ML19209A065

From kanterella
Jump to navigation Jump to search
Discusses Preliminary Assessment of Reinforcing Steel Placement for Cooling Tower Basin.Transfer of Lead Responsibility Will Not Be Necessary as Changes Do Not Involve Principle Architectural Criteria
ML19209A065
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/23/1976
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML19209A061 List:
References
NUDOCS 7910010836
Download: ML19209A065 (2)


Text

.

DEC 231976 P00R OR$iE NT !.0..%--416/417 110.UR31/.;rt FGT: Olan D. Ferr, Chief Lir.ht L'ater kenctors trauch No. 3, DI-N

~

Yrnis Earl V. Seyf rit, Caicf. Pxactor Technical brench, IE SUtJECT:

7Prr.ntI2ar.T fa;f2SM;fEI 071; CORRECT ntIH70ECIIC STEEL l'Lt.CnishT Fon Inf. OdLIEC TowEs MSIL AT CUuin GijLF, irs 1TS lic.1 KiL 2 l

in october 19, 197o, tne liccasse, liiusics!ppi Iover as Lisht I

Co;.pany, notified kegion II of a reportst>1e deficiency related to tue coolins tower baaiza..

In ti.o 30-day report requirca frca the licenuec it. was notcc that the deliciency had beau declared to Le a ainaificcat deficicacy 4c indicated in 10 CFh 5.;.SS(c)(1)

(iii). A ccpy of that report is e.nelor.ed.

I r.-Wit ' n to I :.c r._y t h e d n o tifice.tions to lt, the licenaec also contactw Fr.L ruculHi>g la a aceting being arraused to discuss the natter.

The meeting was held on Deceu.ber 6, 1974 in bothasda with represcutativc: of IE, sJti, OSS nad an ACKS staff ocuber.

As - res. ult of infur::.: tion preccated ort.lly at the emetin; regraint the liccesco's pralhk 7 coaccpt of the corractive heconsary, it cppe rs there la not cufficient need for a Traasfer of Lead Lecrousibility at this tine.

It in very likely that the corrective sctica vill noc involve chan;;as in the principle arenitectural and e.: nincuri:y; critcris nor carevicted cafety it er.s.

Ocaacqueurly, the cment facts do not appear to ncecumitate a:*nduents. to the liccase via the SAE. Since:these acticas are not involved as vould be required for a trannfer as defined in the Duceder 3,1972 nec.orandu:: frou the Director of Equistica to the

~

Directors o1 Legulatory Operationa and cf I *rmint, va are oati mh 6 a couruo el acLion haned ou llc currcut facts.

Our tain' irq; is that IE vill retain the responsibility for the c

resolutics of thu reporced dcficicacy based sca the current undcr-ctcadin/A.

If this emccrz muchem,essin tho future as a result of Iacte incluacc in tha licencee'n fin:1 report on the 50.55(o) iten, we will utify yoa iwadiately.

If this position is unaccept-able or ceWs additienal clarificction, pleese notify us.

I 7910010 f) j Iun

x olaa p. Part 2

0EC 20 i976 We will iecp 1:22. inforno.1 of muy new develop.<nts in this ceae throuth che 12:1, Eo tutcher.

Odginal dgned bI KV.Seyfdt,

~

P00 Jg.i' {; t ? Ij B f

~

~.9c

!Q1(b.3 i dd,.

Karl Y. Seyfrit, Chief Ecactor Technical Assistance Jr. ranch Of fica of. Inspection and Euf orecaent Lucio r.u te: Ltr., ll/1Y/20, J. F. acC,sughy,1% L to

5. C. I b elv.y, Director, Ell ec w/ez.aci. t e..
h. butcher, DY.4 I. 5. Sinwell, DSS I

Y. T. f,chauer, Lif.i CoaIAct:

E. 4.shetm ier 492-7421 EIP:1019/F21265H1 CA:FlP:IE RIA:EIP:IE nues.a'ccr:ssh 1;V5c7 it f

12/ / 7 t, 12/ /76

,)

-i