IR 05000483/2011006

From kanterella
Jump to navigation Jump to search
IR 05000483-11-006, on Site February 14-18, February 28-March 4, and March 14-18,2010; in Office February 21-25, March 7-11, Callaway Plant: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Bases Inspection
ML111160338
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/26/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Heflin A
Union Electric Co
References
IR-11-006
Download: ML111160338 (30)


Text