ML20053D794

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/82-08 & 50-425/82-08 on 820427-30.No Noncompliance Noted
ML20053D794
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/11/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20053D795 List:
References
NUDOCS 8206070328
Download: ML20053D794 (2)


See also: IR 05000424/1982008

Text

-

y //en)

t

,

.

.

MAY 11 1982

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos. __50-424/82-08, 50-425/82-08

This refers to the routine safety inspection condu'cted by Mr. A. B. Ruff of this

office on April 27-30, 1982, of activities authorized by NRC Construction Permit

Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant . facility and to the

discussion of our findings held with Mr. H. H. Gregory, III, Construction Project

Manager, at the conclusion of the inspection.

Areas examined during the inspection _ and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

'

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with-the requirements

of 10 CFR 2.790(b)(1).

,

[

Should you have any questions concerning this letter, we will be glad to discuss

!

them with you.

Sincerely,

-

H. C. Dance, Chief

,

i

Reactor Projects Branch 2

l

Division of Project and

Resident Programs

l'

Enclosure (See Page 2)

,

TN

A

!

ffol

.

-

.

-

.

.

.

. .

-

-

.-

.

Georgia Power Company

2

1

Enclosure:

Inspection Report Nos. 50-424/82-08,

50-425/82-08

cc w/ encl:

H. H. Gregory, III, Construction

-

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

l

M. Manry, Plant Manager

bec w/ encl:

Document Management Branch

State of Georgia

NRC Resident Inspector

.

l

l

RII

RII

RII

RII

RII

l

ABRuff:es

TEConlon

ARHerdt

JRogge

HCDance

5/ /82

5/ /82

5/ /82

5/ /82

5/ /82

!

l

,

I

L