UNITED STATES ebruary 25, 2011

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR STATION - NRC INSPECTION REPORT 05000369/2011402 AND 05000370/2011402

Dear Mr. Repko:

On January 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your William B. McGuire Nuclear Station, Units 1 and 2. The inspection also involved an evaluation of the required actions in Confirmatory Order EA-09-252, dated June 2, 2010. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 27, 2011, with yourself and other members of your staff.

The inspection examined activities conducted under your license as they relate to security, safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is NRC identified.

The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Human Performance. H.4 (b) in that, the licensee failed to communicate expectations regarding procedural compliance and personnel failed to follow procedures. If you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Farley Nuclear Plant. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, RII, and the NRC Senior Resident Inspector at Farley Nuclear Plant. DPC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure:

Inspection Report 05000369/2011402 and 05000370/2011402 w/Attachment: Supplemental Information (Official Use Only)

cc w/encl.: (See page 3) DPC 3 cc w/encl:

cc w/Inspection Summary Regis Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC MGO1VP / 12700 Hagars Ferry Road Huntersville, NC 28078 Kenneth L. Ashe Regulatory Compliance Manager Duke Energy Carolinas, LLC MN01RC 12700 Hagers Ferry Road Huntersville, NC 28078-8985 H. Duncan Brewer Safety Assurance Manager Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road, MG01VP Huntersville, NC 28078-8985 David G. Black Security Manager Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road, MG01SC Huntersville, NC 28078-8985 Ellis S. Sellers Security Safeguards Administrator Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road, MG01SC Huntersville, NC 28078-8985 David A. Cummings Assistant General Counsel Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Timothy J. Wadsworth Security Specialist Duke Energy Carolinas, LLC P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006 ML110560860 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRS RII:DRS RII:DRP SIGNATURE RA RA/JW FOR RA NAME ARICHARDSON MERNSTES JBARTLEY DATE 02/23/2011 02/24/2011 02/23/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO