JAFP-03-0139, September 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant

From kanterella
(Redirected from JAFP-03-0139)
Jump to navigation Jump to search
September 2003 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
ML032950594
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/14/2003
From: Ted Sullivan
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-03-0139
Download: ML032950594 (4)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP

  • Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan October 14, 2003 Site Vice President - JAF JAFP-03-0139 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-PI-17 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 September 2003 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of September 2003.

Should you have any questions concerning this report, please direct them to Mr. Mick I Baker, Thermal Performance Engineer, at (315) 349-6181.

Very truly yours, A T. A. SULLIVAN TAS:MB:dr Enclosure

cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road-King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 Mr. Paul Eddy Public Service Commission Office of Electricity and the Environment 3 Empire Plaza Albany, NY 12223 JENG JAFP Files RMS (JAF)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORTING PERIOD: SEPTEMBER 2003 Docket No.: 50-333 Unit Name: FitzPatrick Date: October 2, 2003 Completed By : M. Baker Telephone: (315) 349-6181 APENDIX A - OPERATING DATA REPORT I. Design electrical rating (net MWE): 816

2. Maximum dependable capacity (gross MWE): 839 NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 3 Number of hours reactor was critical: 720.0 6365.0 187695.5 4 Hours generator on-line: 720.0 6227.9 182362.2 5 Unit reserve shutdown hours: 0.0 0.0 0.0 6 Net electrical energy generated (MWH): 581680.0 5105451.0 136045246.0 APPENDIX B - UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OFSSHUTTING CAUSEI

(*) IHOURS (I) DOWN TIHE REACTOR CORRECTIVE ACTIONS /

_ _____ ______ ___________ ________ (2) COM M ENTS N/A

(*) TYPE: (I) REASON: (2) METHOD:

F. FORCED A. Equipment failure (explain) 1. Manual S. SCHEDULED B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator training/license examination 5. Other F. Administrative G. Operational error (explain)

H. Other (explain)

REPORTING PERIOD: SEPTEMBER 2003 Docket No.: 50-333 Unit Name: FitzPatrick Date: October 2, 2003 Completed By: M. Baker Telephone: (315) 349-6181 APPENDIX B - OPERATIONAL

SUMMARY

The FitzPatrick plant operated at or near rated power for the duration of the month of September 2003 with the exception of the following:

Note: This list does not include minor derates for rod pattern adjustments. (<20% reduction in average power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

September 25, 2003 - 1740 While operating at 100% power the "B" reactor water recirculation (RWR) pump field breaker tripped resulting in reduced reactor coolant flow and reduction to approximately 60% power. Following repairs of the tach generator on the "B" RWR motor generator set, the plant returned to 100%

power on September 28, 2003 - 1710.