IR 05000483/1983014
| ML20024F276 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/02/1983 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20024F277 | List: |
| References | |
| NUDOCS 8309090171 | |
| Download: ML20024F276 (1) | |
Text
h
-.
.
SEP 2 3933 Docket No. 50-483 Union Electric Company ATTN:
Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
,
Thank you for,ycur letter dated Aubast 26, 1983, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-483/83-14 forwarded by our letter dated July 28, 1983. It is our understanding that although the turbine control panel was not procured as a safety-related item, you do have documentation indicating that the panel does indeed meet safety-related requirements. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, R. C. Knop, Chief Projects Branch No. I cc:
W. H. Weber, Manager, Nuclear Construction S. E. Miltenberger, Plant Manager cc w/ltr dtd 8/26/83:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Region IV K. Drey Ronald Fluegge, Utility Divison Missouri Public Service Commission
[
RIII RI
/
RIII dcd Knop &[$
Wescott/db o
n 09/02/83 gy!.
](L 8309090171 830902
[(t PDR ADOCK 05000483
/
G PDR
/
_