNPP qualitative grid reliability Plant Technical Specification. The program is implemented by JAFNPP On-Line Risk Assessment evaluation performed at your and Outage Risk Assessment procedures. These procedures require plant risk assessment before NPP as.part of the removing equipment from service for planned maintenance activities, or upon discovery of maintenance risk equipment out of service that is unplanned. The JAFNPP On-Line Risk Assessment procedure assessment required by 10 requires an evaluation of current and anticipated grid conditions before removing risk significant CFR 50.65(a)(4) before equipment from service. The Equipment Out of Service (EOOS) Monitor is a computer based performing grid-risk-sensitive program that is used to calculate Core Damage Frequency and conditional Core Damage Frequency maintenance activities? This for the plant equipment configuration and testing activities for both planned and unplanned includes surveillances, post- configurations. The JAFNPP Work Management procedure requires a risk plan development for maintenance testing, and activities that would increase grid instability in combination with external events.

preventive and corrective maintenance that could increase the probability of a plant trip or LOOP or impact LOOP or SBO coping capability, for example, before taking a risk-significant piece of equipment (such as an EDG, a battery, a steam-driven pump, an alternate AC power source) out-of-service?

5(b) Is grid status monitored Yes. 345kV and 115kV grid status is continuously monitored by the TSOs. Changing conditions are by some means for the communicated to the JAFNPP by the TSOs in accordance with the-existing formal agreements and duration of the grid-risk- protocols. Notification occurs whether or not maintenance is on-going. The TSOs are required to

Attachment 1 Docket No. 50-333 JAFP-06-0057 MMZMM MIPage 16 of 27 sensitive maintenance to notify JAFNPP whenever an impaired or potentially degraded grid condition is recognized by the confirm the continued TSOs.

validity of the risk assessment and is risk Emergent conditions (i.e., significant changes to conditions assumed in the original risk assessment) reassessed when could change the results of a previously performed assessment. Examples include plant warranted? If not, how is the configuration or mode changes, additional structures, systems and components (SSCs) out of risk assessed during grid- service due to failures, or significant changes in external conditions (weather or offsite power risk-sensitive maintenance? availability).

When identified, the risk assessment is re-evaluated to address these changes in plant conditions on a reasonable schedule commensurate with the safety significance of the condition. Based on the results of the assessment, ongoing or planned maintenance activities may need to be suspended or rescheduled, and SSCs may need to be returned to service.

5(c) Is there a significant Yes, the NYISO Reliability Coordinator Area is a summer peaking area. Due to high intra-area and variation in the stress on the inter-area power flows, it would be expected that the grid would be stressed. However, this stress is grid in the vicinity of your managed through facility maintenance coordination. During the summer peak season, transmission NPP site caused by facility maintenance is avoided in June, July and August if possible. Anytime that maintenance is scheduled, the schedules are managed in order to maintain operation of the bulk power system seasonal loads within established operating criteria.

or Yes. Electric Power Research Institute (EPRI) TR-101 1759, dated December 2005, indicates there is a statistically significant seasonal-regional variation in recorded LOOP events from 1997 to 2004.

maintenance activities The data shows a comparatively higher probability of a LOOP occurring in the summer months in the associated with critical NPCC region. This correlates with recent NRC publications (e.g., NUREG/CR-6890 and NRC transmission elements? Information Notice 2006-06).

Is there a seasonal variation Seasonal weighted values of grid-centered events for the JAFNPP region from.Table 4-6 of EPRI (or the potential for a TR-1 011759 are as follows:

seasonal variation) in the LOOP frequency in the local Spring 0.75 transmission region? Summer 4.0 Fall -

If the answer to either Winter 1.25

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 17of 27 N s1111.8gs question is yes, discuss the I . -- S. -

time of year when the variations occur and their magnitude. 4.

5(d) Are known time-related No. Time-related variations in LOOP probability are currently not quantitatively evaluated at variations in the probability JAFNPP. For 10CFR50.65 (a)(4) workweek evaluations for activities which may impact availability of a LOOP at your plant site of the 115kV transmission lines or mitigating systems, JAFNPP uses a single yearly-averaged considered in the grid-risk- initiating event frequency for the LOOP. However, since maintenance is performed throughout the sensitive maintenance year on LOOP-sensitive components (such as EDGs, ESW, etc.), procedural consideration of "high evaluation? If not, what is risk" periods (severe weather, grid disturbances, transmission line maintenance, etc.) is applied as your basis for not described in the answer to question 5(a). Based on this, the averaged initiating event frequency is considering them? currently judged to be adequate and changes to this approach will be considered as further information becomes available.

5(e) Do you have contacts Yes. TSO communication contacts are implemented per procedure for assessment of grid with the TSO to determine conditions before performing grid-risk sensitive maintenance activities.

current and anticipated grid conditions as part of the grid reliability evaluation performed before conducting grid-risk-sensitive maintenance activities?

5(f) Describe any formal Notification occurs whether or not maintenance is on-going. The TSOs are required to notify agreement or protocol that JAFNPP whenever an impaired or potentially degraded grid condition is recognized by the TSOs.

you have with your TSO to Specific examples of known potentially degrading conditions identified in the agreement include:

assure that you are promptly alerted to a worsening grid . De-energizing, switching or in-service work on transmission lines associated with JAFNPP condition that may emerge

  • Potentially damaging inclement weather -

during a maintenance . Solar Magnetic Disturbances activity.

  • Post-contingency voltage alarm for the 115kV offsite power system
  • Special system operating configurations The occurrence of emergency events or conditions that threaten the 115kV or 345kV grid stability or

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 18of 27 aL I W M reliability requires notification to JAFNPP as soon as possible. De-energizing, switching or beginning in-service work on transmission lines associated with JAFNPP requires prior notification to JAFNPP.

5(g) Do you contact your Yes. The TSOs are contacted before the start of grid-risk sensitive maintenance activities and at the TSO periodicallv for the completion of the activity. Changes to grid conditions are communicated to JAFNPP as stated in duration of the arid-risk- question 5(f) above. During ongoing EDG or 115kV transmission line maintenance, JAFNPP sensitive maintenance contacts the TSO every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

activities?

5(h) If you have a formal Training on integrated risk management, on-line work activities and shutdown safety is mandated in agreement or protocol with the operators' initial training program and is periodically addressed in the operator requalification your TSO, describe how program.

NPP operators and maintenance personnel are The method and standard of evaluation for each training topic is specified in the applicable lesson trained and tested on this plan.

formal agreement or protocol.

5(i) If your grid reliability Not applicable. JAFNPP relies on a proceduralized communication protocol and performs the evaluation, performed as required evaluations in accordance with 10CFR 50.65(a)(4).

part of the maintenance risk assessment required by 10 CFR 50.65(a)(4), does not consider or rely on some arrangement for communication with the TSO, explain why you believe you comply with 10 CFR 50.65(a)(4).

5(j) If risk is not assessed Not applicable. Risk is assessed based on continuing communications with the TSO.

(when warranted) based on continuing communication

Attachment 1

- - Docket No. 50-333 JAFP-06-0057 Page 19 of 27 Ei LI M s I0i ;l2II1 1 1 iREl1 _ 1 1I I£ I with the TSO throughout the duration of grid-risk-sensitive maintenance activities, explain why you believe you have effectively implemented the relevant provisions of the endorsed industry guidance associated with the maintenance rule.

5(k) With respect to Not applicable. No alternative actions required.

questions 5(i) and 50), you may, as an alternative, describe what actions you intend to take to ensure that the increase in risk that may result from proposed grid-risk-sensitive activities is assessed before and during grid-risk-sensitive maintenance activities, respectively.

.. . .- : , , -.--Z.. , - - -' -' - '. . . .'

Attachment 1

- - Docket No. 50-333 JAFP-06-0057 Page 20 of 27 rNII 0 . a 1YM -E -- M - -

6;- Use of risk assessment results, including the-results of arid reliability evaluations,' in managing maintenance'nisk,' as re uired by 10 CFR 50.65(a)(4).:'4  :-i - - -- ;  ; -  :

6(a) Does the TSO Yes. The TSOs coordinate with JAFNPP on transmission system maintenance activities that can coordinate transmission have an impact on station operation. Both JAFNPP and TSO procedures have processes to system maintenance address coordinating transmission system maintenance activities. The process requires advanced activities that can have an notice and subsequent mutual agreement for planned outages to ensure grid reliability is impact on the NPP operation maintained. Once equipment is switched out of service, grid status is monitored by the TSOs.

with the NPP operator?

6(b) Doqyou coordinate NPP Yes. Work activities on the 115/345 kV systems that have the potential to affect the operation of maintenance activities that JAFNPP as identified in site procedures are coordinated with the TSO by JAFNPP. Other can have an impact on the maintenance activities that can potentially impact the transmission system (e.g., voltage regulator transmission system with the maintenance), are also coordinated with the TSO. Site procedures require notification to the TSO TSO? for inoperability or maintenance associated with offsite power systems.

6(c) Do you consider and Yes. JAFNPP plans and schedules grid-risk-sensitive maintenance activities taking into implement, if warranted, the consideration grid conditions. Emergent issues with the grid are managed to maintain a high level rescheduling of grid-risk- of plant safety. At times, appropriate management means rescheduling activities. At other times, sensitive maintenance this may involve backing out of the task and restoring the safety-related function of the equipment.

activities (activities that could (i) increase the likelihood of a plant trip, (ii) increase LOOP probability, or (iii) reduce LOOP or SBO coping capability) under existing, imminent, or worsening degraded grid reliability conditions?

6(d) If there is an overriding Yes. The JAFNPP Protected Equipment Program governs the alternate equipment that is need to perform grid-risk- protected when grid-risk-sensitive maintenance is in progress. The risk assessment procedure sensitive maintenance requires minimizing activities that have the potential to result in a plant transient when the risk level activities under existing or is identified that warrants this action.' Additional actions such as preplanning to minimize the time of imminent conditions of impairment, additional staffing and verifying alternate equipment status are included.

degraded grid reliability, or continue grid-risk-sensitive

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 21 of 27

.: s. em - ., I l l0 l II I, maintenance when grid conditions worsen, do you implement appropriate risk management actions? If so, describe the actions that you would take. (These actions could include alternate equipment protection and compensatory measures to limit or minimize risk.)

6(e) Describe the actions JAFNPP has procedures for evaluating the risk for all maintenance, including grid risk-sensitive associated with questions maintenance activities, control of on-line maintenance activities and shutdown safety for offline 6(a) through 6(d) above that activities. Accomplishment of grid reliability evaluations is assured through the use of procedures.

would be taken, state Communication and coordination with the TSO is contained in JAFNPP procedures. Rescheduling whether each action is grid sensitive maintenance under existing, imminent or degraded grid conditions is part of the risk governed by documented assessment process and the coordination protocol.

procedures and identify the procedures, and explain why these actions are effective and will be consistently accomplished.

6(f) Describe how NPP Maintenance personnel are task qualified by their respective training programs to perform operators and maintenance maintenance activities associated with offsite power distribution. The training ranges from basic personnel are trained and electrical safety practices to preventive and corrective maintenance on selected switchyard tested to assure they can components. Applicable supervisors receive initial and, if necessary, continuing training on the use accomplish the actions of the procedures described in 6(e).

described in your answers to question 6(e). Operations personnel receive initial and, if necessary, continuing training on the use of the procedures described in 6(e) above. This is mandated in the operators' initial and requalification training programs.

6(g) If there is no effective Not applicable. JAFNPP has implemented effective coordination with the TSOs regarding coordination between the transmission system maintenance and risk significant plant maintenance.

NPP operator and the TSO regarding transmission

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 22 of 27 1115M-11a.fl M TMI 0SMM TI-system maintenance or NPP maintenance activities, please explain why you believe you comply with the provisions of 10 CFR 50.65(a)(4).

6(h) If you do not consider Not applicable. As discussed in questions 6(a) through 6(d), JAFNPP has established the and effectively implement necessary administrative controls to ensure appropriate risk management actions are effectively appropriate risk implemented.

management actions during the conditions described above, explain why you believe you effectively-addressed the relevant provisions of the associated NRC-endorsed industry guidance.

6(i) You may, as an Not applicable. No alternative actions are required.

alternative to questions 6(g) and 6(h) describe what actions you intend to take to ensure that the increase in risk that may result from grid-risk-sensitive maintenance activities is managed in accordance with 10 CFR 50.65(a)(4).

Attachment 1

' Docket No. 50-333 JAFP-06-0057 Page 23 of 27 S1I-1TI.'s IS *-SI R -

Offsite power restoration procedures in accordance with 10 CFR 50.63 as developed in Section 2 of RG 1.155 Pursuant to 10 CFR 50.63, the NRC requires that each NPP licensed to operate be able to withstand an SBO for a specified duration and recover from the SBO. NRC RG 1.155 gives licensees guidance on developing their approaches for complying with 10 CFR 50.63.

7. Procedures for identifying local power sources1 that'could be made available to resupply your plant following 'a LOOP event.",

v v_ i .a. .

Grid under-voltage Grider and ccolase lapse, 7- . .

Weather-induced pwer loss -<.

'--Preferre'd power distribution system faults'that could result in the loss of normal powertto essential switch ear buses 7(a) Briefly describe any JAFNPP has no agreement with the TSOs to identify local power sources. The NYISO and the agreement made with the TSOs have restoration plans which identify how power will be restored to the NPPs as a priority TSO to identify local power load. The TSOs are responsible for coordinating the restoration of offsite power to the NPP. The sources that could be made NPP is considered a critical facility and restoration of power is a priority. TSO procedures require available to re-supply power that, if a black start situation occurs, the TSOs will prioritize restoration of power to the NPPs.

to your, plant following a LOOP event. Since there is no way to predict the extent and characteristics of a specific blackout, the TSOs will utilize the best sources available for specific events to restore offsite power and to determine the specific power sources and paths. The TSOs have many options available to restore offsite power and would not be limited to identified local power sources.

NYISO operating procedures govern prompt restoration of loads within the NYISO control area.

While specific generation sources are not defined, priority is given to restoring offsite power to I

This includes items such as nearby or onsite gas turbine generators, portable generators, hydro generators, and black-start fossil power plants.

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 24 of 27 E I. IS INPPs once the power system is re-energized.

I 7(b) Are your NPP operators Yes. In order to properly respond when offsite power sources are restored as described in the trained and tested on response to question 7(a), operators receive classroom, practical and simulator training in the identifying and using local areas of partial LOOP, complete LOOP, grid instabilities, and station blackout. The method and power sources to resupply standard of evaluation for each training topic is specified in the applicable lesson plan.

your plant following a LOOP event? If so, describe how.

7(c) If you have not Not applicable. The NYISO has agreements with area black start capable units in accordance with established an agreement the NYISO bulk power restoration plan. The NYISO restoration plan identifies restoring power to with your plant's TSO to the NPPs as a priority, and the TSOs are responsible for coordinating the restoration of offsite identify local power sources power to the NPP. The NPP is considered a critical facility and thus restoration of power is a that could be made available priority.

to resupply power to your plant following a LOOP event, explain why you believe you comply with the provisions of 10 CFR 50.63, or describe what actions you intend to take to establish compliance.

.. '. r- -;,-, 1,-

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 25 of 27 Iel y t!! M .pa a; . - - - -.

Losses of offsite power caused by grid failures at a frequency of equal to or greater than once in 20 site-years in accordance with Table 4 of Regulatory Guide 1.155 for complying with 10 CFR 50.63 Pursuant to 10 CFR 50.63, the NRC requires that each NPP licensed to operate be able to withstand an SBO for a specified duration and recover from the SBO. NRC RG 1.155 gives licensees guidance on developing their approaches for complying with 10 CFR 50.63.

8. Maintaining SBO copingcapabilities in accordance with 10 CFR 50.63 -- - - -

8(a) Has your NPP Yes. In 1991, the initial coping duration for the JAFNPP was determined. Since that time, JAFNPP experienced a total LOOP has experienced one grid related LOOP event, which occurred on August 14, 2003 (i.e., Northeast caused by grid failure since Blackout).

the plant's coping duration.

was initially determined under 10 CFR 50.63?

8(b) If so, have you Yes. JAFNPP was reevaluated using the guidance in Table 4 of RG 1.155 and based on this reevaluated the NPP using reevaluation, no changes were warranted.

the guidance in Table 4 of RG 1.155 to determine if your NPP should be assigned to the P3 offsite power design characteristic group?

8(c) If so, what were the The results of the reevaluation concluded that JAFNPP remains assigned to the P2 offsite power results of this reevaluation, characteristic group and the SBO duration capability remains at four (4) hours.

and did the initially determined coping duration for the NPP need to be adjusted?

8(d) If your NPP has Not applicable. The reevaluation has been completed and JAFNPP has determined that it is in experienced a total LOOP compliance with 10 CFR 50.63.

caused by grid failure since the plant's coping duration was initially determined under 10 CFR 50.63 and

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 26 of 27 is I.s. M E .I has not been reevaluated using the guidance in Table 4 of RG 1.155, explain why you believe you comply with the provisions of 10 CFR 50.63 as stated above, or describe what actions you intend to take to ensure that the NPP maintains its SBO coping capabilities in accordance with 10 CFR 50.63.

-' -A' - - ~ , -~

Attachment 1 Docket No. 50-333 JAFP-06-0057 Page 27 of 27 KI Is.,,If TI. rz0 - IT Actions to ensure compliance

'9;' If youdetermine that any:action is warranted to'bring your NPP into'compliance',with NRC'regulatory requirements including TSs,

'GDC.7, 10 CFR 50.65(a)(4),10 CFR 50.63, 10 CFR 55.59 or,10 CFR 50.120,'describe the schedule"orimplementihgit.  ;;

Based on applicable NRC SERs, JAFNPP is in compliance with TSs, GDC 17, 10 CFR 50.65(a)(4), 10 CFR 50.63,10 CFR 55.59, and 10 CFR 50.120. Accordingly, no additional actions are warranted

.1