IE Insp Repts 50-416/77-04 & 50-417/77-04 on 770419-22. Noncompliance Noted:Failure to Follow Procedures for Protection of Installed Equipment
ML19209A069
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/13/1977
From: Blake J, Mcfarland C, Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19209A061 List:
References
50-416-77-04, 50-416-77-4, 50-417-77-04, 50-417-77-4, NUDOCS 7910010840
Download: ML19209A069 (3)


Text

$, y'3.,, y [ 1

  • nt cios si

/,.. E 230 PE ACHI R E E ST R E E T.' N.W. SUITE 1

%,[%,g/

.

f ATL ANTA, GE oRGI A 30303 o,,

'

.

  • ,...*

~

Appendix B Report Nos.:

50-416/77-4 and 50-417/77-4 Docket Nos.:

50-416 and 50-417 License Nos.:

CPPR-118 and CPPR-119,

.

Categories:

A2/A2 Licensce:

Mississippi 2.wer and Light Cocpany Post Of fice Box 1640 Jackson, Mississippi 39205 Facility Name:

Grand Gulf Nuclear Station, Units 1 and 2

?

Inspection at:

Grand Gulf, Mississippi

!

Inspection conducted:

April 19-22, 1977 Inspector-in-Charge:

C. R. McFarland, Principal Inspector

,

Projects Section Reactor Construction and Engineering Support Branch Acco puying luagectors:

J. J. Elake, Metallurgical Engineer Engineering Support Section No. 2 Reactor Construction and Engineering Support Branc Other Accompanying Personnel:

?one

Reviewed by:

- My r

C. E. Murphy,(Chief g at Reactor Construction and Engineering Support Branch Incpection Sut ary Inspection on n.il 19-22, 1977 Areas Inspected:

Resolution of 10 CFR 50.55(e) iters; new 55(e) item -

cable tray supports; procedures for structural backfill; administrative control of open items list; QA canual including QC prccedures for safety related structures and supports; work performance on safety related piping; protection of installed caterial and equipment.

"Ihe inspection involved 52 inspector-hours on site by two NRC inspectors.

Results: Of the seven areas inspected, no apparent items of noncom-pliance or deviations were identified in six areas; one apparent ite= of noncompliance (infraction-failure to follow procedures for protection of installed equipment - Details II, paragraph 4) was identified in one area.

.

!

I 19100 10$9g 1033 i

.

.

-

IE Ept. No r. 50-416/77-4 apd 50-417/77-4 I-1

,

.

-

DETAILS I Prepared by:

.

[

h +7

'h C. R. McFarland, Principal Inspector Date Projects Section Reactor Construction and Engineering Support Branch Datesofhhspection: April 19-22, 1977

-

Reviewed by:

[ g~

O

J. C. Bryant, Chief Q

Dat e

,

Projects Section Reactor Construction and Engineering Support Branch t

1.

---Persons Contacted a.

Mississippi Power and Light Company (MP6L)

  • T. E. Reaves, Jr. - Manager of Quality Assurance (QA)

J. E. Wieberly - Nuc1 car Construction Supervisor

-

  • P.

W.

Sly - QA Field Supervisor C.

E.

Onborn - Civil QA R4 prosentative

  • S. F. Tanner - Welding and NDE QA Representative b.

Contractor Organization Bechtel Power Corporation (Bethtel)

  • P.

J. Bender - Field QA Supervisor R. R. Brewer - Civil QA Engineer L. D. Herren - Field Electrical Engineer, Control Building R. McCorkle - Field Electrical Engineer, Centrol Building

  • Denotes those present at the exit interview.

2.

Licensee Action on Previous Inspection Findings a.

(Closed) Unresolved Item 77-1/1 Unincorporated Drawing Change Notices, 10 CFR 50.55(e), Units 1 and 2 Reports 19 The inspector reviewed Management Corrective Ar

'aa and 20 and other docunentation that confirns ti..

'rcation in the MP&L Ictter to IE:II dated April 8, 1977 a.. cheir conclusion that the item is not a reportable significant de-ficiency as defined by 10 CFR 50.55(e).

The original concern was that the work plans used to control work at the point of i

1C33

'

.

.

.

IE Rpt. 1:os. SC 16/77-4

'

and 50-417/77-4 I-2

~

i,

,,

the work operation did not in all cases include the latest drawings and specification revisions.

The review by Bechtel and MP&L indicates that no construction deficiency which, were it to remain uncorrected, could have effected adversely the saf ety of operatio'ns of the nuclear power plant at any time throughout the expected lifetime of the plant.~ 1io items of noncompliance were identified.

This item is closed.

(_ Closed) Unresolved Item 76-6/4 Rebar Dowels, 10 CFR 50.55(e h Unit 1 The inspector reviewed the doc entation noted below that confirms the information in the MP&L letter to IE:II dated April 15, 1977 and their conclusion that the item is not a reportable significant deficiency as defined by 10 CFR 50.55(e):

!

(1) Bechtel Drawing C-1733, Units 1 and 2 Standby Service l

Water (SSW) Cooling Tower Basin Reinforced Concrete -

Kall Sections and Details (2) Bethlehem Steel Corporation Drawing 5931-DF104 Shear Ties SSW Cooling Tower-Basin A (3) QA Is truction ?;o. 73 Reinsta11ation ?otice irn.rd D.c. Ger 3, 1976 (4)

Construction Procedure Manual Section 3.3.2.4 Reinstalla-tion Work (5) QC Instruction 9.1 Inspection and Test, Revisions 4 and 5 (6) MP6L QA file (including audit of Bechtel QC engineering review of Work Plan and Ins;ection Records and design drawing related to che rehar dowel deficiency)

(7) Bechtel QA file of surveillance of corrective actions (8) Bechtel letter to MP6L dated April 18, 1977 1;o items of noncompliance were identified.

This item is closed.

(open) Unresolved Item 76-6/5 keactor Vessel Welds, c.

10 CFR 50.55(e), Unit 2 The inspector reviewed the documentation issued to date and discussed the corrective actions with the QA ranager.

MP&L is scheduled ;o submit a final report by June 1,1977.