U.S. NUCLEAR REGULATORY COMMISSION 0FFICE OF, INSPECTION AND ENFORCEMENT
-
-
50-443/78-15 Report No.
50-444/78-15 bU-44J Docket No.
50-444 CPPR-135 A
License No. CPPR-136 Priority
--
Category A
Licensee:
Public Service Company of New H3mpshire 1000 Elm Street Manchester, New-Hampshire 03105 Facility Name:
Seabrook Station, Units 1 and 2 Inspection at: Seabrook, New Hampshire and Newington, New Hampshire Inspection conducted:
November 6-9, 1978 Inspectors:
h,
/
/ D
~
e.
5.TFolV4'~ Reacto'r Insppctor date)/ / hf'
ig~ned SC, iceactor Inpector
),/w /L
/ 2/
A.,
dat'e s'ijnje cf, n t< 4 )
/.2/r /*? 3 0.
F.
UurrDoactor Inspector adesined da't Ae A.SG J
.Ii.
a. vareia, Keactor i pector da'te/ signed
-
date signed date signed Approved by: /f/d/Ift
[hh '[S) //. 77 w
R.W.McGaugy,yief,ProjectsSection date signed RC&ES Branch Insoection Summary:
Inspection on November 6-9, 1978 (Report No. 50-443/78-15)
Areas Inspected:
Routine, unannounced inspection by four regional based inspectors of procedures and work activities for safety related piping and components, and containment concrete placement activities.
The inspectors performed a construction site tour and reviewed licensee action on previous inspection findings.
The inspection involved 59 inspector-hours onsite by four NRC regional based inspectors.
Results: No items of noncompliance were identified.
Region I Form 12 7901100f7/
(Rev. April 77)
.
.
.
Inspection on November 6-9, 1978 (Report No. 50-444/78-15)
Areas Inspected:
Routine, unannounced inspection by four regional based inspectors of procedures and work activities for safety related piping and components, con-tainment rebar installation, concrete foundation activities, and site preparation records.
The inspectors performed a construction site tour and reviewed licensee action on previous inspection findings.
The inspection involved 45 inspector-hours onsite by four NRC regional based inspectors.
Results:
No items of noncompliance were identifie.
.
DETAILS 1.
Persons Contacted Yankee Atomic Electric Company Mr. F. W. Bean, Quality Assurance Engineer, Electrical Mr. F. X. Bellini, Geologist
- Mr. P. B. Bohan, Senior Engineer Mr. D. L. Covill, Quality Assurance Field Engineer, Civil Mr. R. S. Faulkner, Jr., Section Leader, Field Monitoring
- Mr. W. J. Gagnon, Quality Assurance Engineer, Mechanical Mr. R. E. Guillette, Quality Assurance Engineer, Electrical (Westborough)
- Mr. J. H. Herrin, Site Manager Mr. F. R. Kotowski, Manager, Educational Center Mr. J. F. Nay, Jr., Quality Assurance Engineer, Mechanical
'
- Mr. R. P. Pizzuti, Construction Manager
- Mr. J. W. Singleton, Field Quality Assurance Manager Mr. A. J. Stewart, Site Geologist Mr. E. Woodman, Blast Monitor United Engineers and Constructors
'
Mr. J. Bray, Facilities Superintendent Mr. R. Brown, Mechanical Liaison Mr. J. Fleming, Field Staff Assistant for Material Control Mr. G. B. Frey, Project Superintendent, Operations Mr. M. Hanson, Liaison Engineer Mr. R. Hawley, Area Superintendent
- Mr. G. W. Kelly, Piping Superintendent Mr. G. Rauchaus, Blast Surveillance Mr. T. B. Vasallo, Jr., Quality Assurance Engineer Mr. N. A. Vitale, Quality Assurance Engineer
- Mr. J. F. Vought, Resident Construction Manager
- Mr. L. R. Wade, Quality Assurance Engineer Mr. J. B. Zabielski, Concrete Superintendent Rcyal Globe Insurance Companies Mr. F. Ruch, Authorized Nuclear Inspector
- Mr. C. O'Sullivan, Authorized Nuclear Inspector
.
Pullman /Higgins (Pipir.q)
- Mr. J. Corcoran, Assistant Resident Manager
- Mr. R. G. Davis, Field Quality Assurance Manager
- Mr. J. P. Rowley, Resident Manager Mr. H. Sinclair, Chief Field Engineer Perini Mr. P. Antonich, Assistant Superintendent, Quality Assurance Mr. E. Brichette, Blast Foreman Mr. P. Bruce, Superintendent, Quality Assurance Mr. J. Cola, Quality Control Engineer Mr. A. J. Coviello, Quality Assurance Inspector Mr. E. Forgione, Field Engineer Mr. W. Gale, Quality Control Engineer Mr. D. Hart, Quality Assurance Inspector Mr. J. McLaughlin, Quality Control Engineer Mr. D. Nelson, Quality Assurance Inspector Mr. R. Salinder, Batch Plant Superintendent Mr. T. Tsivoulis, Cadweld Foreman Mr. R. J. Vachon, Quality Control Engineer Mr. C. Wal ters, Quality Control Engineer The inspector also interviewed other licensee and contractor employees including craft personnel, supervisors,and QC inspectors during this inspection.
- denotes those present at exit interview.
2.
Plant Tour The inspector conducted a walk-through inspection of the construction site and observed completed work, and work in progress.
The areas observed for Unit I were containment building basemat, reactor pit liner, and auxiliary building concrete; in Unit 2, containment building basemat, foundations for the diesel generator and fuel storage buildings.
The inspector examined construction operations for compliance with regulatory requirements and licensee commitments.
No items of noncompliance were identifie.
Licensee Action on Previous Inspection Findings (Closed) Unresolved item (443/78-07-01 and 444/78-07-01): Lack of documentation of concrete temperatures during 24-hour period following the end of protection.
The inspector examined Revision 2 to Perini Quality Assurance Procedure QAP 10.5, which added the requirement to check concrete temperatures on the day following discontinuation of shelter heat.
He also reviewed Perini NCR 115, closed on September 18, 1978, and determined that concrete temperature records, where available, had been checked. Where records were not available, the Perini Lead QA Concrete Inspector had verified that temperature monitoring, during the time periods in question, had been accomplished.
(Closed) Unr.asolved iter (443/77-10-01 arid 444/77-08-01): Clarification of random sampling of car identified in specifications.
The inspector reviewed correspondence covering responsibnities of the Vendor Sur-veillance Representative and also verified Mill Test Reports on grade 60 reinforcing steel.
He observed that rebar conformed to ACI Standard 359-74, section CC-2300, Materials for Reinforcing Systems, as regards acceptance standards under ASTM A615. Additionally, records on tensile tests of cadweld splices indicated that no problem on strength of rebar existed.
The inspector observed, in correspondence from UE&C project manager, that the specification option to require additional random samples of rebar for confirmatory tests was an option only if warranted.
4.
Safety Related Components - Review of QA Procedures and Observation of Work (Units 1 and 2)
a.
The inspector reviewed procedures pertaining to the storage, handling, protection, and receipt and maintenance insnection of safety related components.
Particular attention was paid to documentation and certification requirements, inspection fre-quency and scope, and QA authority relative to the release of equipment for installation. The inspector also checked the procedural requirements regarding the load testing of construction lifting equipment used to handle safety related items.
The above areas were evaluatec against criteria established in the Seabrook Station PSAR, Chapters 3 and 17; ANSI N45.2.2-1972; and Regulatory Guide 1.3 The following documents were included in the review:
UE&C Quality Control Procedures QCP-7-1, Revision 3
--
QCP-7-2
--
QCP-8, Revision 3
--
QCP-13, Revision 6
--
UE&C Field General Construction Procedures
--
FGCP No. 3, Revision 5
--
FGCP No. 9, Revision 2
--
FGCP No. 10, Revision 1
--
FGCP No. 16, Revision 2 UE&C Specification 9763-006-58-2 No items of noncompliance were identified.
b.
The inspector examined the storage condition of selected safety related components located at the Newington, New Hampshire storage facili ty.
He checked the adequacy of personnel access controls, warehouse temperature and humidity controls, dunnage, and material protection and segregation measures.
He verified that the selected items were properly stored, identified, and tagged with the appro-priate UE&C inspection status and that preventive maintenance inspections were being accomplished in accordance with the vendors' maintenance instructions.
The traceability of equipment to its material documentation and to its proper storage location was also spot-checked.
Receiving inspection reports for the selected components were reviewed, and accompanying records checked for completeness.
The certification and qualifications of one UE&C QC Level II storage and handling inspector were examined for conformance to ANSI N45.2.6 requirements.
The inspector also spot-checked the load test certification of two cranes involved in the handling of safety related components.
The above areas were evaluated against criteria established in the references and procedures listed in subparagraph a. above, and the applicable vendors' maintenance and storage recommendations.
Those safety related components, and their associated records, selected for inspection purposes, are listed below.
.
Crosby Valve and Gage Co. Pressurizer Safety Valves
--
(UE&C ID Nos. 1-RC-V-ll6 and 2-RC-V-ll5)
Preventive Maintenance Records and Tags UE&C QC Release Tags Material Receiving Reports Crosby Valve and Gage Co. Packing Lists UE&C Inspection Call Sheets 10107 and 10113 UE&C Receiving Inspection Reports - NSSS Items - Nos. 324 & 351 Crosby Valve and Gage Co. Data Reports (Form NV-1)
--
Pacific Pumps Safety Injection Pumps (UE&C ID Nos. 1-CS-P-2A and 2-CS-P-2A)
Preventive Maintenance Records and Tags UE&C Quality Release Tags UE&C Receiving Inspection Reports - NSSS Items - Nos. 292 & 293 Pacific Pumps Division Manufacturer's Data Reports (Form NPV-1)
Struther Wells Corp. Containment Spray Heat Exchanger
--
(UE&C ID No. 2-CBS-E-16A)
Preventive Maintenance Record and Tag UE&C Hold Tag
-
UE&C NCR 151 UE&C Receiving Inspection Report No. 695 Struther Wells Corp. Manufacturer's Data Report (Form N-1)
Struther Wells Corp. Certificate of Compliance No items of noncompliance were identified; however, one item remains unresolved as discussed below.
The inspector noted that routine storage activities for safety related components often involved the use of gray duct tape for attaching tags or blanking off openings.
Since many safety related components are coated with a gray primer or paint, the use of this tape on those components is in variance with the requirements of ANSI N45.2.2 and Regulatory Guide (RG) 1.38.
Also, the inspectc,.
found that the Letter c' Certification for the "Permacel" tape in question indicated compliance only with ANSI N45.2.2 and not with the requirements of RG 1.38, which differ somewhat from those of the ANSI Standard.
The licensee does, however, commit to RG 1.38 in Chapter 3 of his PSA Interviews with licensee personnel indicated that improperly colored tape could be replaced during ongoing maintenance activities.
Pending licensee action to review the commitment to the require-ments of RG 1.38 regarding tape, and to initiate a program of improperly colored tape replacement, this item is unresolved.
(443/78-15-01 and 444/78-15-01)
c.
The inspector examined the storage condition of four Westinghouse RHR pumps and motors (Storage Level C) and four Southwest Fabri-cating Accumulators (Storage Level D) located on the Seabrook site.
He checked attached preventive maintenance records and quality control release tags and interviewed the responsible UE&C material control engineer concerning storaca requirements at the Seabrook site.
Nitrogen inerting pressure indications for the accumulators were spot-checked.
No items of noncompliance were identified.
5.
Safe _ty Related Piping - Observation of Work - (Units 1 and 2)
The inspector observed the handling, placement, and pipe coating activities of the buried Service Water piping for spool Nos.1 CW-1801-3-153-24, 2-SW-1801-3-153-24, and 2-SW-1802-3-153-24.
He verified that the foregoing activities were being performed in accordance with UE&C Specification No. 9763-006-248-51, Revision 3.
A visual examination of the fabrication shop coating disclosed what appeared to be repair areas that do not meet the requirements of Specification No. 9763-006-248-2, Revision 2, paragraph 3.5.3.11.
The areas in question present a non-uniform surface to which a tar-like substant, has been applied.
The tar-like substance has approximately 1/8" deep cracks in it, with no evidence of the required asbestos felt or glass matting bonded to it.
This item is considered unresolved pending further evaluation of the condition by the licensee.
(443/78-15-02 and 444/78-15-02)
He also observed the magnetic particle testing of the Unit 1,24" diameter, nuclear class 3, service water pipe weld No. F0204, Isometric Drawing No. 1801-02. He verified that the test technicians were performing the test in accordance with procedure No. PPP-lX-MT-W77, dated July 17, 1978.
No items of noncompliance were identifie.
A hydrostatic test of the service water pipe system 2-SW-1801-03-24 in Unit 2 was. witnessed by the inspector. He examined the test engineer's procedures, Piping Test No. SW-4, and verified that the test was being performed in accordance with them.
No items of noncompliance were identified.
6.
RCPB and Safety Related Piping - Review of Ouality Assurance Implementing Procedures (Units 1 and 2 A review was performed of the licensee's quality assurance program for piping installation and welding.
The ' view veiified that selected portions of the program meet the requinments of the PSAR, the ASME III Code, and regulatory requirements.
The following documents were reviewed:
UE&C Soecifications No. 9763-006-248-51, Assembly and Erection of Piping and Mechanical
--
Equipment No. 9763-006-248-1, Shop Fabricated Piping
--
No. 9763-006-248-2, Fabrication of Cement-Lined and Nonferrous
--
Piping No. 9763-MPS-1, Materials and Processing Requirements (Nuclear)
--
No. 9763-WS-1, Welding and NDE for Nuclear Pressure Components and
--
Nuclear Plant Piping No. 9763-QAS-1, Quality Assurance Administrative System for Nuclear
--
Safety Class Items Pullman Power Products
--
Quality Assurance Manual The review verified that the licensee has established control in the following areas: organization, quality requiremt,ts, materials, processes,
corrective action for adverse conditions, documen'e. tests, and quality records.
No items of noncompliance were identifie.
.
7.
Unit No.1 Containment Structural Concrete - Observation of Quality Control and Work Performance / Reactor Basemat Concrete Placement The inspector observed work being performed in preparation for, during, and following structural concrete placement for Unit 1 reactor basemat, lift No. 1-CM-7A on November 9, 1973.
A total of 860 cubic yards of a special 4,000 psi concrete mix was: placed by pumping directly into final location to overcome reba'r congestion in the bottom lift of the recirculation sump pit, By direct observation and independent evaluation of work performance, work in progress and work completed, the required work and inspection activities were ascertained being accomplished according to applicable specifications, codes, standards,
NRC requirements and SAR commitments.
The inspector verified that activities were accomplished according to criteria identified in the following:
Seabrook Station PSAR, Chapter 17, and Section 3.8 which included
--
referenced codes and standards Job Specification 9763-13-2, Revision 3, November 14, 1977,
--
Containment Concrete Work Job Specification 9763-006-5-1, Revision 3, October 10, 1977,
--
Civil Testing Facility and Services Job Specification 9763-006-69-1, Revision 5, October 12, 1977,
--
Concrete Batch Plant PPC Quality Control Procedures:
--
-
QAP 10.3, Cadwelding Inspection QAP 10.4, Concrete Batching, Delivery
-
QAP 10.5, Concrete Pre-placement and Post-placement Inspection
-
QAP 2.0, Qualification and Certification of QA Personnel
-
-
QAP 10.0, Qualification and Certification of Concrete Production Facilities
-
QAP 10.1, Testing of Concrete Materials and Concrete
,
PPC Civil Construction Procedures:
--
FCCP 1, Concrete Batch Plant Operation
-
-
FCCP 2, Form, Work and Handling, Placing, Curing, Finishing and Repair of Concrete PTL Quality Control Procedure QC-FSTC-1, Field Sampling and
--
Testing of Concrete and, PQ-2 Qualifications for Inspection and Testing Personnel The inspector observed quality control personnel inspecting concrete activities and verified the following activities:
--
Concrete Planning: preparation and orientation / training of personnel.
Rebar adequately installed and cadweld splices inspected and
--
tested.
--
Construction joint preparation and water stop installation conforms to drawings and specifications.
--
Preplacement Preparation and Inspection Report: check out card sign-off by craft supervisors; field engineer check-out and signature; incomplete item on clean-up, closed; identification of specific items inspected, QC inspection signed and, as required, signature of authorized code inspector; release of pour by area engineer and QC engineer; approval by UE&C field engineer and resident engineer for placement.
Delivery and Placement:
proper mix specified; proper mix batched
--
and transported to pump stations; testing at truck discharge to meet acceptance criteria - some loads had withheld water added to truck and were adequately remixed; concrete pumped thru steel pipe and rubber hose, controlled and documented for temperature, slump and air; testing at end of pump line and casting of cylinders for compress ve strength, by qualified personnel using calibrated equipment; adequate crew and equipment applied with coordination and QC control; field engineering and craft supervision fulfill requirements of special procedure on concrete placing scheme and placing controls using details identified; adequate number of craft personnel handling pump line and vibrators; consolidation of concrete conforms to ACI 30.
Batch Plant Operation: accura' > of material and temperature
--
control; generation and control of batch records / truck tickets; QC inspection for frequency and scope, using qualified inspectors and QC personnel.
Aggregate and Cement Storage: cement was observed arriving by
--
train in bulk and pumped to storage adequately protected from moisture; aggregate storage bins of adequate height, size, separation, and without segregation; extraction accomplished by tunnel beneath concrete siab.
Adequate curing of concrete where vertical forms were removed,
--
and on horizontal construction joints of basemat pour completed previous week was observed.
8.
Unit No. 2 Containment Base Mat Rebar Installatien and Cadwelding -
Observation of Quality Control and Work Performar e, e
The inspector observed work being performed in ree.e installation and cadweld splicing for Unit 2 base mat.
Tae inspector verified that required work and inspection activities are oeing accomplished according to criteria identified in the following:
Seabrook Station PSAR Section 3.8 and its referenced codes and
--
standards, and Chapter 17 Job Specification 006-5-1, Revision 3, October 10, 1977, Civil
--
Testing Faci" and Services, Section 5
--
PPC Quality Control Procedure QAP 10.2, Reinforcing Steel Placement Inspection
--
PPC Quality Control Procedure QAP 10.3, Cadwalding Inspection PPC Civil Construction Procedure FCCP-7, Mechanical Splicing
--
of Reinforcing Bars by the Cadweld Method ERIC0 Publication RB 10M 974
--
Cadweld splices of the 553 series for number 18 rebar in the recircu-lation sump pit were observed by the inspector, for these activities:
.
.
rebar installed in third layer of the base mat; preparation of the bars by operators number 27 and 28; assembly of proper splice sleeve /
QC inspected and documented for preheating, cleaning, witness marks, sleeve centering; splice ends packed, clamps and fittings secured; crucible and pouring basin cleaned, tightened over sleeve with aluminum guide tube and ceramic insert in sleeve tap hole; proper cartridge of filler metal powder remixed and placed in the crucible after steel disc was inserted and, starting powder placed over the filler metal powder and on the top edge of the crucible extension; flint-gun firing was observed to ignite the powder and initiate the exothermic reaction; after removal of crucible and hardware, cleaning of sleeve ends and breaking off the riser the sleeve was examined for end of sleeve voids, filler metal visible in tap hole and checked for centering.
The QC inspector was observed documenting his findings and marking the splice with its unique number as acceptable and for location on as-built cadweld map.
Completed rebar splices were inspected and physical measurements were made by the NRC inspector.
Splices in the 553 series were found acceptable for witness marks, cleaning, centering, splice identified, packing removed, end voids, and filler metal visible in tap hole.
No items of noncompliance were identified.
9.
Unit No. 2 Observation of Quality Control and Work Activities in F111 Concrete Placement for Foundation of Reactor Pit The inspector observed work being performed Movember 7,1978
~
during fill concrete placement for the base mat. Lift No. %-CM-1B, using a 3,000 psi approved concrete mix.
By direct observation and independent evaluation of perfcrmance of the work and the completed work November 8,1978, the inspector ascertained these activities were accomplished according to applicable spec;fications, codes, standards, NRC requirements and SAR cocinitments:
--
Preplacement Preparation, signed-off check out card Concrete Preplacement Inspection Report, completed and signed
--
by QC inspector The inspector also observed batch plant mixing, truck delivery,
--
testing, Creter crane transporting to forms, depositing and con-solidating of concrete. The inspector verified that adequate work activities and QC inspection requirements were accomplished for the appropriate details as identified in paragraph 1 of these details.
No items of noncompliance were identifie.
.
.
.
10. Observation of Blast Monitoring to Control Detrimental Vibration Effects on Curing Concrete - Units 1 and 2)
The inspector observed controls of blasting and blast monitoring to determine the effects on green concrete.
The inspector interviewed UE&C field engineer, QC surveillance engineer and YAEC personnel in charge of blast monitoring.
Blast records, including number of holes, loading and number of delays, were reviewed prior to blasting.
Blast monitoring tapes and records after blasting were found to conform to the peak particle velocity limitations required to preclude detrimental vibration effects on green concrete.
No items of noncompliance were identified.
11. Rock Excavations - Observation of Final Preparations and Status of Geologic Mapping - Unit 2 The inspector ascertained that field work for geologic mapping of rock in Unit 2 safety related excavations is essentially complete. Office compilation of data analysis and report writing is in progress.
Progress charts were reviewed and discussed with responsible YAEC site geologists.
Mapping along fault traces where additional excavation of over burden was made are completed.
Pending issue of a final report an interim report is expected in spring of 1979.
No items of noncompliance were identified.
12.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of non-compliante, or deviations.
Unresolved items disclosed during this inspection are discussed in Paragraphs 4 and 5 of this report.
13.
Exit Interview The inspector met with the licensee and contractor representatives (denoted in Paragraph 1) at the conclusion of the inspection on November, 9 1978.
The inspector summarized the scope and findings of the inspection.