August 15, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2025005 AND 05000446/2025005)

Dear Ken Peters:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Comanche Peak Nuclear Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely, Ami N. Agrawal, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket Nos. 05000445, 05000446 and 07200074 License No. NPF-87, NPF-89 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Agrawal, Ami on 08/15/25

ML25226A266

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE BC:DORS/PBB NAME AAgrawal SIGNATURE

/RA/

DATE 08/15/25

Site Inspection Activity Plan Comanche Peak 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count CP 2025 INITIAL EXAM

1,2 7/20/2025 8/2/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EP 2025 Biennial Exercise & PI Inspection

1,2 8/11/2025 8/15/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/11/2025 8/15/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 8/11/2025 8/15/2025 IP 71151 001397 Performance Indicator Verification Security Access Control (71130.02), Security Plan Changes (71130.09), PIV (71151)

1,2 8/18/2025 8/22/2025 IP 71130.02 000734 Access Control 1,2 8/18/2025 8/22/2025 IP 71130.09 001656 Security Plan Changes 1,2 8/18/2025 8/22/2025 IP 71151 001338 Performance Indicator Verification CP 2025 Biennial PI&R

1,2 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution Cybersecurity-CP

1,2 10/26/2025 11/1/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP

1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 11/17/2025 11/21/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Security 71130.02/.04/.05

1,2 3/23/2026 3/26/2026 IP 71130.02 000734 Access Control 1,2 3/23/2026 3/26/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/23/2026 3/26/2026 IP 71130.05 000737 Protective Strategy Evaluation 1,2 3/23/2026 3/26/2026 IP 71130.09 001656 Security Plan Changes 1,2 3/23/2026 3/25/2026 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 3/23/2026 3/26/2026 IP 71151 001338 Performance Indicator Verification Inservice Inspection - CP (U2)

2 4/27/2026 5/1/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-1,3,PI - CP

1,2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/27/2026 5/1/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification EP Program & PI Inspection (2026) - CP

1,2 7/20/2026 7/24/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2 7/20/2026 7/24/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System Prepared on 8/13/2025 1:23:14 PM 1 of 3

Site Inspection Activity Plan 1,2 7/20/2026 7/24/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/20/2026 7/24/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 7/20/2026 7/24/2026 IP 71151 001397 Performance Indicator Verification CP 2026 INITIAL EXAM

1,2 6/28/2026 7/4/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 7/26/2026 8/1/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP 5,6,7,8 - CP

1,2 8/3/2026 8/7/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 8/3/2026 8/7/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/3/2026 8/7/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 8/3/2026 8/7/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation CP 2026 BRQ

1,2 10/4/2026 10/10/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Inservice Inspection - CP (U1)

1 10/26/2026 11/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Fire Protection Inspection-CP

1,2 2/22/2027 3/13/2027 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Security 71130.02/.07/.08

1,2 3/8/2027 3/12/2027 IP 71130.02 000734 Access Control 1,2 3/8/2027 3/12/2027 IP 71130.07 000739 Security Training 1,2 3/8/2027 3/12/2027 IP 71130.08 000740 Fitness-For-Duty Program 1,2 3/8/2027 3/12/2027 IP 71130.09 001656 Security Plan Changes 1,2 3/8/2027 3/12/2027 IP 71151 001338 Performance Indicator Verification EP Exercise & PI Inspection (2027) - CP

1,2 5/10/2027 5/14/2027 IP 71114.01 000716 Exercise Evaluation 1,2 5/10/2027 5/14/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 5/10/2027 5/14/2027 IP 71151 001397 Performance Indicator Verification MC&A - CP

1,2 6/21/2027 6/25/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)

CP 2027 INITIAL EXAM

1,2 5/23/2027 5/29/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 6/27/2027 7/3/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Prepared on 8/13/2025 1:23:14 PM 2 of 3

Site Inspection Activity Plan Comanche Peak 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Security 81311

3/8/2027 3/12/2027 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/13/2025 1:23:14 PM 3 of 3