Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207E2711999-05-25025 May 1999 Ack Receipt of in Response to & Insp Rept Confirming Commitment as Stated by M Taylor During Telephonic Exit Meeting on 990413 ML20207A8711999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.Forwards Organization Chart ML20207A4131999-05-19019 May 1999 Forwards Insp Rept 50-483/99-03 on 990321-0501.One Violation of NRC Requirements Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206K6511999-05-10010 May 1999 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206N3981999-05-10010 May 1999 Responds to Comments & Questions Submitted to NRC Staff Re Recent License Amend Issued by NRC to Callaway Unit 1 License.Provides Context for Conclusion That Reracking of Callaway SFP Maintains Adequate Protection of Public Safety ML20206H1101999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals.Without Encl ML20206H1821999-05-0606 May 1999 Forwards RAI Re Licensee Request for Relief from Certain ASME Code ISI Requirements Submitted by .Response Requested within 30 Days of Receipt of Ltr ML20206F4931999-05-0303 May 1999 Forwards Exam Rept 50-483/99-302 on 990416.Insp Included Evaluation of Applicant for Reactor Operator License ML20205S2571999-04-19019 April 1999 Discusses Plans to Sponsor Testing of Electrosleeved Tubes to Better Understand Behavior of Electrosleeve Matl Under Severe Accident Conditions ML20205Q5461999-04-19019 April 1999 Forwards Safety Evaluation Relief Request from Certain ASME Section XI Requirements for Concrete Containment ISI for Plant ISI Program ML20205K7641999-04-0808 April 1999 Ack Receipt of Re Comments & Questions Concerning Recent Amend to Plant,Unit 1.Response to Comments & Questions Should Be Completed by mid-May ML20205J8701999-04-0606 April 1999 Ack Receipt of ,In Response to NRC Insp Rept 50-483/99-02,dtd 990225 Re Verbal Commitment Made During Exit Meeting for Insp.Understands Next Rev of Security Plan Will Include Increased Min Staffing of Three Armed Guards ML20205J8721999-04-0505 April 1999 Refers to Meeting Conducted in Emergency Operations Facility at Callaway Plant on 990401 Re Plant Performance Review for Plant Completed on 990211.Year 2000 Readiness Issues & New Reactor Licensee Performance Assessment Also Discussed ML20205J9401999-04-0505 April 1999 Forwards Insp Rept 50-483/99-01 on 990207-0330.One Violation Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy IR 05000019/20250011999-04-0202 April 1999 Informs That Version of Topical Rept BAW-10219P,Rev 3 Dtd Oct 1998 & Document 51-5001925-01,dtd 980828 Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20205A3821999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Callaway Plant Performance Review for Period 970510-990125. Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20204E7281999-03-18018 March 1999 Ack Receipt of Which Transmitted Rev 28 to Callaway Plant Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20204E3671999-03-18018 March 1999 Informs That During 990128 Telcon Between D Lantz & H Bundy, Arrangements Were Made for Administration of Retake Written Operator Licensing Exam at Plant,During Wk of 990419 ML20204B7091999-03-15015 March 1999 Informs That Changes Described in ,Submitting Rev 20 to Plant Operational QA Manual,Appear Consistent with Guidelines for non-reduction in Committments ML20204C4241999-03-15015 March 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207F4731999-03-0404 March 1999 Discusses 990302 Public Meeting Re Program Updates & Organizational Changes in Emergency Preparedness & Security. List of Attendees & Licensee Presentation Encl ML20207L6491999-03-0404 March 1999 Informs That Util 990111 Response to Request for Addl Info Re Question 4 Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-09-22
[Table view] |
Text
. ,
cit UNITED STATES ( ; NUCLEAR REGULATORY COMMISSION g REGION lit b j 799 ROO$tVtLY ROAD
% cttN ettyn, auNOl$ $007
'% ***** #*e February 4, 1993 Docket No. 50-483 License No. NPF-30 EA 92-215 Union Electric Company ATTN: Mr. Donald Senior Vice President - Nuclear Post Officer Box 149 - Mail Code 400 St. Louis, Missouri 63166
Dear Mr. Schnell:
SUBJECT: NOTICE OF 'IOLATION (NRC INSPECTION REPORT NO. 50-483/92020(DRP))
This refers to the special NRC inspection conducted during the period of October 26 through October 30, 1992, at the callaway Plant. The inspection included a review of the circumstances surrounding the loss of control room annunciator event which occurred on October 17, 1992. The initial NRC review of this event was performed by an Augmented Inspection Team (AIT). The report documenting the AIT findings was sent to you by letter dated November 10, 1992. The report documenting this inspection was sent to you by letter dated November 18, 1992. An enforcement conference was held on November 24, 1992, to discuss the findings of the inspection and your corrective actions. The report summarizing the conference was sent to you by letter dated December 4, 1992.
At 1:00 a.m., on October 17, 1992, all four annunciator field contact power supply output fuses blew after replacement of a failed power supply. This resulted in the loss of all main control board annunciators. However, because only 371 of 683 annunciators lit, the control room staff incorrectly believed that those annunciators which had remained dark were operable.
Upon replacement of the output fuses at 1:56 a.m., 519 of the annunciators were restored to service. Due to an inadequate post-maintenance test, plant personnel failed to recognize that full operability of 164 annunciators had not been restored.
Apparently, the power supply failure caused a voltage spike that blew an additional ten fuses, which the retest failed to detect.
The plant staff subsequently identified and replaced the failed fuses later that day. The plant had been operating at 100 percent power throughout the event.
CERTIFIED MAIL RETURN RECEIPT REQUESTED l
9302-00174 930204 gDR aDOcxOsOOg3 g ,{4 g
. .
Union Electric Company -2 -
February 4, 1993 A number of factors contributed to this event, including inadequate knowledge of the annunciator system by plant personnel, including licensed operators, instrumentation and control personnel, and engineers; inadequate teamwork and communications; poor work control practices; the lack of a questioning attitude or complacency by plant personnel; inadequate system design; and failure to learn from previous events.
We recognize that the annunciator system is not safety-related nor considered in any of the. plant's safety analyses. We also recognize that safety-related instrumentation remained available to monitor plant parameters, automatic safety systems were unaffected, and no significant systems were out-of-service.
However, the control room operators routinely rely upon the annunciator system to assist them in operating the plant and will only rely solely on safety-related instrumentation when they recognize the anr.unciator system is unavailable. The failure of your staff to recognize the status of the annunciator system (Violation A), as well as their failure to perform an adequate retest to ensure the system's operable status (Violation E), make this matter a significant regulatory concern. The initial response of plant personnel to the loss of annunciators did not meet our expectations and was not consistent with your plant's past good performance.
We acknowledge your event specific corrective actions which include training, development of off-normal and system troubleshooting procedures, improved-work controls, improved annunciator system design, and improved emergency action criteria. We also acknowledge your generic corrective actions which include a review of other important nonsafety-related systems for similar problems; improved management controls; steps to improve procedural adherence, teamwork, and communications; and improvements to the corrective action program.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Folicy) 10.CFR Part 2, Appendix C, Violations A and B in the enclosed Notice have been categorized as-a Severity Level III problem. After consultation with the Director, Office of Enforcement, and the Deputy; Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, I have decided that a civil penalty will
-
not be issued in this case in recognition of your identification I of the root causes, your broad and comprehensive corrective actions, and your plant's overall good past performance. It is expected that based on your past performance your actions will ensure that these failures will not recur.
A violation is not beina issued for the failure to declare an ALERT as required by the emergency plan for the loss of
.. .
Union Electric Company -3 - February 4, 1993 annunciators, which was the apparent violation discussed at the enforcement conference. In reaching that decision,.we concluded that such a citation would not address our primary concerns, which are discussed above. Additionally, we considered the reduced significance of the failure to declare an ALERT given that, Revision 3 of Regulatory Guide 1.101 (August 1992) accepted the new guidance for developing emergency action levels contained in NUMARC/NESP-007, Revision 2. Under most circumstances the new guidance requires declaration of an ALERT for a loss of all control room annunciators only if such a loss is concurrent with a significant plant transient or loss of compensatory non-alarming indications. Although you have not incorporated NESP-007 into your program, declaration of an ALERT _would not have been required for the October 17th event under the new guidance had your staff recognized the-loss of annunciators.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice,"
a copy of this letter will be placed in the NRC Public Document Room.
Given the extent of the corrective actions that were discussed at the enforcement conference no response to the enclosed Notice is required. However, should you wish to respond, please submit that response in accordance with the directions contained in the enclosed Notice.
Sincerely, I
W A. Bert Davis Regional Administrator Enclosure: Notice of Violation cc w/ enclosure:
G. L. Randolph, Vice President, Nuclear Operations J. V. Laux, Manager, Quality Assurance Tom P. Sharkey, Supervising Engineer, Site Licensing DCD/DCB(RIDS)
OC/LFDCB Resident Inspector, RIII Region IV Resident Inspector, Wolf Creek K. Drey cc w/ enclosure: See Next Page
. .
.. - .-.
. .
!
.,
l-Union Electric Company -4 -
February 4,1993
.t 4 i
'
cc w/ enclosure: (Con't)
Chris R. Rogers, P.E.
Utility Division, Missouri
,
Public Service Commission
!^
CFA, Inc.
Gerald Charnoff, Esq.
Thomas Baxter, Esq.
R. A. Kucera, Deputy Director,
,
Department of Natural Resources
'
d l
f
'
.
!
i f
f
,
b I
i
,
i
'_
t
_ _ -. . - . - _ --. . - ~. .
- _ . - - -
. .
.
Union Electric Company DISTRIBUTION SECY CA
,
JTaylor, EDO JSniezek, DEDR
,
JLieberman, OE i
LChandler, OGC JGoldberg, OGC TMurley, NRR'
JPartlow, NRR Enforcement Coordinators
, RI, RII, RIV, RV Resident Inspector
,
JLuehman, OE
! FIngram, GPA/PA DWilliams, OIG
- '
Bliayes, OI .
EJordan. AEOD s
Day File
EA File
!EMI?3 State of Missouri i RAO:RIII SLO:RIII
'
PAO:RIII
, IMS:RIII2
,
f J
i 1-
, - . _ , .