IR 05000389/1978011

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-389/78-11 on 781106-09.No Noncompliance Noted.Major Areas Inspected:Reactor Coolant Pressure Boundary Pipe Welding Procedures & Safety Related Pipe Welding
ML17206A591
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/29/1978
From: Conlon T, Crowley B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17206A590 List:
References
50-389-78-11, NUDOCS 7901050015
Download: ML17206A591 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11 101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303 Report No.:

50-389/78-11 Docket No.:

50-389 License No.:

CPPR-144 Category:

A2 Licensee:

Florida Power 6 Light Company P. 0.

Box 013100 Miami, Florida 33101 Facility Name:

St. Lucie, Unit 2.

Ins'pection at:

Hutchinson Island, Florida Inspection conducted:

November 6-9, 1978 Inspectors.

B. R. Crowley Reviewed by:< ~i T. E. Conlon, Chief Engineering Support Section No.

Reactor Construction and Engineering Support Branch

]( Zc Da e

Ins ection Summa Ins ection on November 6-9 1978 (Re ort No. 50-389/78-11)

boundary pipe welding procedures, safety related pipe welding, containment welding.

The inspection involved 25 inspector-hours on site by one NRC inspector.

Results:

No items of noncompliance or deviations were identified.

algol.05 Dc 15

B().>4'P..~"

RII Rpt.

No. 50-389/78-11 DETAILS I Prepared by:

B. R. Crowley, Metallurgical E gineer Engineering Support Section No.

Reactor Construction and Engineering Support Branch r

Reviewed by:

T. E.

Con on, hief Engineering Support Section No.

Reactor Construction and Engineering Support Branch Date

]g Pr Date 1.

Persons Contacted a.

Florida Power and Li ht Com an (FP&L)

N. T.

Weems, Assistant QA Manager

  • W. M. Hayward, QA Engineer-E.

W. Sherman, QA Engineer J.

W. Adams, QA Engineer R. A. Symes, QA Engineer B.

M. Parks, QA Engineer-D. R. Stone, Construction QC Superintendent J.

L. Parker, Project QC Superintendent W. F. Jackson, Welding Superintendent W.

N. Johnson, Site Piping Superintendent D.

G. Eldridge, Piping Superintendent M. Taras, Materials Engineer b.

Contactor Or anizations Chica o Brid e and Iron Com an (CBGI)

C. L. Fields, Project Welding and QA Superintendent D.

M. Swann, QA Engineer

  • Denotes those present at the exit interview..

2.

Licensee Action on Previous Ins ection Findin s

Actions on previous findings were not examined during this inspectio RII Rpt.

No. 50-389/78-11 I-2 3.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations.

An unresolved item identified during this inspection is discussed in paragraph 5.

4.

Inde endent Ins ection Effort r

The following areas of interest were examined by the inspector:

a.

Containment Weldin The containment is being welded in accordance with the ASME Boiler and Pressure Vessel Code,Section III, Subsection NE, 1971 Edition with addenda through the Winter of 1972 as implemented by Ebasco Project Specification No. FL0-2998-757,

"Ebasco Specification Steel Containment Vessel".

The following records and in-process welding were examined by the inspector:

It (1)

For the vessel shell and bottom head, post weld heat treatment (PWHT) records consisting of "Post Weld Heat Treatment Time Temperature Tabulations" and Strip Chart Recordings (Ijl for thermocouples A1 - A24 and

//2 for thermocouples B1 - B18) were reviewed and compared with the requirements of CB&I procedure HTP-(73-7302)-11B.

(2)

The inspector observed in-process welding of attachments 39-1 and 40-1 to Assy.

A, Ring E and 78A-A, 64 C/L, and 64 D/L Assy. L, Ring E.

Weld appearance, evidence of QC acceptance of fitup, welder qualification, and use of the correct welding procedure were examined.

b.

Safet Related Pi e Weldin Safety related piping is being welded in accordance with the ASME Boiler and Pressure Vessel Code,Section III, Subsections NC and ND, 1977 Edition with addenda through the summer of 1977.

The inspector observed the following Safety. Injection in-process welds:

Weld

Weld

Line 362 Line 111 In-process weld records, weld appearance and welder qualifi-cation were examine RII Rpt.

No. 50-389/78-11 I-3 c.

The inspector discussed with the licensee the plans for preservice inspection (PSI) of major equipment.

Plans are to use shop post hydro inspection data to the extent allowed by the applicable Section XI ASIDE Code.

The data will be presented to NRC for review at a future date after the data has been analyzed to insure that licensee commitments have been met.

F In the areas inspected, no items of noncompliance or deviations were identified.

5.

Reactor Coolant Pressure Boundar Pi in (Weldin ) - Review of ualit Assurance Im lementin Procedures The inspector reviewed the quality assurance implementing procedures listed below, relative to reactor coolant pressure boundary pipe welding, to determine whether adequate procedures are included or referenced in the QA manual.

The applicable welding code is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NB, 1977 Edition with addenda through the summer of 1977.

These procedures were reviewed in the areas of; witness or inspection hold poit welding procedures and welding personnel, qualification of NDE procedures and personnel, calibration and maintenance of welding and NDE equipment, control of contaminants in NDE equipment, control and documentation of the welding and inspection processes, heat treatment procedures, evalu-ation of weld quality by the proper NDE method, defect repair, and welding material controls

"ASME Quality Assurance Hanual" AQR 7.1, Rev.

1, "Receiving Inspection" AQR 9.0, Rev.

2, "Control of Installation Process" AQR 9.1, Rev.

3, "Control of Welding During Construction" AQR 9.2, Rev.

1, "Storage and Distribution of Haterials" AQR 10.0, Rev. 2, "Examination and Test Verification" AQR 10.1, Rev.

2,

"QC Inspection" AQR 15.4, Rev.

1, "Weld Repair Reports" Construction Site Procedures CSP 5,

"Weld material Control" CSP 6, "Welder and Welder Operator Qualification" CSP 10,

"Weld Repair Procedure" CSP 32, "Field Welding Control" CSP 40, "Control of Calibrated Heasuring and Testing Equipment" CSP 41, "Control of Heat Treatment"

RII Rpt.

No. 50-389/78-11 I-4 C.

Quality Instructions QI 2.7, Rev.

4,

"NDE Personnel Qualification and Certification" QI 7.1 "Instructions for Receiving Inspection of Seismic or Safety Related Material" QI 9.2, Rev.

3, "Inspection of Field Melding" QI 9.3, Rev.

1, "Radiographic Inspection" QI 9.4, Rev.

1, "Magnetic Particle Inspection" QI 9.5, Rev.

3, "Liquid Penetrant Inspection" QI 9.9, Rev.

0, "Ultrasonic Inspection" QI 12.1, Rev. 2, "Control & Calibration of Tools, Gauges and Test Devices" QA Manual QP 9.1 "Control of Special Processes for Construction" QP 10.2, "Inspection of Plant Construction" e.

Administrative Site Procedures ASP 6, "Control of Special Processes" During review of the above procedures the inspector identified two problems with the procedures to be used for the control of heat treatment.

The site has decided to use the 1977 edition of Section III of the ASME Code including addenda through the summer of 1977 for piping installation.

However, the heat treatment procedure, CSP 41, requires the use of the "latest edition and addenda" of the code.

Paragraph NCA 1140(e) of the 1977.edition of Section III of the code states that, "It is permitted to use specific provisions within an Edition or Addenda provided that all related requirements are met."

Therefore, the use of 'the "latest edition and addenda" for heat treatment would require a review each time a

new edition or addenda is issued to insure that all related requirements are being met.

The licensee stated that the procedure has not yet been used and will be revised prior to use to specify a specific edition and addenda to the code.

(2)

The procedures for the control of heat treatment do not contain any requirements for the method of heating or the controls to be used where a preheat temperature other than ambient is to be used.

The licensee stated that this was an oversight, but no pipe welds requiring preheat other than ambient have yet been welded.

The licensee further stated that controls will be added to applicable procedure ~

~

RII Rpt.

No. 50-389/78-11 I-5 These two problems with procedures for the control of heat treatment will be considered unresolved and identified as item Number 389/78-11--01.

In the areas inspected, no items of noncompliance or deviations were identified.

6.

Safet Related Pi in (Meldin ) - Review of ual>t Assurance I

lementin Procedures The procedural review and inspection results of paragraph 5 above also apply to safety related pipe welding in that safety related piping is being welded under the same control procedures as reactor coolant pressure boundary piping.

The welding code referenced in paragraph

applies except that subsections NC and ND are applicable in lieu of subsection NB.

7.

Exit Interview The inspector met with licensee representatives denoted in paragraph

at the conclusion of the inspection and summarized the scope and findings of the inspection.

The unresolved item of paragraph 5 was discussed and the licensee stated that procedures would be revised to resolve the problem.

The inspection included observation and review of records for containment welding, observation and review of procedures for pipe welding, and discussion of PSI plans.