IR 05000528/2020412

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000528/2020412, 05000529/2020412, and 05000530/2020412
ML20241A085
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/28/2020
From: Ray Kellar
Plant Support Branch-1
To: Lacal M
Arizona Public Service Co
References
IR 2020412
Download: ML20241A085 (3)


Text

August 28, 2020

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

SECURITY BASELINE INSPECTION REPORT 05000528/2020412, 05000529/2020412, AND 05000530/2020412

Dear Mrs. Lacal:

On July 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [P.2] - Evaluation.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde. The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000528, 05000529, and 05000530 License Nos. NPF-41, NPF-51, and NPF-74 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV ML20241A074 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML20241A085 (Cover letter)

Entire Report: Non-Sensitive Publicly Available SUNSI Review dah Sensitive Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review dah Sensitive Non-Publicly Available OFFICE PSB1 PSB1 PSB1 PSB1 BC DRPD BC PSB1 BC NAME DHolman CJewett AMeyen RKellar JDixon RKellar DATE 08/27/2020 08/27/2020 08/27/2020 08/27/2020 08/27/2020 08/28/2020