IR 05000518/1979025

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-518/79-25,50-519/79-25,50-520/79-25 & 50-521/79-25 on 791029-31.No Noncompliance Noted.Major Areas Inspected:Previously Identified Items,Structural Concrete & Spray Ponds
ML19257A590
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 11/19/1979
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19257A586 List:
References
50-518-79-25, 50-519-79-25, 50-520-79-25, 50-521-79-25, NUDOCS 8001040709
Download: ML19257A590 (4)


Text

'

'o,,

UNITED STATES 8 " )A NUCLEAR REGULATORY COMMISSION o

{

-.E REGION 11

  • g,( si,,8 o,

101 MARIETTA ST N.W., SUITE 3100 ATLANTA, G EORGIA 30303

NOV 211979 Report Nos. 50-518/79-25, 50-519/79-25, 50-520/79-25 and 50-521/79-25 Licensee: Tennessee Valley Authority 500A Chestnut Street Tower II Chattanooga, Tennessee 37401 Facility Name: Hartsville Nuclear Plant License Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 Inspection at Hartsville site near Hartsville, Tennessee Inspector:

kh;AO.

// ~/I-N J. R. Harris Date Signed Approved by M

//- /9-7 7 T. E. Conlon, Section Chief, RC&ES Branch Date Signed SUMMARY Inspection on October 29-31, 1979 Areas Inspected This routine unannounced inspection involved 24 inspector-hours onsite in the areas of previously identified items; structural concrete and spray ponds.

Results Of the three areas inspected, no items of noncompliance or deviations were identified.

1690 234 80 01040 70 9

.

.

DETAILS 1.

Persons Contacted Licensee Employees

  • R. T. Hathcote, Project Manager
  • W. T. Quinn, Construction Engineer, B0P
  • L. H. Jackson, Assistant Construction Engineer, STRIDE
  • H. S. Sheppard, Assistant Construction Engineer, QC STRIDE
  • J W. Davenport, Materials Engineer Supervisor, STRIDE B. E. Huffaker, Materials Engineer Supervisor, BOP
  • W. R. Brown, Construction Engineer, STRIDE
  • G. R. Gonsalves, QA Supervisor W. W. Davis, Materials Engineer
  • W. K. Anders, QA, OEDC
  • A. G. Debbage, QA Engineer Other licensee employees contacted included four construction craftmen and ten technicians.
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on October 31, 1979 with those persons ir.,'icated in Pargraph 1 above.

3.

Licensee Action on Drevious Inspection Findings (Closed) Unresolved Item (518/79-22-01, 5F)/79-2201, 520/79-22-01 and a.

521/79-22-01): Documentation of Inprocess Test Data on Concrete and Earthfill. Documentation of test data on concrete and earthfill placements did not appear to show that required sampling intervals were being met during inprocess testing.

Procedures and attached documentation have been revised to clarify records of sampling intervals. Examination of records on testing of concrete and soils showed that required sampling intervals are being met.

This item is closed.

b.

(0 pen) Noncompliance (518/79-22-02, b.P/79-22-02, 520/79-22-02 and 521/79-22-02):

Spray Pond Support Fill Testing. Three point com-paction tests were not performed on the spray pond support fill at least once for each 50 routine tests en each soil type being used as specified in specification G-9.

The inspector examined the licensees response dated October 26, 1979 and implementation of corrective action.

Procedure C-102 has been revised to clarify three point compaction testing; three point compaction tests have been made for earthfill operations during July - October, 1979; three point i690 235

.

-2-

.

compaction tests for earthfill operations during July - September 1978, will be completed in December, 1979.

This item remains open pending review of completed compaction curves by IE:RII.

(Closed) Unresolved Item (518/79-22-03, 519/79-22-03, 520/79-22-03 and c.

521/79-22-03): Revision of Procedure QCI-C-102.

Procedure QCI-C-102 did not appear to address atteberg limit and proctor tests. The inspector examined Revision 7 to QCI-C-102 and attached documentation.

Revision 7 clarifys atteberg limit and proctor test requirements.

This item ir, closed.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Independent Inspection The inspector examined the following areas:

a.

Batch Plant b.

Soils and Concrete Laboratory c.

Compaction records for support fill for October 1979 d.

Results of concrete placements in Unit B-2 pumphouse No deviations or noncompliances were identified.

6.

Containment (Structural Concrete I) - Observation of Works & Work Activities, Unit B-2 The inspector performed a follow on inspection of a concrete placement in the Unit B-2 basemat.

The inspector observed the partial placement of pour number B2B-IC8D; 5, 956 cubic yards of concrete were placed, using pumps and concrete buckets. Acceptance criteria examined by the inspector were:

a.

PSAR, Section 3.8 b.

TVA Specific. ion G-2, Plain and Reinforced Concrete c.

C. F. Braun Specification TVA STRIDE d.

Procedures QCI-C-201 to 218, 401, 402, CEP, 9.02, 12.01, 15.01 and 17.01 Preplacement was indicated by the properly signed pour card.

Placement activities pertaining to delivery time, free fall, flow distance, layer thickness and consolidation conformed to specifications. Activities were continuously monitored by QC personnel.

l690 236

.

-3-

Samples for temperature, slump, air content, unit weight and cylinder molding were taken in accordance with specifications and procedures. Post placement inspection revealed the pour card was signed and prescribed curing was in progress.

Examination of the batch plant and stockpiles showed materials were being controlled and accurate batch plant records were being generated.

No deviations or noncompliances were identified.

1690 237