ML19257A585

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/79-25,50-519/79-25, 50-520/79-25 & 50-521/79-25 on 791029-31.No Noncompliance Noted
ML19257A585
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 11/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19257A586 List:
References
NUDOCS 8001040699
Download: ML19257A585 (2)


See also: IR 05000518/1979025

Text

I

D

  1. pn nro

y gg

UNITED STATES

gf

!"

NUCLEAR REGULATORY COMMISSION

g

go

g

e

REGION li

a #

o,

101 MARIETTA ST., N.W.. SUITE 3100

gg/

%*****

ATLANTA. GEORGIA 30303

HOV 211979

In Reply Refer To:

RII:JRH

50-518/79-25

50-519/79-25

50-520/79-25

50-521/79-25

Tennessee Valley Authority

Attn:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on

'

October 29-31, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant

facility, and to the discussion of our findings held with R. T. Hathcote at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is dis-

cussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that ye" (or your contractor) believe to be

proprietary, it is necessary that you n9e a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1690

232

0d

30 01o4

.

Tennessee Valley Authority

-2-

-

NOV 211979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

e

.*

i

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-518/79-25,

50-519/79-25, 50-520/79-25 and

50-521/79-25

cc w/ enclosures:

R. T. Hathcote, Project Manager

Post Office Box 2000

Hartsville, Tennessee 37074

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee 37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

1690

233