Text
_
-
..
_.
,
-
,
'o,
~
UNITED STATES
'8" NUCLEAR REGULATORY COMMISSION
,,
$
E REGION 11 101 MARIETTA ST., N.W., SulTE 3100 o,
-
ATLANTA, GEORGIA 30303 s
Report Nos. 50-424/82-01 and 50-425/82-01 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30303 Facility Name:
Vogtle Docket Nos. 50-424 and 50-425 License Nos. CPPR-108 and CPPR-109 Inspection at Vogtle Site near)faynesboro, GA Inspector:
/ t. 2
Approved by:
/-
Z h
T. E. Coni,. Section Chief Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on January 5-7, 1982 Areas Inspected This routine, unannounced inspection involved.21 inspector-hours on site in the areas of licensee action on previous inspection findings, stiuctural concrete and foundations work activities, the soils and concrete lab, and nonconformance and work stoppage controls.
Results Of the areas inspected, no violations or deviations were identifled.
8202220263 020129 PDR ADOCK 05000424 G
- n
.
REPORT DETAILS 1.
Persons Contacted
. Licensee Employees
- E. D. Groover, QA Site Supervisor
- R. Allen, Assistant Construction Project Manager
- C. Hayes, Project QA~ Manager-
- R.-McManus, Manager of Quality Control.
- D. ' Foster, Project General Manager
- W. T. Nickerson, Manager of Nuclear Construction
- M. H. Googe, Manager of Field Operations
- H. H. Gregory, III, Project Manager
- B. C..Harbin, Civil QC Section Supervisor D. Innis, Civil Engineer J. Seagreaves, Civil QC Supervisor
- L. Hatcher Soils and Concrete Lab Supervisor Other licensee employees contacted included 10 civil QC inspectors.
NRC Resident Inspector
- W. F. Sanders
- Attended exit interview 2.
Exit Interview The inspection scope and findings were-summarized on January 7,-1982 with those persons indicated in paragraph I above.
3.
Licensee Action on Previous Inspection Findings (Closed) Violation (424/81-09-01 and 425/81-09-01):
Failure to Maintain -
Sufficient QA Records in the - Area of Concrete Testin" The inspector examined-the licensee's response to this violation dated November 3,1981 and' implementation of the corrective action stated in the response. The inspector reviewed the Concrete Testing Pour Test Part I form.
This form has been revised to include a block for the inspector performing the
,
cylinder strength test ' to _ initial.
The inspector reviewed completed test
records for concrete mix numbers 411 and 511 tested in December 1981 and verified that this block is being used to record the identification of inspectors performing the concrete cylinder strength test. 'The licensee instructed inspectors who perform ir, process tests (slump, air, and unit l
weight) on plastic concrete to initial the Concrete Placement Pour Log form.
l The inspector reviewed selected Concrete Placement Pour Logs for some
concrete placements made in December 1981 and verified that the identi-fication of inspector performing the in process tests on plastic concrete is
being recorded on these records. This item is closed.
-
i e
i
.
-
-
-
-.
. _..
-
-_
..
-
..
<
,
.
h
t 4.
Unresolved Items Unresolved items were not identified during this inspection.
,
.
-
t 5.
Independent I" nection Effort
'
f The inspector examined the following:
a.
Soils and concrete laboratory and currentness of calibration of labora-tory equipment.
b.
Concrete batch plant.
c.
Storage of reinforcing steel.
.i.
d.
Procedure-number GD-T-01, "Nonconformance Control".
!
,
e.
Procedure number GD-T-07, " Work Stoppage".
-f.
Stop Work Notices SW-C-01 through SW-C-34 and SW-C-36 through SW-C-39.
The inspector made a detailed review of the corrective action to disposition stop work notice number SW-C-39 which was written to stop concrete placement in the power block. The corrective action included
,
l retraining of craft personnel, re-emphasis of concrete placement i
~ inspection requirements to civil QC inspectors, and implementation of a l
periodic (approximately once a week) critique of a ' selected concrete
'
placement to identify and correct problems dealing with placement and inspection of concrete. The retraining of personnel was completed the day after the stop work order was written. The inspector discussed the
'
reasons for the stop work order and the corrective actions with QC and management personnel.
This item was reviewed by the licensee's QA staff who determined that it was not reportable to NRC. The inspector
concurs with this finding.
,
l No violations or unresolved items were identified.
6.
Site Preparation and Foundations - Observation of Work and Work Activities -
,
i Unit 1
The inspector witnessed placement, compaction, and inspection of fill
.
between the Unit I auxiliary building and the Unit I east Nuclear Service
!
Water Cooling Tower. Acceptance criteria examined by the inspector appears in the following documents:
a.
Section 2c of the PSAR.
>
i b.
Bechtel Specification X2AB01, " Site Preparation and Earthwork" l
c.
Georgia Power Procedure CD-T-01, " Earth Work Quality Control" l
'
The fill material was placed and compacted at the specified moisture content. Lift thickness did not exceed the maximum allowed by the proce-dares. All fill operations were continuously monitored by QC inspectors.
,
- - - - -
,
,
,,,
,
.
.
.
'
No deviations or viol'ations were identified.
7.
Containment (Structural Concrete 'II) - Observation of Work and ' Work Activities - Unit 1
,
The. inspector observed placement of ~ pour. number 1-01C-026, the primary
. shield wall, and partial placement of pour numbers A-11A-023 and A-11A-072, exterior walls in the control building. The inspector also made a detailed review of installation and inspection of reinforcing steel for the primary.
shield wall placement (pour number 1-01C-026).
)
Acceptance criteria examined by the inspector appear in the following.
!
documents:
a.
Bechtel Specification X2AP01, " Forming, Placing, Finishing, and Curing Concrete".
b.
Georgia Power Procedure CD-T-02, " Concrete Quality Control".
c.
Bechtel drawing numbers 1POIP143 through IPOIP148,'" Containment Struc-ture - Unit 1 - Primary Shield Wall Reinforcing Details" d.
Design Change Notices (DCN) number DCN 5 and 6 to drawing number IPOIP144, DCN 1 and 2 to drawing number IP0IP146, and DCN 1 to drawing number IPOIP146.
e.
Field Change Request (FCR). numbers FCR 1889, FCR 1912, FCR 2372, FCR 2383, FCR 2537, FCR 2580 and FCR 2583.
f.
PSAR Section 3.8.
The inspector verified that the reinforcing steel was installed ' for the~.
primary shield wall pour as per the requirements shown on the drawings, FCRs and DCNs. The inspector measured spacing of the rebar, and distance from the face of the forms to the rebar. The inspector verified that'the proper number and size of bars had been installed.
The inspector discussed inspector requirements and acceptance criteria used in the rebar inspection with the civil QC inspectors responsible for performing the primary shield wall reinforcing steel inspections. The inspector verified that QC inspec-turs were using the current revisions of the drawings in performance of '
their inspections.
During observation of the concrete placements, the inspector verified forms were tight and clean, and that rebar and embeds were securely anchored an'd clean.
Placement activities pertaining to delivery time, free fall, flow distance and consolidation conformed to procedure requirements.
Concrete placement activities were continuously monitored by QC inspectors. Exami-nation of batch tickets indicated that the specified design mix was being delivered.
Samples of plastic cor. rete were - being obtained from the con-crete truck and tested in accordance with procedure requirements. Samples
...
.-...
of plastic concrete were also being obtained from the pumpline discharge for correlation testing.
Test results indicated that plastic concrete being placed met the procedure requirements for slump, air content, and temperature.
QC inspectors were interviewed regarding procedure and their inspection requirements.
No violations or deviations were identified.
8.
Containment (Prestr2ssing) - Observation of Work and Work Activit
-
Unit 1 The inspector observed installation of duct sheathing for the containment building tendons. Joints connecting sections of the sheathing were mortar tight. The inspector discussed QC inspection requirements regarding instal-lation of sheathing and trumpets with civil QC inspectors, and discussed survey controls for layout and location of the duct sheathing with sur-veyors.
Acceptance criteria examined by the inspector appears in the following documents:
'
a.
Georgia Power Procedure CD-T-20, " Installation and Inspection of Trumpets, Rigid Extensions, and Duct Sheathing".
b.
VSL drawing number PT 10.1 through 10.3, PT 11.1 through 11.3, PT 14.1 through 14.3, PT 15.1 through 15.3, PT 29.1 through 29.2, PT 30.1 through 30.5, and PT 31.1 through 31.11.
c.
PSAR Section 3.8.
No violations or deviations were identified.
l l
l
!
w