IE Insp Repts 50-518/79-28,50-519/79-28,50-520/79-28 & 50-521/79-28 on 791211-14.Noncompliance Noted:Weld Ticket for Seam DVS00035 (Repair) Signed Off Before Welder Was Ready to Start Welding
ML19312D090
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 01/22/1980
From: Economos N, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19312D076 List:
References
50-518-79-28, 50-519-79-28, 50-520-79-28, 50-521-79-28, NUDOCS 8003190798
Download: ML19312D090 (4)


Text

,r.

.

4,

'~'

' -

j

. UNITED STATES

o 8-

~ NUCLEAR REGULATORY COMMISSION

,,

t; -

a REGION 11

'*

.

g_

101 MARIETTA ST N.W SUITE 3100

-

ATLANTA. GEORGIA 30303

.

JAN 2 9 i980 Report Nos. 50-518/79-28,.50-519/79-28, 50-520/79-28 and 50-521/79-28 Licensee: Tennessee Vall.ey' Authority 500A Chestar.c Street Chattanooga, Tennessee 37401

.

Facility Name: Hartsville Nuclear Plant Docket Nos.~ 50-518, 50-519, 50-520, and 50-521-

' License Nos. CPPR-150, CPPR-151,-CPPR-152 and CPPR-153 Inspection at Hart il Tte near Hartsville, Teanessee Inspector M-N 6'

! e7/

N. E'codomosF JTate Sggned

/bc

[O

. Approved b :

.

t n-A. R. Herdt, Section Chief, RC&ES Branch Date Si'gned

/

SUM!i'RY

.

. Inspection on December 11-14, 1979

~ Areas Inspected

This routine, unannounced inspection involved 29 inspector-hours onsite in the areas of steel structures and supports - welding observation, NDE and welder QA training (Unit A1); other safety-related pipe welding (Unit B1).

Results

.Of the four areas inspected, no items of noncompliance were identified in three areas; one item of noncompliance was identified in one area.(Infraction - QC inspection of preheat,. paragraph 6.a.).

?:

.

.

L8008190 N

,

p, M

<= 4 %-

      • h%tw e vw T e $ se + Sp_

,

          • e-*-%
  • M

- - -- *p epor67e m *- * * * -=+~A

  • = * *
    • '******-**%**m****'*

.,

,

y

., - -

.-

.

l 7

,

..

i DETAILS 1..

Persons'Co'ntacted Licensee Employees

  • R.

T.~ Hathcote, Project Manager

'

  • L. H.: Jackson, Assistant Construction Engineer, STRIDE
  • H. S. Sheppard, Assistant Construction Engineer, STRIDE

!

  • W.f R. ~ Brown, Construction Engineer, STRIDE

'44.~ T. Quinn, Construction Engineer, BOP

  • J. P. Knight, QA HanaEer, OEDC
  • S. P.'Stagnolia, Welding QC Supervisor. STRIDE B. J. Johnson, Welder Training Supervisor -

J. Osborn, Boiler Maker Superintendent J. Deckard, Boiler Maker, Foreman C. Mansfield, Boiler Maker, Foreman J. Yarborough, Level II Examiner (RT)

.

Other' licensee employees contacted included construction craftsmen, technicians, and office personnel.

NRC Resident Inspector

..

  • W. B. Swan
  • Attended exit interview 2.

Exit Interview t

.

The inspection scope and findings were summarized on December 14, 1979 with those persons indicated in Paragraph I above. The item of noncompliance identified in paragraph 6 of this report was discussed in detail. No dissenting comments were received from the licensee.

'3.

Licensee Action on Previous Inspection Findings b

'

Not inspected.

' 4.

! Unresolved Items

Unresolved items are matters about which more information is required-to determine whether they are acceptable or may involve noncompliance or deviations. A new unresolved item identified during this inspection is

.

_ discussed in paragraph Sd..

.

_

L

.

i

>.

+'

']

-

r.*

~ ~. -

.

c,.

-2-l

'l 5.

Independent Inspection Effort a.

Plant Tour The inspector performed a general inspect ton of Units A1, A2, and B1 to assess construction progress and/or. mot hballing activities under way in the three units.. In addition the inspector spot checked completed welds for workmanship quality, cleanliness around work areas, house-keeping and control.of weld electrodes, used/ unused, around these areas.

b.

Reactor Pressure Vessel (RPV) Lift (Unit A1)

The inspector observed the RPV lift which commenced on December 12, 1979. The vessel was lifted and set in the upright position where workman removed the protective support skirt. The RPV remained in this position through the duration of this inspection.

c.

Pedestal Bearing Plate Machining

.The inspector discussed / observed machining of the bearing plate with the licensee's cognizant engineer. Mechanical problems and operator error-resulted in a machining gouge in one section of the plate that subsequent material removal deminished but did not remove completely.

-

Plans called for removing approximately 0.080" of material from the high' spot of the pedestal caused by weld repairs on the pedestal wall.

  • The licensee represent 3tive stated that the - four (4) inch minimum plate thickness would not be violated.

d.

Welder Qualification and Training - Inspector Follow-up Item (IFI)

518, 519, 520, 521/79-12-04 (Closed)

In response to inspector follow-up item 50-518, 519, 520, 521/79-12-04,

"QA Training program for welders", the inspector reviewed TVA's QA Program Manua',, Issued on May 1, 1979, which provides for the training of welders and welding operators under section TL-201. The section requires these craft to receive 16 classroom hours of instruction on weld procedure parameters and applications; inspection points and quality levels; gealificatica mainte24nce; weld metal control and qualification test. Discussions with TVA site management disclosed this program had not been implemented as yet.

In response the inspector stated that this prograt was of utmost importance to weld quality and expressed concerns over managements failure to implement it in a timely manner even thougt IE:II had brought it to their attention as an IFI'79-12-04. -TVA's site management. stated that these concerns-were. understood and thac the training program would be ~ started by February 1,1980. The inspector stated this matter would be closed as-an IFI and would now be identified as unresolved item 518, 519, 520, 521/79-28-02, Welder QA Training Progra &

'

'

,..

.A_.A

>

t

.4-3-

-Within the: areas inspected no items.of noncompliance or deviations were.

identified.

~

6.

Steel Structures and Supports - Observation of Welding Activities within

~

Containment - (Unit A1)

a.

-Welding inside containment at the time of this inspection was centered around the containment steel structure (repairs) and on the dry wall vent structure (DVS).

C. F. Braun specification number 200-09, Revision 5, S/9/78 provides' specific requirements relative to fabrication inspection and. testing of the DVS.

Codes controlling these. activities included ASME sections III, (74,S74) Division 1 NE-5100, NE-5300,Section V and IX; AWSDI.1-74. The applicable code for. containment (CS) welding, as required.by Braun and Company specification 300-13,.

-Revision 7 and TVA " Code of Record" letter dated October 23, 1978, is the ASHE Boiler and Pressure Vessel Code,Section III, Division 1, Subsection NE, 1974 Edition, Summer 1974 Addenda for the shell and Division 2, Subsection CC, 1975 Edition for the bottom liner.

Observation of field welding activities included, where applicable, the following areas; weld identification and location, joint preparation and alignment, evidence of QC verification, use of specified weld procedure, welder qualification, use of specified weld material, use

-

of specified preheat, control of interpass temperature, cleanliness, removal of are strikes and weld spatter. The following activities were observed:

(1) JOINT' REPAIR (DVS)

Vertical Seams DVS00009 DVS00007 DVS00035 l

(2) JOINT WELLED OUT (DVS)

Vertical Seams i

DVS00073 R/2

"

DVS00075 R/1

)

DVS00077-DVS00037 (3) JOINT REPAIR.(CS).

  • CS0023 R/1 W

'

-b.

Within these areas the inspector noted that preheat check on the weld.

ticket for seam number DVS00035 (repair) had been signed 'off at a time

'

,

Y

.

-_

..

.

,..-

..

_.

. _. _

__ _-.

-. _ _ _.

.. _ _ _

_ - - -

-

..,

....v

.e

t V-s

.

when'the welder _was not ready to start welding. Moreover the inspec-

- tor' found the. welder.p~reparing (grinding and brushing) the seam for

welding. The. inspector found the weld area to be still warm to the

' touch Lbut nowhere 'close to the required 150'F preheat temperature.

Standard Operatidg Procedure. SOP-34, Rev. 1 " Weld Inspection Documen-

,

tation",. paragraph;6.3 requires the welding inspector to verify that~

t the proper preheat temperature. is being used'before welding. commences-and to. document the inspection on the appropriate record. Discussions

'with ' craft disclosed that preheat is applied; to the weld at a time when the QC inspector is available to perform the inspection even though the welder.may not be ready to commence welding. However, the inspector was assured that preheat was raised back.to the required level before welding; commenced. The inspector discussed these findings with site welding QC supervision explaining that convenience and expediency was not the intent of QC inspections and that even though the inspector.had no reason to doubt that the proper preheat tempera-ture was attained prior to welding, the validity of the inspection was lost if it was not performed in the proper time frame. Moreover the

,.

inspector pointed out that conducting inspections in this manner indicates a possible breakdown in the QC inspection program in this area. The licensee took immediate corrective action on this matter.

.

Failure to accomplish activities in accordance with code and/or proce-

~

,

dural requirements is in noncompliance in the infraction category with Criterion V of Appendix B to 10 CFR 50.

-

This-finding was' identified as item 518/79-28-01 QC Inspection - Preheat.

-7.

Steel Structures and Supports - Visual Examination of Welds The QA/QC records of completed DVS weld #DVS00017 were reviewed in order to

"'

determine.whether. visual and dimensional inspections had been performed,

~

weld appearance met acceptance standards and the record package was complete, s

a'ecurate and retreivable.

In addition the inspector reviewed the radiogra-phic film of.this weld for film and radiographic.qualtcy. Within the areas inspected.no items of noncompliance or deviation were identified.

I

'8.

L0ther Safety'- Related Piping - Observation of Welding Activities - (Unit -

-

B1)-

_

LThe-inspector performed a general! inspection in the pipe shop to observe.

welding of code piping, control of welding. material, housekeeping and to review selected.QC records of welds under fabrication. Weld number 00283

'

S.

~.on aipipe for the essential services water system on weld map drawing #19

.."

~

~

PS-ESW'-5R1 was'being fabricated at the time of the inspection. The inspector

.

reviewed' QC,r'ecords, welding' requirements, welder qualifications an,d observed / -

_

inspected the. weld for workmanship, identification and cleanliness. The'

zpipe shop's, rod. issue. station was inspected in order to ascertain whether

'

,

material; storage,1 segregation ~and; record; keeping were-consistant with

-

procedural,LCEP-8.03, Rev. 3. requirements.

iWithin1the1 areas inspected no items of noncompliance or deviations were-

.

L

<

tidentified.

.

,

,

,

4

,

. -

e

-

e..

er e-f e