September 26, 2019

SUBJECT:

BYRON STATION, UNITS 1 AND 2DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000454/2019012 AND 05000455/2019012

Dear Mr. Hanson:

On September 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station, Units 1 and 2, and discussed the results of this inspection with Mr. Harris Welt and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any findings or violations of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2019012 and 05000455/2019012

Enterprise Identifier: I-2019-012-0029

Licensee:

Exelon Generation Company, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

August 26, 2019, to September 12, 2019

Inspectors:

J. Gilliam, Reactor Inspector

J. Jacobson, Senior Reactor Operations Engineer

B. Jose, Senior Reactor Inspector

Approved By:

Karla K. Stoedter, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Byron Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more-than-minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N - Design Bases Assurance Inspection (Programs)

The inspectors evaluated Environmental Qualification Program implementation through the sampling of the following components:

Select Sample Components to Review - Risk Significant/Low Design (Inside/Outside Containment) (IP Section 02.01)===

(1)1FSV-CC053, Unit 1 Penetration Cooling Flow Control Valve (2)0VA01CB-M, 0B Auxiliary Building Supply Fan Motor (3)1CS01PA, 1A Containment Spray Pump (4)1FSV-FW035A-A, 1A Steam Generator Feed Water Tempering Line Downstream Isolation Valve (5)1RD15E, Penetration for Control Power for Rod Drive Mechanism (6)2FSV-SD054F-A, 2B Steam Generator Lower Blowdown Line Flow Control Valve

Select Sample Components to Review - Primary Containment (Inside Containment)

(IP Section 02.01) (1 Sample)

(1)2FT-0651, 2A Bearing Component Cooling Water Flow Differential Pressure Transmitter

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 12, 2019, the inspectors presented the Design Basis Assurance inspection (programs) inspection results to Mr. Harris Welt and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N Calculations

BRW-01-0153-

E/BYR01-068

Environmental Parameters of EQ Zones

Corrective Action

Documents

AR 00754986

1CC053 Did Not Fail Closed When Isolated

03/26/2008

AR 04243218

Dry Boric Acid 1SI01PA Seals

04/25/2019

AR 04272763

2FW009C Has Steady Leak From Valve-Suspected Packing

Leak

08/18/2019

AR 1681947

Boric Acid on Flange for 1CS021A

07/14/2014

AR 3984286

1SD054G Solenoid Buzzing

03/12/2017

AR 4121206

NRC Question on EQ Binder Evaluation of Limit Switches

(BRW)

03/30/2018

AR 4211520

EQ Related License Renewal Actions

01/16/2019

AR 4246901

2019 EQ FASA: EQ Binder EQ-BB-093 Revision Error

05/07/2019

Corrective Action

Documents

Resulting from

Inspection

AR 04278734

2019 NRC DBAI: Asco Coil Heat Rise Data; EQ Binder EQ-

BB-026

09/12/2019

AR 4275343

Insulation Not Installed on 1FW092B

08/29/2019

AR 4275348

Bonnet Insulation Not Installed on 1FW009B

08/29/2019

Drawings

238403

ASCO Drawing for Maximum Temperatures of Coil and

Critical Elastomers With Valve Energized and No Flow

03/01/1990

Engineering

Changes

355827

Revise EQ-BB-026 to Incorporate EC Evals EC 356210 &

355825 Evaluate New Qualified Lives for the ASCO

Solenoid Valves

01/17/2006

356210

Request to Change Replacement Frequency of ASCO

Solenoid Valves

Engineering

Evaluations

355825

Extend the Qualified Life for the Solenoid Valves on the

1FW035C, 2FW043A, 2FW043B, and 2FW043E AOVs

06/03/2005

CHRON#203764

Summary Evaluation : Impact of Elevated Temperature on

EQ Equipment in the Main Steam Tunnel

09/07/1993

EQ-BB-023

EQ Binder for Containment Spray Motors

EQ-BB-026

Equipment Qualification Binder - ASCO Solenoid Valves NP

Series

16A

EQ-BB-058

Electrical Penetration & Fiber Optic Feed-through

Assemblies; Bunker Ramo, IST Conax Nuclear, Mirion Tech

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EQ-BB-059

EQ Binder for Conax Penetrations

EQ-BB-084

EQ Binder for Limitorque Motor Operator (RH Insulation)

EQ-BB-145

EQ Binder for Rosemount Differential Pressure Transmitters

1154HP5RA-N0037

Miscellaneous

Preventive Maintenance Deferral Checklist for 2FW043C:

Steam Generator FW Isolation Bypass Isolation Valves

07/02/2005

200124

Quality Receipt Inspection Package for Solenoid Valve

2/23/2013

200727

Quality Receipt Inspection Package for Connector, Reducer

01/15/2014

PMID 00118641

Replacement Schedule for Valve FSV 054F

N/A

Procedures

ER-A-302-1006

Motor Operated Valve Maintenance and Testing Guidelines

ER-AA-302-1004

Motor Operated Valve Performance Trending

Self-Assessments

2019 Byron Environmental Qualification (EQ) Program

FASA

06/04/2019

Work Orders

00655047

Perform 15 year PM and Overhaul Using Contracted Vendor

10/25/2004

00981098

Lost Indication on 2SX016A

2/04/2016

01374934

Perform Dynamic Baker Test on 1CS01PA Motor

04/22/2012

01480116

Replace Entire Solenoid to Meet EQ Requirements

2/04/2013

01527729

Perform Motor Inspection on 1CS01PA

2/17/2013

0734820

Replace Transmitter Every 9 Years to Satisfy EQ

2/14/2006

1668381

Replace Transmitter 2FT-061

05/08/2015

4806493

2FI-0651 Low Flow Indication

07/27/2018