Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] Category:License-Operator
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents 2023-11-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents ML15125A4812015-05-0505 May 2015 Initial Exam 2014-301 Final Simulator Scenarios ML15125A4832015-05-0505 May 2015 Initial Exam 2014-301 Final Sim IN-Plant JPMs ML15125A4902015-05-0505 May 2015 Initial Exam 2014-301 Final Administrative JPMs ML15125A4762015-05-0505 May 2015 Initial Exam 2014-301 Draft Adiminstrative JPMs 2023-11-03
[Table view] |
Text
rch 21, 2005
SUBJECT:
MCGUIRE NUCLEAR STATION - NRC EXAMINATION REPORT 05000369/2005301 AND 05000370/2005301
Dear Mr. Peterson:
During the period February 7-15, 2005, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for licenses to operate the McGuire Nuclear Station. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on February 18, 2005.
All applicants passed both the written examination and operating test. A Simulation Facility Report is included in this report as Enclosure 2. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operator Licensing Branch Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosures:
(See page 2)
DEC 2 Enclosures: 1. Report Details 2. Simulation Facility Report
REGION II==
Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Report No.: 05000369/2005301 and 05000370/2005301 Licensee: Duke Energy Corporation Facility: McGuire Nuclear Station Location: 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Dates: Operating Tests - February 7-15, 2005 Written Examination - February 18, 2005 Examiners: G. Hopper, Chief License Examiner S. Rose, Senior Operations Engineer T. Kolb, Operations Engineer Approved by: James H. Moorman, III, Chief Operator Licensing Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000369/2005301, ER 05000370/2005301; 2/7-15/2005; McGuire Nuclear Station, Units 1 and 2; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period February 7-15, 2005. Members of the McGuire Nuclear Station training staff administered the written examination on February 18, 2005. The written examinations and the operating tests were developed by the McGuire Nuclear Station training staff. Six Reactor Operators (RO) and Seven Senior Reactor Operators (SRO) passed both the operating test and written examination. All of the applicants were issued operator licenses commensurate with the level of examination administered.
No findings of significance were identified.
Enclosure 1
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The licensee developed operating tests and written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The NRC examination team reviewed the proposed examinations.
Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated six Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of February 7-15, 2005. Members of the McGuire Nuclear Station training staff administered the written examination on February 18, 2005. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the McGuire Nuclear Station, met requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the licensees examination submittal was within the range of acceptability expected for a proposed examination. All of the applicants passed both the operating and written examinations. The RO and SRO written examinations and answer keys may be accessed in the ADAMS system (ADAMS Accession Numbers, ML050750414 and ML050750420).
The exam team noted generic weaknesses in the use of Technical Specifications (TS)
during the performance of administrative Job Performance Measures and during the simulator scenarios. Many applicants did not recognize all entry conditions for TS Limiting Conditions for Operations (LCO). During one JPM, six of seven SRO applicants failed to correctly determine the operability of the Leakage Detection System following an earthquake, and entered the wrong LCO. Following a simulator scenario, three SRO applicants failed to identify that pressurizer pressure had decreased below the Departure from Nucleate Boiling (DNB) limits and that TS (Section 3.4.1) was applicable. Also during a scenario, one SRO applicant incorrectly evaluated the plant Enclosure 1
status and entered the LCO for one Diesel Generator (DG) being inoperable. The other DG had been identified as Tagged Out at the start of the scenario. These and other examples of incorrect application of TS were documented in the Individual Examination Report (Form ES-303-1) packages. Copies of these reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
4OA6 Meetings Exit Meeting Summary On February 16, 2005, the examination team discussed generic issues with Mr. and members of his staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel S. Bradshaw, Superintendent of Operations K. Crane, Technical Specialist - Regulatory Compliance J. Kammer, Safety Assurance Manager T. Hamilton , Training Manager T. Harrall, Station Manager D. McCorkle, Operations Shift Manager A. Orton, Manager Operator Training G. Peterson, McGuire Site Vice President R. Pope, Supervisor, Initial Operator Training C. Sawyer, Operations Training G. Rumfelt, Operations Training NRC personnel J. Brady, Senior Resident Inspector Enclosure 1
SIMULATION FACILITY REPORT Facility Licensee: McGuire Nuclear Station Facility Docket Nos.: 05000369 and 05000370 Operating Tests Administered on: February 7-15, 2005 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, examiners observed the following items:
MAL NV - 1A : NV Pump trigger did not function during one out of four runs of scenario 2. The major transient (LOCA) resulted in a Safety Injection initiation and the 1A NV pump was suppose to trip. The simulator operator had to use the rack breaker out feature to turn pump off.
MAL IFE009D : Feedwater Regulating Valve Fails Open malfunction actually runs valve closed before it ramps back open to 100 %. Actual controller failure would initiate ramp to full open position from preexisting FRV position.
Enclosure 2