August 28, 2025
SUBJECT:
UPDATED INSPECTION PLAN FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (REPORT 05000387/2025005 AND 05000388/2025005)
Dear Brad Berryman:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for the Susquehanna Steam Electric Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
The enclosed inspection plan includes implementation of NRC Inspection Procedure 92709, Licensee Strike Contingency Plans, because union contract negotiations were ongoing at the time of writing of this letter and inspection procedure implementation is imminent or has been entered.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5358 with any questions you have regarding this letter.
Sincerely, Sherlyn I. Haney, Acting Chief Projects Branch 1 Division of Operating Reactor Safety
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
Susquehanna Inspection Plan
cc w/encl: Distribution via ListServ SHERLYN HANEY Digitally signed by SHERLYN HANEY Date: 2025.08.28 07:58:08 -04'00'
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME DBeacon SHaney
DATE 8/25/2025 8/25/2025
Site Inspection Activity Plan Susquehanna 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count 2025 SQ Initial Operator Licensing Exam
1,2 7/21/2025 7/25/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1,2 7/28/2025 8/1/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Comprehensive Engineering Team Inspection - Susquehanna
1,2 8/25/2025 8/29/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 9/8/2025 9/12/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Licensee Strike Contingency Plan
1,2 8/29/2025 9/30/2025 IP 92709 000907 Licensee Strike Contingency Plans SQ Requal Inspection with P/F Results
1,2 9/8/2025 9/12/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/8/2025 9/12/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance ISFSI Monitoring Inspection and License Renewal - SQ
1,2 9/22/2025 9/26/2025 IP 60855 Operation Of An ISFSI 1,2 9/22/2025 9/26/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection RP - 71124.05 Instruments
1,2 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation EP Program Inspection - Susquehanna
1,2 10/27/2025 10/31/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 10/27/2025 10/31/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 10/27/2025 10/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/27/2025 10/31/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 10/27/2025 10/31/2025 IP 71151 001397 Performance Indicator Verification Access Control, AA, FFD, Sec Plan Review, PI - Susq
1,2 11/3/2025 11/7/2025 IP 71130.01 000733 Access Authorization 1,2 11/3/2025 11/7/2025 IP 71130.02 000734 Access Control 1,2 11/3/2025 11/7/2025 IP 71130.08 000740 Fitness-For-Duty Program 1,2 11/3/2025 11/7/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/3/2025 11/7/2025 IP 71151 001338 Performance Indicator Verification RP - 71124.08 Rad Transportation PIV and 71151 PIV
1,2 11/17/2025 11/21/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Prepared on 8/25/2025 6:54:12 AM 1 of 4
Site Inspection Activity Plan 1,2 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification Age Related Degradation - Susquehanna
1,2 1/12/2026 1/16/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 1/26/2026 1/30/2026 IP 71111.21N.04 001832 Age-Related Degradation RP 71124.03 SQ
1,2 2/2/2026 2/6/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Inservice Inspection - Susquehanna Unit 1
1 3/30/2026 4/3/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 4/6/2026 4/10/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls PI&R Biennial Team Inspection - Susquehanna
1,2 6/8/2026 6/12/2026 IP 71152B 000747 Problem Identification and Resolution 1,2 6/22/2026 6/26/2026 IP 71152B 000747 Problem Identification and Resolution ISFSI - Loading Campaign - Susquehanna
1,2 8/31/2026 9/4/2026 IP 60855 Operation Of An ISFSI Sec - Access Control, Equipment Testing and Maintenance, Defensive Strategy, SPR, TSR, PI - Susq
1,2 9/14/2026 9/18/2026 IP 71130.02 000734 Access Control 1,2 9/14/2026 9/18/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 9/14/2026 9/18/2026 IP 71130.05 000737 Protective Strategy Evaluation 1,2 9/14/2026 9/18/2026 IP 71130.09 001656 Security Plan Changes 1,2 9/14/2026 9/18/2026 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 9/14/2026 9/18/2026 IP 71151 001338 Performance Indicator Verification EP Exercise Inspection - Susquehanna
1,2 10/19/2026 10/23/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/19/2026 10/23/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 10/19/2026 10/23/2026 IP 71151 001397 Performance Indicator Verification RP 71124.04 and PIV SQ
1,2 10/26/2026 10/30/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 10/26/2026 10/30/2026 IP 71151 000746 Performance Indicator Verification RP 71124.05 Instruments
1,2 2/1/2027 2/5/2027 IP 71124.05 000729 Radiation Monitoring Instrumentation 2027 Susquehanna Initial Operator Licensing Exam
1,2 1/18/2027 1/22/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 2/22/2027 2/26/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Unit 2
2 3/29/2027 4/2/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Prepared on 8/25/2025 6:54:12 AM 2 of 4
Site Inspection Activity Plan RP 71124.01 Rad Hazards
1,2 4/5/2027 4/9/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Prepared on 8/25/2025 6:54:12 AM 3 of 4
Site Inspection Activity Plan Susquehanna 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count ISFSI - License Renewal and Monitoring, Susquehanna
9/22/2025 9/26/2025 IP 60855 001001 Operation Of An ISFSI 9/22/2025 9/26/2025 IP 60859 001921 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection ISFSI - Loading Campaign - Susquehanna
8/31/2026 9/4/2026 IP 60855 001001 Operation Of An ISFSI Prepared on 8/25/2025 6:54:12 AM 4 of 4