IR 05000440/1992022
| ML20127M904 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/25/1993 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stratman R CENTERIOR ENERGY |
| References | |
| NUDOCS 9301290045 | |
| Download: ML20127M904 (2) | |
Text
_ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ - _.
kb( pCh ((,f@)
(
r
'
e t800g s
UNITED STATES p
f,,
NUCLEAR REGULATORY COMMISslON
,,
,
y, ntoloN til
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-440/92022(DRP))
!
Dear Mr. Stratman:
l l
This will acknowledge receipt of your letter dated January 8,1993, in
response to our letter dated December 10, 1992, transmitting a Notice of l
Violation associated with the failure to enter technical specification (TS) 3.0.3 and comply with the associated action statement when secondary
!
containment bypass leakage TS limits were exceeded at the Perry Nuclear Power i
Plant.
We have reviewed your corrective actions and have no further questions at this time.
These corrective actions will be examined during future
l inspections.
Sincerely,
A)j, C;k w.
L. Robert Greger, Chief Reactor Projects Branch 3 l
l l
See Attached Distributioni 9301290045 930125 PDR ADOCK'05000440
/
G PDR
'\\ o
-.
.
-
t'l
,
JAN 2 51993
'
Centerior Service Company
Distribution cc:
f. R. Stead, Director, Nuclear Support Department D. P. Igyarto, General Manager, Perry Nuclear Power Plants Kevin P. Donovan, Manager Licensing and Compliance Section S. F. Kensicki, Director, Perry Nuclear Engineering Dept.
H. Ray Caldwell, General Superintendent Nuclear Operations DCD/DCB(RIDS)
Licensing fee & Debt Collection Branch Resident Inspector, RI!!
Terry J. Lodge, Esq.
James R. Williams, State of Ohio Robert E. Owen, Ohio Department of Health A. Grandjean, State of Ohio, Public Utilities Commission Clinton SRI
b