IR 05000528/2020411

From kanterella
Jump to navigation Jump to search
NRC Inspection Report 05000528/2020411, 05000529/2020411, and 05000530/2020411
ML20280A873
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/09/2020
From: Ray Kellar
Plant Support Branch-1
To: Lacal M
Arizona Public Service Co
References
IR 2020411
Download: ML20280A873 (7)


Text

October 9, 2020

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 -

NRC INSPECTION REPORT 05000528/2020411, 05000529/2020411, AND 05000530/2020411

Dear Ms. Lacal:

On September 24, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. On September 24, 2020, the NRC inspectors discussed the results of this inspection with Mr. S. West, Director, Emergency Services, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA James R. Larsen Acting for/

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000528, 05000529, and 05000530 License Nos. NPF-41, NPF-51, and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529, and 05000530

License Numbers:

NPF-41, NPF-51, and NPF-74

Report Numbers:

05000528/2020411, 05000529/2020411, and 05000530/2020411

Enterprise Identifier: I-2020-411-0008

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Location:

Tonopah, AZ

Inspection Dates:

September 21, 2020 to September 25, 2020

Inspectors:

D. Hostetter, Physical Security Inspector

C. Jewett, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program through completion of the following procedure elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 7 Requirements [02.09 a, 02.10 a, 02.11 a,c,d, 02.12 a, 02.13 a]
  • Tier III: 1 Requirement [02.14]

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 7 Requirements [02.05 b-c, 02.06 b, 02.07 a, 02.08 a, 02.09 a-b]
  • Tier III: 2 Requirements [02.10, 02.13 a]

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 24, 2020, the inspectors presented the NRC inspection results to Mr. S. West, Director, Emergency Services, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

Corrective

Actions

20-09937, 20-10414, 20-10852

Corrective Action

Documents

Resulting from

Inspection

Corrective

Actions

20-11953, 20-11961, 20-11963, 20-11971, 20-12009, 20-

2059

Miscellaneous

Nuclear

Assurance

Department

Audit Plan and Report, Cyber and Nuclear Security

2018-008 & 2019-001

Revision 1

PV-E2293

Security Compensatory Post Worksheets

Multiple

Security Event

Logs

September 2019 - September 2020

Procedures

01DP-OA01

Procedure Action Request

Multiple

01DP-OAP09

Procedure & Work Instruction Use & Adherence

Revision 19

20DP-OSK20

Conduct of Security

Revision 53

20DP-OSK28

Security Weapons and Equipment Control

Revision 34

20DP-OSK34

Safety/Security Interface

Revision 10

20DP-OSK70

Security Ingress Equipment Testing

Revision 2

20DP-OSK71

Security Perimeter Intrusion Detection Testing

Revision 8

20DP-OSK72

Security Doors, Hatches, and Turnstiles Testing

Revision 3

20DP-OSK77

Security Miscellaneous Testing

Revision 1

20DP-OSK99

SOCA Access Facility (SAF) Post 1

Revision 8

30DP-9MP01

Conduct of Maintenance

Revision 84

71130.07

Corrective Action

Documents

19-15289, 20-01387, 20-02016, 20-11987, 20-11994, 20-

11996, 20-12070

Miscellaneous

Universal Thermal Mono-Sight

04/14/2020

Basic Pistol Qualifications Course

08/06/2020

Basic Rifle Qualifications Course

08/06/2020

Night Fire Pistol Qualifications Course

2/22/2019

Night Fire Rifle Qualifications Course

2/22/2019

Security Post Orders

004

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Plant Security Plan

2

Universal Thermal Mono-Sight (Gas Mask)

04/14/2020

CSA-61

Cyber Security Tampering Continuing Training

001

ESD 07

Tactical Firearms Qualification

08/05/2020

ESD 30

Familiarization Firearms Enhancement Course

08/21/2020

ESD 86-52

Nuclear Security Training: Tamper Tour Lesson Plan

2

Procedures

01DP-0EM12

Armed Security Personnel Medical Examinations

017

20DP-0SK34

Safety/Security Interface

010

20DP-0TR01

Security Personnel Training

28

20DP-0TR02

Conduct of Security Training

019