IE Insp Repts 50-518/79-29,50-519/79-29,50-520/79-29 & 50-521/79-29 on 791217-19.Noncompliance Noted:Unsatisfactory Batch Plant Water Control
ML19305B556
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 01/30/1980
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19305B536 List:
References
50-518-79-29, 50-519-79-29, 50-520-79-29, 50-521-79-29, NUDOCS 8003190888
Download: ML19305B556 (3)


Text

(.

..

.

fs, ja ne:

d #'

UNITED STATES

~^

NUCLEAR REGULATORY COMMISSION

'

$ *-

E n#

REGION ll e

101 MARIETTA sT N.W.. SUITE 3100 ATLANTA. GEORGIA 30303

JAN 3 o isso Report Nos. 50-518/79-29, 50-519/79-29, 50-520/79-29 and 50-521/79-29 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, Tennessee 37401 Facility Name: Hartsville Nuclear Plant Docket Nos. 50-518, 50-519, 50-520 and 50-521 License Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 Inspector:

h 1A

!-/6-MO J.

'. ' Hirris'

Date Signed Approved by:

d d-m,/ pro

,

[or T."T. Conlon, Section Chief, RC&ES Branch Date Signed

.-

SUMMARY Inspection on December 17-19, 1979

'

Areas Inspected This routine unannounced inspection involved 24 inspector-hours onsite in the

areas of structural concrete, spray ponds and a previously identified item.

Results Of the three areas inspected, no items of noncompliance or deviations were

-

identified in two areas; one item of noncompliance was found in one area

(Deficiency - Batch plant water control paragraph 6).

.

G

,

.

8008190k

' '

<

- _. _. - - - -. -

._

.

---..

.

.-

f - -- -., -.

~-.

.

..

,

DETAILS 1.

Persons Contacted Licensee Employees

  • R. T. Hathcote, Project Manager
  • W. T. Quinn, Construction Engineer, BOP
  • W. R. Brown, Construction Engineer, STRIDE
  • W. O. Brown, Assistant Construction Engineer, BOP
  • H. S. Sheppard, Assistant Construction Engineer-QC, STRIDE
  • J. W. Davenport, Materials Engineer Supervisor, STRIDE B. E. Huffaker, Materials Engineer Supervisor, STRIDE
  • R. C. Nixon, Document Control Supervisor G. R. Gonsalves, QA Supervisor
  • A. G. Debbage, QA Engineer
  • W. W. Davis, QC Materials Engineer, STRIDE
.

J. Burton, Civil QC Inspector Other licensee employees contacted included two construction craftsmen and four technicians.

'

  • Attended exit interview

-

2.

Exit Interview The inspection scope and findings were summarized on December 19, 1979, with those persons indicated in Paragraph I above.

.

3.

Licensee Action on Previous Inspection Findings (Closed) Noncompliance (518/79-22-02, 519/79-22-02, 520/79-22-02 and 521/79-22-02:

Spray Pond Support Fill Testing.

Three point compaction tests were not performed on the spray pond support fill at least once for each 50 routine tests on each soil type being used as specified in specifi-p cation G-9.

The inspector examined the licensees' response dated October 26,

1979, and implementation of corrective action.

Procedure C-102 has been revised to clarify three point compaction testing; three point compaction tests have been made for earthfill operations during July-October, 1979 and July-September 1978. This item is closed.

4.

Unresolved Items Unresolved items were not identified during this inspection.

.

5.

Independent Inspection The inspector examined the following areas:

t a.

Batch Plant l

b.

Soils and Concrete Laboratory l

.; -

,

.

-.:..

.. -,. ~, -. -

-.

-

-

.

(

.

..

.

..

-2-c.

Compaction records for the spray ponds d.

Audit numbers HT-L-79-02, Concrete Placement, and HT-C-79-07, Earthfill Placement.

No deviations or items of noncompli nce were identified.

6.

Containment (Structural Concrete I.) Review of Quality Records, Unit 2B The inspector examined quality records for pour number B2R-1C8D on the unit 2B basemat. Acceptance criteria examined by the inspector were:

a.

PSAR, Section 3.8 b.

TVA Specification G-2, Plain and Reinforced Concrete c.

C. F. Braun Specification, TVA STRIDE d.

Procedures QCI-C-201 to 218, 401, 402; CEP 9.02, 12.01, 15.01 and 17.01 Examination of quality records disclosed the following noncompliance.

Criterion XVII of Appendix B to 10 CFR 50 which is implemented by Section

,

17.1A.17 of the PSAR states, " Sufficient records shall be maintained to furnish evidence of activities affecting quality." Test cylinder data sheets show that the water content varied twenty to twenty-five percent above the amount specified in the design mix on test cylinder numbers 10664, 10666, 10667, 10669 and 10670. Yet, slump and strength data were

.,

for the most part within design requirements and showed no signification variation from results where water contents were at the specified water content.

In fact, in some cases slump results were lower and strength results were considerably higher than batches where the recorded water content was less than specified. The contrasting water contents shown by the records are not compatible with test results. This item was identified to the licensee as Deficiency Number 521/79-29-1, Batch Plant Water Control.

.