September 12, 2006
SUBJECT:
RIVER BEND STATION - NRC INSPECTION REPORT 05000458/2006012
Dear Mr. Hinnenkamp:
On July 31, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your River Bend Station. The enclosed inspection report documents the inspection results, which were discussed on August 3, 2006, with Mr. Rick King and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rmladams. html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
I I Entergy Operations, Inc.
-2-In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sitpijerely, Project Branch C Division of Reactor Projects
/
Docket: 50-458 License: NPF-47 Enclosure:
NRC Inspection Report 05000458/2006012 ( )
cc wifhouf SGI enclosure:
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1 995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1 995 General Manager Plant Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 Entergy Operations, Inc. -3-Manager - Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 NRC Internal Electronic Distribution without SGI enclosure:
B. Mallett, RA T. Gwynn, DRA D. Chamberlain, D:DRS A. Howell, D:DRP NRC Internal Hard-Cow Distribution with SGI enclosure:
H. Crouch, DRP P. Alter, DRP Senior Resident Inspector 6. Westreich, NSlR B. Clayton, NRR Entergy Operations, Inc. Manager - Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 NRC Internal Electronic Distribution without SGI enclosure:
B. Mallett, RA T. Gwynn, DRA D. Chamberlain, D:DRS A. Howell, D:DRP NRC Internal Hard-Copv Distribution with SGI enclosure:
H. Crouch, DRP P. Alter, DRP Senior Resident Inspector B. Westreich, NSlR B. Clayton, NRR FOR NON-SGI LETTER A SUNS1 Review Completed ADAMS: %Yes Publicly Available ublicly Available nsitive FOR LETTER WITH SGI ENCLOSURE:
SUNS1 Review Completed ADAMS: -Yes X NO Initials:
-
Publicly Available ublicly Available Sensitive Non-Sensitive OFFICIAL RECORD COPY