September 29, 2020

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

SECURITY BASELINE INSPECTION REPORT 05000528/2020410, 05000529/2020410, AND 05000530/2020410

Dear Mrs. Lacal:

On September 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The NRC inspector discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000528, 05000529, and 05000530 License Nos. NPF-41, NPF-51, and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2020410, 05000529/2020410 and 05000530/2020410

Enterprise Identifier: I-2020-410-0008

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Location:

Phoenix, AZ

Inspection Dates:

September 21, 2020 to September 23, 2020

Inspectors:

D. Holman, Senior Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

Access Control (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 5 Requirements [02.06 c.d, 02.08 a.b.c]
  • Tier III: 1 Requirement [02.09]

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

The inspector verified performance indicator data listed below:

(1)

(October 1, 2019-June 30, 2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 23, 2020, the inspector presented the security baseline inspection results to Mrs. M. Lacal, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

20-00806, 20-

00336, 20-10279,

20-01956

Corrective Action

Documents

Resulting from

Inspection

20-12024, 20-

11889, 20-11924,

20-11941, 20-

11942

Miscellaneous

01-005-20

PVNGS Security Briefing, Unit 2 A5H01

2/12/2020

Test Record

Unit Proximity Reader, BMS And Turnstile Testing, Unit 2, A

H01

2/14/2020

Procedures

20DP-0SK21

Power Block Protected Area Access Control - Post 2, Post 3,

and Post W-3

Revision 33

20DP-0SK22

Protected Area Ingress and Egress Control

Revision 50

20DP-0SK23

Personnel Escorted Access Processing

Revision 37

20DP-0SK24

Sally Port Access Control

Revision 45

20DP-0SK26

Security Escort Duties

Revision 24

20DP-0SK30

Security Lock and Key

Revision 50

20DP-0SK39

Palo Verde Badging Procedure

Revision 40

20DP-0SK42

Personnel Access to Protected and Vital Areas

Revision 36

20DP-0SK55

Protected and Vital Area Vehicle Access

Revision 12

Work Orders

4766325/0

All three unit's A5H01 hatch handles

4/13/2016