IR 05000445/2015006
| ML16061A322 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/02/2016 |
| From: | Troy Pruett NRC/RGN-IV/DRP |
| To: | Peters K Luminant Generation Co |
| Groom J | |
| References | |
| IR 2015006 | |
| Download: ML16061A322 (6) | |
Text
March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2015006 and 05000446/2015006)
Dear Mr. Peters:
On February 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, began the most recent quarter in the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs. On December 8, 2015, the NRC completed a supplemental inspection in accordance with the NRCs Inspection Manual Chapter for the greater-than-green Security Cornerstone inputs. Based on the results of this inspection, the NRC closed the greater-than-green Security Cornerstone inputs and updated its assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, as documented in Inspection Report and Follow-up Assessment Letter 05000445/2015408 and 05000446/2015408 (ML15358A060). This updated assessment transitioned Comanche Peak Nuclear Power Plant, Units 1 and 2, to the Licensee Response Column (Column 1) of the NRCs ROP Action Matrix as of December 23, 2015.
Therefore, beginning in the first quarter 2016, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Comanche Peak Nuclear Power Plant, Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Jeremy Groom at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Troy W. Pruett, Director Division of Reactor Projects Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Enclosure:
Comanche Peak Inspection/Activity Plan
SUNSI Review By:JRG ADAMS:
Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP D RIV/D/DRP NAME JGroom AVegel RLantz TPruett SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 2/24/16 2/24/16 2/26/16 2/29/16
Letter to Ken Peters from Troy Pruett, dated March 2, 2016
SUBJECT: ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2015006 and 05000446/2015006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)
Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, DPR (Lawrence.Kokajko@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
Page 1 of 2 02/29/2016 15:42:40 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Comanche Peak Inspection / Activity Plan 04/01/2016 - 12/31/2017 EXAMS
- INITIAL OPERATOR EXAM
1 INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)
X02572 06/13/2016 06/17/2016
INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)
X02573 06/13/2016 06/17/2016
INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)
X02572 07/11/2016 07/15/2016
INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)
X02573 07/11/2016 07/15/2016 RS 12 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/09/2016 05/13/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/09/2016 05/13/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 05/09/2016 05/13/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/09/2016 05/13/2016 71111.08
- INSERVICE INSPECTION 1RF18
1 IP Inservice Inspection Activities - PWR 7111108P 05/09/2016 05/20/2016 EB1-17T
- CP PERM PLANT MODS & 50.59 INSPECTION
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/12/2016 09/30/2016 ISFSI
- LOADING INSPECTION (ONE WEEK IN MONTH)
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 11/01/2016 11/30/2016 BRQ-2017
- BRQ - ON SITE OP TEST INSPECTION
1, 2 IP Licensed Operator Requalification Program 7111111B 11/28/2016 12/02/2016 EXAM
- INITIAL EXAM
1 INITIAL EXAM CP U1 (06/2017)
X02589 05/15/2017 05/19/2017
INITIAL EXAM CP U2 (06/2017)
X02590 05/15/2017 05/19/2017
INITIAL EXAM CP U1 (06/2017)
X02589 06/12/2017 06/16/2017
INITIAL EXAM CP U2 (06/2017)
X02590 06/12/2017 06/16/2017 EB1-07T
- CP HEAT SINK PERFORMANCE
1, 2 IP Heat Sink Performance 7111107T 02/06/2017 02/10/2017 RS 13 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/10/2017 04/14/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/10/2017 04/14/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 04/10/2017 04/14/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 04/10/2017 04/14/2017 71111.08
- INSERVICE INSPECTION 2RF16
2 IP Inservice Inspection Activities - PWR 7111108P 04/10/2017 04/21/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 02/29/2016 15:42:40 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Comanche Peak Inspection / Activity Plan 04/01/2016 - 12/31/2017 EB2-05T
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennia ]
7111105T 06/12/2017 06/16/2017 1, 2 IP Fire Protection [Triennia ]
7111105T 06/26/2017 06/30/2017 EP-1
- IN-OFFICE EP SCENARIO REVIEW
1, 2 IP Exercise Evaluation - Scenario Review 7111408 06/12/2017 07/21/2017 EP-2
- BIENNIAL EP EXERCISE INSPECTION
1, 2 IP Exercise Evaluation 7111401 08/14/2017 08/18/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/14/2017 08/18/2017 EP-3
- EP PERFORMANCE INDICATOR VERIFICATION
1, 2 IP Drill/Exercise Performance 71151-EP01 08/14/2017 08/18/2017 1, 2 IP ERO Readiness 71151-EP02 08/14/2017 08/18/2017 1, 2 IP Alert & Notification System Reliability 71151-EP03 08/14/2017 08/18/2017 71111.08
- INSERVICE INSPECTION 1RF19
1 IP Inservice Inspection Activities - PWR 7111108P 10/16/2017 10/27/2017 RS 24
- RADIATION SAFETY
1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/06/2017 11/10/2017 1, 2 IP Occupational Dose Assessment 71124.04 11/06/2017 11/10/2017 TSB 52B
- BIENNIAL PI&R
1, 2 IP Problem Identification and Resolution 71152B 11/13/2017 11/17/2017 1, 2 IP Problem Identification and Resolution 71152B 12/04/2017 12/08/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.