{{#Wiki_filter:- W . . nt:g, UNITED STATES , a), NUCLEAR REGULATORY COMMISSION $ I REGION 11 101 MARIETTA ST., N.W., SUITE 3100 0, s % ATLANTA, GEORGIA 30303 s
Report Nos. 50-424/82-08, 50-425/82-08 Licensee: Georgia Power Company 270 Peachtree Street Atlanta, Georgia 30303 Facility Name: Plant Vogtle Docket Nos. 50-424, 50-425 License Nos. CPPR-108, CPPR-109 Inspection at Vogtle site near Waynesboro, Georgia Inspector:
- I8. [[/
M/f.2.
/ [ Tate Signed A. B. Ruff ' / 5'- 7 - 73 - Approved by:_T. E. Conlon, Section Chief Date Signed Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on April 27-30, 1982 . Areas Inspected This routine, unannounced inspection involved 29 inspector-hours on site in the areas of review of construction phase quality assurance implementing procedures for class IE equipment and systems, observation of in place storage of class 1E equipment, licensee identified items, concrete placement around the steel containment liner, and drilling operations around plant Vogtle site to obtain seil core samples.
Results Of the areas inspected, no violations or deviations were identified.
8206070
0
PDR ADO ppg Q
- . . REPORT DETAILS 1.
Persons Contacted Licensee Employees
- H. H. Gregory, III, Construction Project Manager
- E. D. Grover, Quality Assurance Site Supervisor
- M. H. Googe, Assistant Construction Project Manager
- R. W. McManus, Manager Quality Control
- C. M. Burke, QA Field Representative C. Sarver, QA Field Representative NRC Resident Inspector
- W. F. Sanders
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on April 30, 1982,,dth those persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items i Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort (Unit 1 and 2) The inspector toured the site and examined the in place storage of approximately 14 class 1E motors, motor-operated valves and electrical . panels. All items were adequately protected, heaters and/or heat lamps were installed to control humidity. A portion of a concrete pour around steel containment liner for Unit I was witnessed and drilling operations to obtain soil core sample around plant Vogtle site was observed.
Within the areas examined, no violations or deviations were identified.
6.
Licensee Identified Items a.
(Closed) Item 50-424/80-15-02, " Hydrogen Recombiner Power Transformer Not Qualified as Class 1E."
(10 CFR 50.55(e)). The final report was submitted December 20, 1980.
The report has been reviewed and determined to be acceptable. The inspector held discussions with
.. .
responsible licensee representatives and reviewed supporting documentation to verify that subject unit was returned to the vendor.
This item was returned to the vendor in accordance with Westinghouse shipping authorization GAE-L-007 and miscellaneous Daily Report 205245M of November 18, 1980.
7.
Electrical (Components and Systems, Cables and Terminations) Review of Quality Assurance Implementing Procedures.
The following procedures, applicable to electrical construction activities were reviewed: GD-A-30 Rev. 3, Receipt, Receipt Inspection, Storage and Handling Spec X3AR01 Section E-11, Storage and Protection of Equipment and Materials GD-T-09 Rev. 2, Inspection of Items in Storage and Storage Areas ED-T-04 Rev. 2, Installation of Major Electrical Equipment Spec X3AR01 Section E12 Installation Procedure for Electrical Equipment.
WH-A-01 Rev. 3, Material Issue ED-T-02 Rev. 3, Raceway Installation Spec X3AR01 Section E8, Raceway Systems ED-T-08 Rev.1, Cable Termination ED-T-07 Rev. 2, Cable Installation Spec. X3AR01 Section E9, Cable Installation and Cable Termination EDT-09 Rev.1, Insulation Tests GD-T-01, Rev. 8, Nonconformance Control This review was to insure that procedures covered SAR requirements in the areas of receipt inspection, handling and storage, installation, inspection and construction testing, material and component identification, raceway separation and protection, cable redunancy and separation, raceway loading and nonconformance control. Within the areas reviewed, no item violations or deviations were identified.
. }}