ML19209A060

From kanterella
Jump to navigation Jump to search
Forwards Info to Show Resolution of Incorrect Reinforcing Steel Placement in Cooling Tower Basin.Ie Insp Has Shown Problem Not to Be Reportable Deficiency
ML19209A060
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/18/1978
From: Reinmuth G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19209A061 List:
References
NUDOCS 7910010833
Download: ML19209A060 (2)


Text

wem R

s l

P00R BRBlML Occket No. 50-410/417 JUL 181973 i

i MEMORNtDU;i FOR: John F. Stolz, Chief Light Pater Rocctors Dranch I!o. 1, DPM i

FR0!!:

G. it. Reinmuth, Assistant Director, Division of Reactor Ccnstruction Iaspectica, IE

SUBJECT:

CLCSE00T OF IIlCORRECT REIHFORCING STEEL PLACEFENT Ili TriE CCOLING TCL'ER BASI:t AT GRCD GULF, UNITS 1 AND 2 (AITS F21265;il) ln a ncccrandum dated 12/23/76 to Olan D. Parr, Chief, LUR !3, we sumarized the results of a joint macting held by MM and IE personnal

'}

uith rcpresentatives of Missigippi Power and Light Company. A copy of that r.:emorandua is enclosed.as Enclosure 1.

In sumw decided that IE uculd treat the deficiency as a 50.5S(e) y it nas iten and

a. fait a final report.

i Oa April 19, 1977 the licensee submitted the final report on this i

subject which indicated that an engineering reanalysis using the

~

as-built location of reinforcing steel indicated that the structural l-integrity and functional capabilities of the basin ucre not adversely l

affected. A copy of that report is onclosed as Enclosura 2.

RII inspectors follcued up on the licensco's c,losebut of the natter during an inspection in April of 1977. A copy of the pertinent parts of the IE inspection report is enclosed as Enclosure 3.

As indicated in that report provided, RII concludad that the iten was not reportable j

and the itera uss closed.

Tne abcVe facts are being forwarded to ycu to infona ycu of the resolution l

of this item. This itea was noted as still being unresolved as far as a

the infon.ution ue in IE needed to furnish !:RR.

I i

CONTACT:

R. E. Sh'.rnher, IE 7W d' " J

' (\\

49-21551

/a;9 T dl l u, u,,

e

'C F " O E >

  • * " ^ " >

D4*r >

NRC IOR.\\t 318 (N4) NBCM 0240 N u. s. cov e nw u r wr rw.wri. i or ric o t o re - e 2c.e24 7 910010 h33

C I

l 1

John F. Stolz JUL 13 ElB l

If there are any questions on this nattar please contact us.

i G

V. P. insath Assistant Director l

Division of Reacter Ccastruction Inspection Offica of Inspection and Enforcc.nant i

Enclosures:

1.

?!n.n Scyfrit to Parr datoi 12/23/E5 1

2.

Ltr. frca P.PSLC to RII de.ted 4/15/77 3.

Extracts fra.1 IE Inspectic.n Report 50-416/417/77-4 cc/fenclosures:

C. C. Thecas,!:P.R I. S. Sihuil, IGR F. P. Schauer, lip.R C. C. ":rf:y, RII 1

l 1

I l

i itCI:IE 6/D:REI:IE

-orricr

  • ou~~*

.RESh=traker G'ihinzdh_._

7/... /ZG:j r_

IL 173 om

  • O t'.s.ccwta%wtwi a % ris 2 or re ct i s y s - ea a.s r4 NRC IOR>t 319 (9 76) NRC310240

~7 iv

- e