ML20053D794
| ML20053D794 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/11/1982 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20053D795 | List: |
| References | |
| NUDOCS 8206070328 | |
| Download: ML20053D794 (2) | |
See also: IR 05000424/1982008
Text
-
y //en)
t
,
.
.
MAY 11 1982
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
Subject: Report Nos. __50-424/82-08, 50-425/82-08
This refers to the routine safety inspection condu'cted by Mr. A. B. Ruff of this
office on April 27-30, 1982, of activities authorized by NRC Construction Permit
Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant . facility and to the
discussion of our findings held with Mr. H. H. Gregory, III, Construction Project
Manager, at the conclusion of the inspection.
Areas examined during the inspection _ and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
'
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with-the requirements
,
[
Should you have any questions concerning this letter, we will be glad to discuss
!
them with you.
Sincerely,
-
H. C. Dance, Chief
,
i
Reactor Projects Branch 2
l
Division of Project and
Resident Programs
l'
Enclosure (See Page 2)
,
TN
A
!
ffol
.
-
.
-
.
.
.
. .
-
-
.-
.
Georgia Power Company
2
1
Enclosure:
Inspection Report Nos. 50-424/82-08,
50-425/82-08
cc w/ encl:
H. H. Gregory, III, Construction
-
Project Manager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General Manager
l
M. Manry, Plant Manager
bec w/ encl:
Document Management Branch
State of Georgia
NRC Resident Inspector
.
l
l
RII
RII
RII
RII
RII
l
ABRuff:es
TEConlon
ARHerdt
JRogge
HCDance
5/ /82
5/ /82
5/ /82
5/ /82
5/ /82
!
l
,
I
L