NRC Temporary Instruction 2515/193, Implementation of Reliable Hardened Containment Vents - NRC Inspection Report 05000397/2020010
ML20085F489
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/24/2020
From: Jeffrey Josey
NRC/RGN-IV/DRP/RPB-A
To: Sawatzke B
Energy Northwest
References
IR 2020010
Download: ML20085F489 (7)


Text

March 24, 2020

SUBJECT:

COLUMBIA GENERATING STATION - NRC TEMPORARY INSTRUCTION 2515/193, IMPLEMENTATION OF RELIABLE HARDENED CONTAINMENT VENTS - NRC INSPECTION REPORT 05000397/2020010

Dear Mr. Sawatzke:

On March 12, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with Mr. H. G. Hettel, Chief Nuclear Officer, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects

Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2020010

Enterprise Identifier: I-2020-010-0048

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

March 9, 2020, to March 12, 2020

Inspectors:

R. Alexander, Senior Emergency Preparedness Inspector

G. Kolcum, Senior Resident Inspector

Approved By:

Jeffrey E. Josey, Chief

Reactor Projects Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an NRC inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

2515/193 - Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions

Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions (1 Sample)

(1) The inspectors evaluated licensee implementation of the appropriate elements of the reliable hardened containment wetwell vent as described in the plant specific submittal (ADAMS Accession No. ML19232A448) and the associated NRC safety evaluation (ADAMS Accession No. ML19350B579). Specifically, the inspectors evaluated licensee implementation of hardened containment vent system (HCVS)functional requirements, design features, maintenance and testing, quality standards, and programmatic requirements as described in Appendix A of TI 2515/193.

Further, the inspectors evaluated licensee implementation of the appropriate elements of the reliable wetwell venting strategy as described in the plant specific submittal (ADAMS Accession No. ML19232A448) and the associated NRC safety evaluation (ADAMS Accession No. ML19350B579). Specifically, the inspectors evaluated licensee implementation of the severe accident water addition and management (SAWA/SAWM) functional requirements, installed instrumentation, maintenance and testing, and programmatic requirements as described in Appendix B of TI 2515/193.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 12, 2020, the inspectors presented the NRC inspection results to Mr. H. G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2515/193

Calculations

ME-02-14-02,

Appendix H

Suppression Pool Freeboard Available During Extended

Loss of AC Power (ELAP)

003

Corrective Action

Documents

Action Requests

(ARs)

350650, 366752, 380025, 384464, 38210, 390256, 390257,

395869, 397967, 403046, 403048

Corrective Action

Documents

Resulting from

Inspection

Action Requests

(ARs)

404947, 404961, 404962, 405021

Miscellaneous

ER000260

Equipment Operator Requalification: Primary Containment

(including HCVS)

09/12/2019

ER000719

Equipment Operator Requalification: Hardened Containment

Vent (HCV)

06/12/2017

ER000759

Equipment Operator Requalification: Standards Updates

(including SAWA/SAWM)

03/14/2019

FLEX-01

FLEX Program Document

& 3

IC000725

JITT/Maintenance: Hardened Containment Vent (HCV)

System

2/22/2015

LDCN-15-033

EC 13094, Addition of Wetwell Hardened Containment Vent

(HCV) System

000

LDCN-17-005

Revise LCS Table 1.6.1.3-1, Primary Containment Isolation

Valves, to include new valves HCV-V-1 and HCV-V-2

000

LDCN-18-027

New LCS RFO 1.11.1

000

LR002303

LORQ: Cycle 16-1 Updates (including HCVS)

01/07/2016

LR002374

LORQ: Hardened Containment Vent (HCV) System

05/23/2017

LR002455

LORQ: Cycle 19-2 Updates (including SAWA/SAWM)

03/14/2019

Procedures

ABN-FSG-002

Water Makeup Strategies for RPV, SFP, DW, WW During an

Extended Loss of AC Power or other Beyond Design Basis

Event

008, 009,

010, and

010.001

PPM 1.5.18

Managing B.5.b and FLEX Equipment Unavailability

009

PPM 5.1.1

RPV Control EOP

2

PPM 5.1.8

Alternate Level/Pressure Control EOP

000

PPM 5.2.1

Primary Containment Control EOP

28

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PPM 5.5.14

Emergency Wetwell Venting

010

PPM 5.6.1

SBO/ELAP

030.001

PPM SAG1

RPV Control SAG

006

PPM SAG1-TAB-

B

Core Debris Has Breached the RPV

003

SOP-FLEX-

EQUIPMENT-

REFUEL

FLEX Equipment Refueling

005

SOP-HHGP-

START-QC

High Head Godwin Pump Start - Quick Card

001

Self-Assessments XC-19007-N-R-

001

Order EA-13-109 Compliance Assessment

01/09/2020

Work Orders

WO 02082834-01

AOV Valve Testing, HCV-V-1

04/24/2017

WO 02082834-02

AOV Valve Testing, HCV-V-2

04/24/2017

WO 02082836-04

Valve Stroke Verification for HCV-V-1 and HCV-V-2

05/19/2017

WO 02082836-12

Final Walkdown Fukushima EC 13094 (HCV)

06/03/2017

WO 02083371-12

HCV - Calibrate/Test Radiation Detector

05/04/2017

WO 02083371-12

HCV - Calibrate/Test Temperature Indicator

05/08/2017

WO 02083371-24

Program and Test New Battery Charger E-C0-3

05/12/2017

WO 02118301-01

TSP-HCV/X58-C801: LLRT of HCV-V-1 and HCV-V-2

05/29/2019

WO 02128517-01

HCV-MV/I-1 Replacement

06/28/2018

WO 02136310-01

FLEX-P-1, Flow and Pressure Verification Test OSP-FLEX-

A101

05/02/2019

WO 02141336-01

HCVS NITROGEN BOTTLES, Verify pressure in Nitrogen

Bottles

2/23/2019

WO 02148863-01

FUNCTION TEST-HCVRDMN: Function Test for HCV Rad

Monitor

11/02/2019

WR 29135683

Perform LLRT on HCV-V-1 and 2 (post installation)

06/07/2017

WR 29142524

HCV-RI-1 reading E1 (10) R/hr, midscale

05/15/2018