IR 05000483/1992025

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-483/92-25
ML20127M779
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/21/1993
From: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
References
NUDOCS 9301290011
Download: ML20127M779 (1)


Text

. - - - . . . . . . . . . . -- . - . ~ . - , - - ,

10d .

_-

Docket No..50-483 M NI License No NPF-30.

Union Electric Company ATTN: Mr. Donald ,

Senior Vice President - Nuclear Post Office Box 149 - Mail Code .400 St. Louis, MO 63166

Dear Mr. Schnell:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-483/92025(DRSS))=

This will acknowledge receipt of your letter dated. January 4,1993,'i_n response to our letter dated December 3,1992, transmitting a Notice of

-

Violation associated with failure to survey incoming radioactive packages at ,

the Callaway Power Plant. We have reviewed your corrective actions and have no further questions at this time. These currective actions will be examined during future inspections.

Sincerely, William Snell, Chief Radiological Controls Section 2 cc: G. L. Randolph, Vice President, Nuclear

< Operations J. V. Laux, Manager Quality Assurance S. E. Sampson, Supervising L Engineer, Site Licensing i

DCD/DCB (RIDS)

,

-0C/LFDCB l

'

Resident insp'ector, RIII

--Region IV Resident Inspector, Wolf Creek K. Drey C. John Renken, Engineer Policy & Federal Dept.

Gerald Charnoff, Esq.

R. A. Kucera, Deputy Director, Department of Natural Resources-RIII4 RIII ws was 280023 Nelson /dg- Snell 01/at/93 gjg 4g 0\ ,

~9301290011 930121 PDR ADOCK 05000483 I g G: PDR- L