IR 05000424/2015403
| ML15209A678 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/28/2015 |
| From: | Shane Sandal NRC/RGN-II/DRP/RPB2 |
| To: | Taber B Southern Nuclear Operating Co |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2015403 | |
| Download: ML15209A678 (4) | |
Text
July 28, 2015
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT-U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000424/2015403 AND 05000425/2015403
Dear Mr. Taber:
On July 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Vogtle Electric Generating Plant, Units 1 and 2. On July 20, 2015, the inspection results were discussed with you and other members of your staff. The results of this inspection are documented in the enclosed inspection report (IR). The NRC inspector did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System; accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Shane Sandal, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81
Enclosure:
IR 05000424/2015403 and 05000425/2015403 w/Attachment: Supplementary Information
cc: Distribution via Listserv
ML15209A678 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP/PB2 RII:DRP/PB2
SIGNATURE LXC via e-mail SRS5
NAME L.M. Cain S. Sandal
DATE 7/ 28 /2015 7/ 28 /2015
E-MAIL COPY YES NO YES NO cc:
Stephen P. McGavin Fleet Security Director Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242
Michael P. Long Fleet Nuclear Security Operations Manager 40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242
Steven M. Shipman Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242