IR 05000387/2025403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000387/2025403 and 05000388/2025403
ML25343A010
Person / Time
Site: Susquehanna  
Issue date: 12/09/2025
From: Brice Bickett
Division of Operating Reactors
To: Berryman B
Susquehanna
References
IR 2025403
Download: ML25343A010 (0)


Text

December 9, 2025

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000387/2025403 AND 05000388/2025403

Dear Brad Berryman:

On November 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2, and discussed the results of this inspection with Doug LaMarca, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000387 and 05000388

License Numbers:

NPF-14 and NPF-22

Report Numbers:

05000387/2025403 and 05000388/2025403

Enterprise Identifier: I-2025-403-0036

Licensee:

Susquehanna Nuclear, LLC

Facility:

Susquehanna Steam Electric Station, Units 1 and 2

Location:

769 Salem Blvd. Berwick, PA

Inspection Dates:

November 18, 2025 to November 20, 2025

Inspectors:

T. Eck, Senior Physical Security Inspector

C. Davis, Physical Security Inspector

J. Edwards, Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1)20 Requirements (02.01 a - c; 02.02 a - g, i, j; 02.04 a; 02.05 a; 02.06 a, b; 02.07 a, b; 02.08 b, c)

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)19 Requirements (02.01 a - c; 02.02 c - g; 02.04 a, e; 02.05 a; 02.06 b, c; 02.08 e - i; 02.09)

71130.08 - Fitness-For-Duty Program

The inspectors evaluated the fitness-for-duty program by completing the following inspection

===elements:

Fitness-For-Duty Program===

(1)23 Requirements (02.01 a; 02.02 a; 02.03 a, b; 02.04 a - c; 02.05 a - d, g - j; 02.06 a, b, d, g; 02.09 d, e; 02.10; 02.12 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 17 to 18 was implemented. Based on the licensee's evaluation, and in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.54(p)(2),the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the change remains subject to future NRC inspection in its entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) October 1, 2024 through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On November 20, 2025, the inspectors presented the security baseline inspection results to Doug LaMarca, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Procedures

NDAP-00-2001

Site Access Program

Revision 24

NDAP-00-2003

Critical Group

Revision 5

SA-SAI-001

Review of Personal History Questionnaire

Revision 0

SAI-WI-02

Establishing Identity of Individuals for Unescorted Access

Authorization

Revision 2

SAI-WI-037

Guidelines for Adjudicating Trustworthiness, Reliability and

FFD

Revision 8

Self-Assessments DPA-01-DI-2024-

04122

Access Authorization 2025 NRC Inspection Self Assessment

06/05/2025

71130.02

Procedures

NS-SSP-002

Control, Issuance, and Assignment of Security Controlled

Locks and Keys

Revision 24

SI-SO-003

Duties and Responsibilities of the Access Control Officer

Revision 50

SI-SO-006

Duties and Responsibilities of the South Gate House Search

Officer

Revision 82

SI-SO-008

Emergency Access and Egress

Revision 22

SI-SO-034

Duties and Responsibilities of the Vehicle Search Officer

Revision 19

71130.08

Corrective Action

Documents

25-07091,

25-08406,

25-08701,

25-14242,

25-06398,

25-02265,

25-02909,

25-10268,

25-10262

Procedures

Generic Fitness for Duty and Behavior Observation Lesson

Plan

Revision 4

NDAP-00-2002

Fitness for Duty/Behavior Observation Program

Revision 28

Self-Assessments AR-2022-15916

23 Access Authorization & FFD Audit Report

DPA-03-DI-2024-

04122

Fitness for Duty 2025 NRC Inspection Self-Assessment

71130.09

Procedures

Susquehanna Nuclear, LLC, Security Plan, Training and

Revision 18

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Qualification Plan and Independent Spent Fuel Storage

Installation Security

71151

Miscellaneous

PI data from October 1, 2024, through September 30, 2025