March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000413/2016006 AND 05000414/2016006
Dear Mr. Simril:
The NRC has completed its end-of-cycle performance assessment of Catawba Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Catawba Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC will conduct Temporary Instruction (TI) 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems, in March 2017 and TI 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in October 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4611 with any questions you have regarding this letter.
Sincerely,
/RA/
Frank Ehrhardt, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
Enclosure:
Catawba Inspection/Activity Plan (03/01/2017 - 12/31/2018)
cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000413/2016006 AND 05000414/2016006 March 1, 2017
DISTRIBUTION:
M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP
NAME JWorosilo FEhrhardt
DATE 2/ 16 /2017 2/17/2017
OFFICIAL AGENCY RECORD
17060A173
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 03/01/2017 - 12/31/2018 Page 1 of 2 02/28/2017 06:47:29 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification 71151 03/27/2017 03/31/2017 ISI
- UNIT 1 IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 05/08/2017 05/12/2017 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/08/2017 05/12/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/08/2017 05/12/2017 OL EXAM
- INITIAL LICENSE EXAM PREP
1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017 OL EXAM
- INITIAL LICENSE EXAM
1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]
7111105T 08/07/2017 08/11/2017 RP
- RP PUBLIC RAD SAFETY BASELINE
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/31/2017 08/04/2017 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/31/2017 08/04/2017 1, 2 IP Performance Indicator Verification 71151 07/31/2017 08/04/2017 TI-191
- MITIGATING STRATEGIES
1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/16/2017 10/20/2017 ISI
- UNIT 2 IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 03/26/2018 03/30/2018 EP
- EP EXERCISE
1, 2 IP Exercise Evaluation 7111401 06/04/2018 06/08/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/04/2018 06/08/2018 1, 2 IP Exercise Evaluation - Scenario Review 7111408 06/04/2018 06/08/2018 1, 2 IP Performance Indicator Verification 71151 06/04/2018 06/08/2018 DBAI
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
1, 2 IP Component Design Bases Inspection (Teams)
7111121M 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 03/01/2017 - 12/31/2018 Page 2 of 2 02/28/2017 06:47:29 DBAI
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
1, 2 IP Component Design Bases Inspection (Teams)
7111121M 07/16/2018 07/20/2018 1, 2 IP Component Design Bases Inspection (Teams)
7111121M 07/30/2018 08/03/2018 OL RQ
- REQUAL INSPECTION
1, 2 IP Licensed Operator Requalification Program 7111111B 08/06/2018 08/10/2018 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
1, 2 IP Problem Identification and Resolution 71152B 10/01/2018 10/05/2018 1, 2 IP Problem Identification and Resolution 71152B 10/15/2018 10/19/2018 ISI
- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM
1 IP Inservice Inspection Activities - PWR 7111108P 11/26/2018 11/30/2018 RP
- RP OCCUPATIONAL - WEEK 1
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/26/2018 11/30/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/26/2018 11/30/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/26/2018 11/30/2018 1, 2 IP Occupational Dose Assessment 71124.04 11/26/2018 11/30/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/26/2018 11/30/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2018 11/30/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/26/2018 11/30/2018 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 12/03/2018 12/07/2018 RP
- RP OCCUPATIONAL - WEEK 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/10/2018 12/14/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/10/2018 12/14/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/10/2018 12/14/2018 1, 2 IP Occupational Dose Assessment 71124.04 12/10/2018 12/14/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 12/10/2018 12/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/10/2018 12/14/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/10/2018 12/14/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.