SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-483/92012(DRP))-
Dear Mr. Schnell:
,
This will acknowledge receipt of your letter dated November 13, 1992, in response to our letter dated October 14, 1992, transmitting a Notice of Violation associated with a failure to lock damper GKD0325 at the Callaway Power Plant.
We have reviewed your corrective actions and have no further questions at this time.
These corrective actions will be examined during future inspections.
'
Sincerely,
,f]hl z p< -
L. Robert Greger, Chief Reactor Projects Branch 3 See attached distribution 9303030056_930223 ADOCKOSOOg3 PDR
f I @to
.
'
..
-e.
- FEB 2 3 m3
~i Union Electric Company
'
Distribution cc w/ enclosure:
G. L. Randolph, Vice President, Nuclear O J. V. Laux,perations Manager Quality r
Assurance S. E. Sampson, Supervising Engineer, Site Licensing-DCD/DCB (RIDS).
OC/LFDCB Resident Inspector, RIII
'
Region IV Resident Inspector, Wolf Creek K. Drey-C. John Renken,. Engineer Policy & Federal Dept.
.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director, Department of Natural Resources i
f i
s
,
6