ML20041A522

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/82-01 & 50-425/82-01 on 820105-07.No Noncompliance Noted
ML20041A522
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/29/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20041A523 List:
References
NUDOCS 8202220252
Download: ML20041A522 (2)


See also: IR 05000424/1982001

Text

e/ba)

-

-

-

.

J A N 2 91882

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

p ^l:9,p/cN

Executive Vice President

N

P. O. Box 4545

8

Y

\\

Atlanta, GA 30302

l7-

_

g

']

Gentlemen:

FEg o

,4

r; i-

. '>

Subject: Report Nos.h24/82-kand 50-425/82-01

~

~

This refers to the routine safety inspection conducted by Mr.- J. J. Lenahan of

this office on January 5-7,

1982, of activities authorized by NRC Construction

Permit Nos. CPPR-103 and CPPR-109 for the Vogtle facility and to the 6iscussion

of our findings held with Mr. H. H. Gregory, III, Project Manager, at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinat!ons of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

PXe

P. J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

8202220252 820129

PDR ADOCK 05000424

O

PDR

,

>t

1

.

.

'

JAN 291 sag

Georgia Power Company

2

Enclosure:

Inspection Report Nos. 50-424/s2-01

and 50-425/82-01

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Georgia

I eg

j

g[g

JJLenahan:aw

TEConlon

b CEMu

y

JFFrogge

PJKellogg

oig/s2

oig/82

o1982

01/4 /s2

oinys2

_

,